Investor Presentation - with Welchau-1 Data Review
Released
Released
Announcement PDF
“Investor Update – Focussed on Review
of Welchau-1 Well Results”
An ASX listed European Energy
Producer and Explorer
“Reliable energy doesn’t need to cost the earth”
I n v e ASX:
s t o rADX
Update |
adx-energy.com
1 5 A p r i l 2 0 2 4 | We l c h a u D a t a R e v i e w
ASX:ADX
2
Disclaimer Statement
Important notice:
This document has been prepared by ADX Energy Ltd (“ADX”) for the purpose of providing information to interested analysts, investors and shareholders. Any statement, opinions, projections, forecasts or other materials contained in this document do not constitute any commitments, representations or
warranties by ADX or its directors, agents and employees.
Except as required by law, and only to the extent so required, directors, agents and employees of ADX shall in no way be liable to any person or body for any loss, claim, demand, damages, costs or expenses of whatsoever nature arising in any way out of, or in connection with, the information
contained in this document. This document includes certain statements, opinions, projections, forecasts and other material, which reflect various assumptions. The assumptions may or may not prove to be correct. ADX recommends that potential investors consult their professional advisor(s) as
investment in the company is considered to be speculative in nature.
The information in this presentation is in summary form only and does not contain all the information necessary to fully evaluate any transaction or investment. It should be read in conjunction with ADX’ other periodic and continuous disclosure announcements lodged with the ASX. This document does
not constitute an offer, invitation or recommendation to subscribe for or purchase securities and does not form the basis of any contract or commitment.
Pursuant to the requirements of the ASX Listing Rule 5.41 the technical and Prospective Resources information relating to Austria and Italy contained in this presentation has been reviewed by Paul Fink as part of the due diligence process on behalf of ADX. Mr. Fink is Technical Director of ADX Energy Ltd
is a qualified geophysicist with 30 years of technical, commercial and management experience in exploration for, appraisal and development of oil and gas resources. Mr. Fink is a member of the EAGE (European Association of Geoscientists & Engineers) and FIDIC (Federation of Consulting Engineers).
Independent audit of developed reserves have been completed for ADX’ Zistersdorf and Gaiselberg fields (“Fields”) in the Vienna basin and Anshof in Upper Austria (Austria) by RISC Advisory Pty Ltd (“RISC”). RISC conducted an independent audit of ADX’ Fields evaluations, including production forecasts,
cost estimates and project economics. Production from existing wells is classified as Developed Producing. Production from planned recompletion of existing wells to new intervals is classified as Developed Non-Producing. RISC is an independent advisory firm offering the highest level of technical and
commercial advice to a broad range of clients in the energy industries worldwide. RISC has offices in London, Perth, Brisbane and South-East Asia and has completed assignments in more than 90 countries for over 500 clients and has grown to become an international energy advisor of choice.
PRMS Reserves Classifications used in this presentation:
Developed Reserves are quantities expected to be recovered from existing wells and facilities.
Developed Producing Reserves are expected to be recovered from completion intervals that are open and producing at the time of the estimate.
Developed Non-Producing Reserves include shut-in and behind-pipe reserves with minor costs to access.
Undeveloped Reserves are quantities expected to be recovered through future significant investments.
A. Proved Reserves (1P) are those quantities of Petroleum that by analysis of geoscience and engineering data, can be estimated with reasonable certainty to be commercially recoverable from known reservoirs and under defined technical and commercial conditions. If deterministic methods are used,
the term “reasonable certainty” is intended to express a high degree of confidence that the quantities will be recovered. If probabilistic methods are used, there should be at least a 90% probability that the quantities actually recovered will be equal or exceed the estimate.
B. Probable Reserves are those additional Reserves which analysis of geoscience and engineering data indicate are less likely to be recovered than Possible Reserves. It is equally likely that actual remaining quantities recovered will be greater than or less than the sum of the estimated Proved plus
Probable Reserves (2P). In this context, when probabilistic methods are used, there should be at least a 50% probability that the actual quantities recovered will equal or exceed the 2P estimate.
C. Possible Reserves are those additional Reserves that analysis of geoscience and engineering data suggest are less likely to be recoverable that Probable Reserves. The total quantities ultimately recovered from the project have a low probability to exceed the sum of Proved plus Probable plus Possible
(3P) Reserves, which is equivalent to the high-estimate scenario. When probabilistic methods are used, there should be at least a 10% probability that the actual quantities recovered will equal or exceed the 3P estimate. Possible Reserves that are located outside the 2P area (not upside quantities to
the 2P scenario) may exist only when the commercial and technical maturity criteria have been met (that incorporate the Possible development scope). Standalone Possible Reserves must reference a commercial 2P project.
Prospective Resource Classifications used in this presentation:
Prospective Resources are those estimated quantities of petroleum that may potentially be recovered by the application of a future development project(s) related to undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development. Further explorations
appraisal and evaluation is required to determine the existence of a significant quantity of potentially moveable hydrocarbons.
P(90) Estimate: means at least a 90% probability that the quantities actually recovered will equal or exceed the estimate.
P(50) Estimate: means At least a 50% probability that the quantities actually recovered will equal or exceed the estimate.
P(10) Estimate: means At least a 10% probability that the quantities actually recovered will equal or exceed the estimate.
Oil and Gas Conversions
BOE means barrels of oil equivalent. Bcfe means billion of cubic feet of gas equivalent. Gas to oil conversion used in this presentation: 6 mcf of gas = 1 barrel of oil. Mcf means thousand cubic feet of gas
Investor Presentation – 15 April 2024
Investment Proposition and
Operating Strategy
Increasing
Operating
Cashflow
Reserves and
Production
Growth from
New Discovery
320 boepd net
oil & gas production1
3
World-class
Exploration
Portfolio in the
heart of Europe
Value Adding,
Complementary
Renewable
Projects
1.64 mmbbl 2P reserves @
Vienna Basin Fields only.
Anshof Field subject to review 2
Operating
Capability
• Ability to
generate
and
operate
projects
213 mmboe
3
prospective resources
Active Drilling
Program
• Funded by
Farmouts
• Validation
& risk
reduction
47 MW combined
renewable energy
potential
Prospective Resources are those estimated quantities of petroleum that may potentially be recovered by the application of a
future development project(s) related to undiscovered accumulations. These estimates have both an associated risk of discovery and a risk
of development. Further explorations appraisal and evaluation is required to determine the existence of a significant quantity of
potentially moveable hydrocarbons
1 April
2023 average production from the Zistersdorf & Gaiselberg fields and Anshof field. 2 ref. Reserves Reporting Date & Valuation (Independently Audited) 04.11.2021 less production to 31
December 2023, 3 Best technical prospective resources for Upper Austria only. Prospective resources reporting date update 22.06.2023
Investor Presentation – 15 April 2024
4
Corporate and Asset Summary
Positioned for a smarter, cleaner future for Europe
Austria Oil & Gas Assets
Austria Clean Energy Projects
Vienna Basin fields – 100% (production)
Anshof oil discovery – 50% (production & development)
ADX-AT-I & ADX-AT-II – 100% (exploration & appraisal)
Vienna Basin Green Hydrogen project – 100%
GMU geothermal project – 100%
Vienna Basin solar project – 100%
Capital Structure
Share price as at 11.04.2024
A$ 0.12
Number of shares
438.8 m
Number of options
64.3 m
Market capitalisation
A$ 52.7 m
Cash (unrestricted) as at 31.03.2024 - estimated
A$ 7.0 m
Debt (net of restricted cash for debt)
A$ 1.9 m
Enterprise value
A$ 47.5 m
Number of shareholders
2,135
Political & Strategic Position
Stable jurisdictions with unmet energy demand
Excellent access to infrastructure
d363C.R-.AX permit (Italy)
Romania Oil & Gas Assets
Shallow waters offshore exploration permit – 100%
369 Bcf prospective resources1 (5 prospects)
Subject to ratification by the Italian authorities
49.2% shareholding in Danube Petroleum which holds:
- Parta exploration licence – 100%
- Iecea Mare production licence – 100%
Strong focus on energy security since Ukraine war
Operatorship capability & boots on the ground
Refer to Cautionary Statement in relation to Prospective Resources on Page 3 of this
presentation
Investor Presentation – 15 April 2024
1 The original resources reporting date was on 30.08.2022
5
Our focus is on Austria
Ideal place to build a diversified energy business
Permits
& Environment
Approvals
Permiting
& Environmental Approvals
(months)
Australian
Licht
Anshof
Welchau
0
10
20
A significant oil and gas industry
1 billion bbl oil & 2.7 Tcf gas
produced to-date
75-Year oil & gas duopoly
before ADX became the
third operator in country
Energy Demand is unmet
by local supply resulting in
Upper Austria Assets
Production, Exploration & Geothermal
50% exploration success rate 1,
infrastructure access, 3D seismic data set &
extensive portfolio
Investor Presentation – 15 April 2024
ADX Vienna Basin Fields
Oil and gas production,
H2 production & storage, Solar Park
Stable long life production, depleted reservoirs
for storage & connected to power grid as well as
oil gas pipelines
¹ In Upper Austria since 2000 -11 discoveries out of 22 wells
High Value Markets
Excellent Infrastructure that is
highly accessible and Favourable
Regulatory Processes
30
6
Very favourable gas market dynamics
Large premium to US & structurally higher long-term prices
Fundamental
Dutch TTF vs U.S. natural gas and Asian LNG1
Dutch TTF (USD per MMBtu)
5(x) price increase due
45.0
U.S. natural gas (USD per MMBtu)
to Russia’s invasion of
Ukriane
LNG JKM (Platts) (USD per MMBtu)
40.0
USD per MMBtu
to
the
European gas market since Russia’s
invasion of Ukraine in Feb-22:
Impact of the energy crisis
distorted by mild weather in Europe
for the past 2 winters
35.0
30.0
10%
25.0
increase in
global gas
demand from
2017-2021
Note: The Title Transfer Facility (TTF) is a virtual trading point
for natural gas in the Netherlands It is the most liquid pricing
location in Europe and serves as a pricing proxy for the overall
European LNG import market.
40.9
20.0
Despite step-up in LNG imports, security
of supply remains a key concern
Reliance on spot LNG cargoes creates
supply chain uncertainties and risk
of diversion to Asian countries
15.0
13.1
10.0
5.0
changes
9.8
8.0
11.5
10.3
by an additional 7% by 2026
0.0
2018-2021
2022
2023
Dutch TTF
2018-2024 average TTF >380% above
2024
LNG JKM (Platts)
2025
2026
U.S. natural gas
>30%
US natural gas prices
2023-2026 TTF prices
above 20182021 average tracking Asian LNG prices
European gas approx. 5x US gas price
Long term trend of increasing gas price
Investor Presentation – 15 April 2024
Domestic gas production is down
33% since 2010 and expected to drop
Further decline in Russian piped
gas supplies from 2025 (expiry of
Ukraine gas transit contract by end of
Oct-24)
Elevated gas prices in Europe
anticipated for the foreseeable future
with increased correlation to LNG prices
1 2024-2026 data based on CME Group forward curve for Dutch TTF, U.S. natural gas (Henry Hub) and LNG Japan/Korea Marker (Platts) as at 18.01.2024
7
Recent Highlights
01
Finance
▪ Share Capital
Consolidation
of 1 for 10
▪ Placement & SPP
A$ 6.4M funds from
European &
Australian Investors
▪ A$1.3 M options
02
04
Production
▪ Stable
production from
Vienna Basin
Fields
▪ Anshof-3 long
term test
outperformed
expectation
exercised
Appraisal &
Development
▪ Drilled Anshof-2
appraisal well
03
Transactions
▪ MND Anshof Investment
▪ Completed
installation of
permanent
production facility
at Anshof
05
Exploration
▪ Drilled Welchau
Gas Prospect
▪ Near Field Gas
prospects
matured to drill
▪ Oil and Gas
exploration
portfolio
expanded
- EUR 6.6M for a 30% interest
▪ MCF Welchau Investment
- EUR 2.9M for 25% interest
▪ MND Gas Exploration Investment
- EUR 4.95M for 50% interest
Investor Presentation – 15 April 2024
Vienna Basin Field Production
2024 Near term activities
Period of high activity focussed on Welchau resource definition, increasing cash flow and reserves growth
Welchau gas
Testing & Appraisal
Large resource
potential definition
▪ Ongoing well data
analysis and resource
potential update
▪ Q4 2024
Testing and well
potential deepening
▪ Technical and
commercial definition
▪ Permitting for follow
up appraisal well for
drilling in Q1 2025
Anshof oil field
Appraisal &
Development
Cash flow growth
▪ April 2024
Commission 3000
BOPD capacity
permanent oil facility
▪ Recommence oil
production at ANS-3
▪ Q3 2024
Drill ANS-2 ST1
Appraisal well
▪ Drill ANS-3 Appraisal
well
▪ Funding from MND
transaction
Investor Presentation – 15 April 2024
Upper Austria
Gas Exploration
Low risk, adjacent to
infrastructure
▪ Q4 2024
Drill Further Gas
Exploration Well
▪ Proximal to
infrastructure
▪ Funding from MND
transaction
▪ Further portfolio
development &
farmout
opportunities
Anshof field
Near field oil follow ups
Production tie-in
opportunities
▪ Multiple high value
oil targets
▪ Tie into Anshof
permanent facility
▪ High value reserves
and cash flow growth
▪ Held at 100% equity
9
Vienna Basin Production Assets
Stable, high value production with long term potential
A long-term future for Vienna Basin Fields
Vienna Basin Fields (100% interest)
✓ Low emission, low decline production delivering
long term cash flow (approx. 250 boepd)
✓ Ownership of 13.7 hectares of land suitable for
Solar Park - 65 Km from Vienna
▪ A unique position – own the land + storage reservoirs + green
power + connected to pipelines + availability of fresh water
▪ Addition of Solar Park, Hydrogen generation and Hydrogen
Storage for planned hydrogen back bone
✓ High value sweet crude oil, very favourable fiscal
terms (no royalties)
Wind park adjacent to ADX Vienna Basin Fields
Production operations at ADX Vienna Basin Fields
Multilayer field
suitable for H2
storage
Investor Presentation – 15 April 2024
1.64 mmbbl
2P developed
reserves Note 1
Pipeline to
Vienna refinery
& gas pipeline
Note 1: Reserves Reporting Date & Valuation (Independently Audited)
04.11.2021 less production to 31 December 2023
Anshof-3 production well and Early Production
Unit, Anshof-2 and 1 drilling locations
10
Anshof appraisal and development
Anshof-3 discovery well production
✓ Long term test production from Oct 2022 to Sep 2023 reaching regulatory
limit (36,000 barrels) using production constrained interim facility
✓ Stable water free production average 115 bopd and peaked at 140 bpd
with no pressure decline
✓ High quality crude oil (Brent equivalent) transported by truck to rail
head and by rail to the Vienna refinery
Anshof-3 drilling with the RED E-202 rig
in January 2022
Permanent facility Installation and recommencement of production
✓ 3000 bopd permanent production unit, storage and offloading tanks and
gas fired power generation has been installed and commissioned
✓ Production recommenced on 3rd of April at approx. 134 bopd
Anshof Permanent Production Facility at ADX’ Anshof-3 location
Investor Presentation – 15 April 2024
11
Anshof appraisal and development
Anshof-2 ST1 - next appraisal / development well
▪ Targeting thicker, better quality reservoir above the oil-water-contact
▪ Up-dip of Anshof-2 minimising well cost by using existing ANS-2 well
and side-tracking below existing 9 5/8” casing shoe
▪ Anshof-2 ST1 will be partly funded by MND in accordance with Energy
Investment Agreement
▪ Well slot likely to be available end Q3 to Q4 2024, well to be drilled in
conjunction with ADX-AT-I gas exploration well
ANS-3 oil
producer
ANS-2 ST 1
side-track location
ANS-2
Proven oil
intersection
Net thickness colours & structure depth contours
Investor Presentation – 15 April 2024
Predicted
InterpretedODT
ODT
“Stable, high value production with
ongoing reserves growth”
Improved Productivity expected
at Anshof-2 ST 1
Due to greater net vertical reservoir thickness (6 times
that at Anshof-3) and higher porosity
Near Term Exploration Focus
Welchau discovery evaluation and testing
Welchau deepening
Further core area gas exploration
Anshof near field oil potential
Welchau appraisal planning
▪
▪
▪
▪
▪
Giant Welchau 100km2
Jurassic anticline
155 Bscf
developed
gas field
IRR-1 gas
prospect
Refer to Cautionary Statement in relation to Prospective
Resources on Page 3 of this presentation
12
Investor Presentation – 15 April 2024
➢ 3D seismic response similar to adjacent 155bscf gas
field
➢ Expected Miocene deep water turbidite reservoirs
with flow of up to 45 mmscf/day
13
Exploration Activity in Upper Austria
High impact, drill ready portfolio in the heart of Europe
1
2
3
4
1020 km2
Welchau gas discovery to be
acreage
tested in Q4 2024. Large resource
potential to be appraised
High Impact Gas Prospects &
High Value Shallow gas play
identified with state of the art AI seismic
processing
20
3
2
3500 km2
4
3D Seismic
Infrastructure
Access
Anshof field appraisal & Near
field oil prospects low risk follow
ANSHOF
up provide rapid pathway to further cash
flow
1
18 MW Geothermal low risk, long
term potential with shallow oil and gas
targets provides new opportunity
191 mmboe 1
Refer to Cautionary Statement in relation to Prospective Resources on Page 3 of this presentation.
Investor Presentation – 15 April 2024
Prospects
¹ Best Technical Prospective Resources Prospective resources reporting date update 22.06.2023
14
Welchau Gas Liquids Discovery
Overview of potential
“A potentially transformational resource in the heart of Europe. Our
confidence in Welchau’s potential remains undiminished. The evaluation
and testing of Welchau is a core focus and value driver for ADX”
Welchau-1
Molln-1
ADX predrill estimate best technical Prospective Resources of 807 BCFE
(134 MMBOE)1. Welchau targeted the same reservoirs (Steinalm
Formation) as the nearby Molln-1 well which tested condensate rich,
pipeline quality gas at rate of 4.0 MMSCFPD in 1989
Refer to Cautionary Statement in relation to Prospective Resources on Page 3 of this presentation
Investor Presentation – 15 April 2024 1 Best Technical Prospective Resources Prospective Resources reporting date 22.06.2023
15
Welchau Gas Liquids Discovery
Results to date and next steps
Key findings from drilling phase
▪ 450m of hydrocarbons shows in a giant 100
km2 structure (refer Well Data Review)
▪ Structural interpretation on prognosis
▪ Confirmed good trap seal quality which
was a major predrill risk
▪ Confirmed hydrocarbon column of
condensate rich gas and potential liquids
▪ Produceable hydrocarbons indicated from
down hole sampling and well inflow
▪ Recovered core, drilling results and
preliminary log evaluation indicates
storage and flow potential
▪ Well drilled successfully approx. 30%
below budget
▪ Still over 1000m of exploration potential
below current well TD
Ticked all the boxes of a technical
discovery - P(success) from 20% to 100%
Investor Presentation – 15 April 2024
“Next Steps”
1
2
3
▪ Data QC
▪ Data Analysis
▪ Resource review
▪ Resource update
▪ Well testing design
▪ Well testing
Define Commercial Potential
and the likely appraisal program
16
Welchau Gas Liquids Discovery
Indicative economics and profitability benchmarking
(EUR mil.) at EUR 30/MWh gas price
515
821
EUR 309 mil.
net NPV10
428
15
125
235
Royalties
OPEX
Corporate Tax
CAPEX
ABEX
Frer cash flow
Economics derived from Gaffney Cline &
Associates’ 1U case (332 Bcf gross gas
resources) excludes any contribution
from high value liquids (45° API) generate
a NPV10 (ADX’ share) representing 10(x)
ADX’ market capitalisation1
Compelling potential
▪ Large gas and liquid resource
potential at an onshore location in
premium energy market
▪ Excellent availability of
infrastructure for gas (18 kms)
and liquids (40 Kms)
▪ Shallow and relatively cheap
drilling costs
▪ Relatively short development time
frames especially in the case of
liquids
▪ Excellent demand and pricing for
gas (Dutch TTF) & liquids (Brent)
▪ Deeper exploration potential in
Welchau well
▪ Play opening discovery with
multiple follow up targets
Welchau Profitability Index Ratio2 vs
other gas projects in Europe
4.00
Profitability Index Ratio based on NPV10
Indicative Economic Potential
3.50
Welchau generates
superior economics to
other gas projects in
Europe
3.00
2.50
2.00
3.92
1.50
5.5 times higher PIR3
1.00
0.50
0.79
Welchau (Austria)
Pensacola (U.K. North
Sea)
Colle Santo (Italy)
Welchau
Pensacola4
Colle Santo5
Location
Austria (onshore)
U.K. (offshore)
Italy (onshore)
Gross resources
55 mmboe (1U)
51 mmboe (2C)
11 mmboe (2P)
Gross CAPEX
USD 177 mil.
US$ 884 mil.
US$ 95 mil.
Gross NPV10
USD 694 mil.
US$ 663 mil.
US$ 62 mil.
Refer to Cautionary Statement in relation to Prospective Resources on Page 3 of this presentation
Investor Presentation – 15 April 2024
1 As at 12 April 2024. 2 Profitability Index (or PIR) calculated as project NPV10 divided by project CAPEX. 3 PIR based on NPV10 at EUR 40 per MWh or
equivalent. 4 Source: Deltic Energy Plc. 5 Source: Reabold Resources Plc
0.65
0.00
Welchau’s potential is of national significance
Austria’s gas supplies remain highly vulnerable & Russia dependent
"Our dependence on Russian natural gas threatens the
prosperity, security and future of our country. Our goal is to get
out of Russian natural gas. As a sovereign country, we cannot
simply accept that the share of Russian gas increases instead of
decreases. That is why we will now present the next measures,"
says Climate Protection and Energy Minister Leonore
Gewessler.
Supply and Demand Summary
▪ Austria imports 87% of its gas requirements
▪ There is a high dependence on Russian gas
65% of imported gas during 2023
Other sources mostly LNG and Norwegian gas
In December 2023 98% of imported gas came from
Russia
▪ Insufficient alternative sources of gas imports
▪ The majority of gas imports coming though Ukraine
making Austria highly vulnerable – gas transfer contract
expires in October 2024
▪ Desperate need for alternatives to meet energy demand
and meet EU obligations to diversify
o
o
o
Investor Presentation – 15 April 2024
Russian Imports as a Percentage of Total
Russian imports as a percentage of total
Other imports as a percentage of total
17
Welchau Gas Liquids Discovery
Challenges and Opportunities
18
“Welchau is a resource of potential national significance ◊ With additional evaluation can come
increasing value and reduced risk ◊ We are starting from a very encouraging place”
Challenges
✓ Overcome the language problem in relation to carbonate reservoirs
which are not well understood in Australia
✓ Timely communication of ongoing data analysis and resource estimates
✓ Efficiently progress ongoing evaluation, testing and appraisal objectives
of project while meeting environmental and social obligations
✓ Bring key stakeholders with ADX on the journey
✓ Increase organisational capability in line with project development
Opportunities
✓ Commercialisation of a large, strategic, high value resource base at a
high equity level
✓ Deepen Welchau-1 well to assess exploration potential which can be
accessed at low relative cost
✓ Potential for early commercialisation of liquids
✓ Engagement with market to provide development finance
✓ Mature large play potential to drillable stage
Investor Presentation – 15 April 2024
The RED E200 drill rig prior to well spud at the Welchau-1
location
19
Complementary renewable energy projects
Complementary projects with in ADX acreage
Green H2 project
pilot phase
(Vienna Basin)
Green H2 project
scaleup phase
(Vienna Basin)
Solar power
project
(Vienna Basin)
Gmunden
geothermal project
(Upper Austria)
Production & storage of green
H2 at the Zistersdorf field
Production & storage of green H2
at the Zistersdorf field
Generation of renewable
electricity with PV plants
Geothermal as well as
oil & gas targets
2.5 MW electrolyser
30 MW electrolyser
1 or 2 PV plants considered
15 MW plant capacity potential
370 MT p.a. (green H2)
5,200 MT p.a. (green H2)
1.5 MWp initial capacity with
90% success rate for
possibility to ramp-up
geothermal wells in the area
Grid feed-in (additional
revenues) & self-consumption
Strong interest by local offtakers
75 GWh of storage capacity
100+ GWh of storage capacity
already identified
already identified
“Value add to Vienna Basin Fields using depleted reservoirs to store hydrogen,
facilities for production and land to install PV plants”
Investor Presentation – 15 April 2024
“Drill wells with multi
target potential”
20
ADX role in European energy transition
Ideally positioned in the near term and the longer term
➢ Oil & gas demand continues to increase
The transition to renewables is taking longer than expected
➢ Gas is a transition fuel in the EU
Growth in Global Energy Demand
Pace of Transition to Date
Financial and greenhouse reduction benefits but gas supply is
tight for foreseeable future
➢ Oil and gas industry can make a significant transition
contribution
Geothermal, hydrogen & CO2 storage are all needed to achieve
net zero goals >> ADX well placed for all
“Oil and gas reservoirs have a big role to play in energy
transition if coincident with infrastructure”
84% of global energy supplied by coal, oil and gas
“ADX Vienna Basin oil and gas fields are the potential
Investor Presentation – 15 April 2024
site for a Green Hydrogen Production and Storage
Project and a Solar Park for self consumption and sales
into power the grid”
12
Appendix 1:
Welchau-1 Gas Liquids Discovery
Well Data Review
21
Welchau-1 data review
Overview of the Discovery Well
Welchau Status Summary
» Welchau-1 well is a fractured carbonate hydrocarbon discovery with
significant potential, meeting key measures proving:
o
hydrocarbon charge, a trapping mechanism, a reservoir for storage
and a sealing mechanism, with
o
a recovered downhole hydrocarbon sample to surface
» Substantial data set (static and dynamic) to be calibrated and evaluated.
» Welchau-1 is suspended with 7” casing
» Production test planned for Q4 2024
Welchau Overview
» Prediction vs Actual (Trap/Seal/Reservoir)
» Evaluation Process to Resource Estimate
» Hydrocarbon System (Preliminary)
Investor Presentation – 15 April 2024 : Appendix 1 Welchau-1 Data Review
22
23
Welchau-1 data review: Trap prediction
Pre-drill Structure Prediction
» Trap ✓
o
Located in the foothills of the
Austrian Alps
o
Pre-drill the trap was mapped as a
thrust anticline (outcrop mapping,
balanced cross section, 2D seismic
along dip and down dip well Molln1 well) with an estimated area
closure of 100 km² and a maximum
relief of 2140 m.
o
The structural model will be
updated on completion of the
ongoing borehole image bed dip
analysis.
Investor Presentation – 15 April 2024 : Appendix 1 Welchau-1 Data Review
24
Welchau-1 data review: Presence of seal
» Seal
✓
o
Seal was the single biggest risk in Welchau-1’s 20% probability of technical success (i.e. geological
discovery)
o
Seal is composed of the thick Lunz formation (350m MD) with the Partnach formation (43m MD)
immediately above top reservoir
o
The Partnach was predicted to be overlain by thick carbonate units. The sediment of the excellent
sealing Lunz formation, seen in Molln-1, was found to be basin filled across to Welchau-1.
Post-drill Seal (Preliminary)
Welchau-1
Seal
Lunz
Formation
(same as Molln-1)
Investor Presentation – 15 April 2024 : Appendix 1 Welchau-1 Data Review
Post-drill Seal (Preliminary)
25
Welchau-1 data review:
Carbonate vs Sandstone Reservoirs
» Carbonate reservoir characteristics
o
Reservoir characterisation is more complicated in
carbonates than sandstones
o
In sandstone reservoirs, depositional stratigraphy is
the dominant control on reservoir petrophysics and
geobody geometry
o
In carbonates, there are other additional complexities
of diagenetic history and structuration (especially
fracturing)
o
A detailed understanding of all aspects of a
carbonate reservoir is required for a subsurface
model to approximate subsurface reality
Investor Presentation – 15 April 2024 : Appendix 1 Welchau-1 Data Review
Carbonate Porosity Types
26
Welchau-1 data review : Reservoir quality
» Reservoir
✓
Presence of reservoir was not seen as a significant risk to Welchau-1 success. The uncertainty is in
relation to the storage volume (Stor in table below) and recoverable volume or permeability (Perm in
table below). The table below is qualitative comparison of the potential reservoirs intersected.
o
Welchau-1
(450m MD)
Partnach
Reifling
Steinalm
Gutenstein
Reichenhall
43m
128m
118m
111m
50m
Stor
Perm
Stor
Perm
Share your feedback
Discover