Anshof-2 Appraisal Well Update - Report No 4
Released
Released
Announcement PDF
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
5 December 2023
Anshof-2 Appraisal Well Update
Drilling Operations Report No 4
Key points:
The Anshof-2 well has intersected the predicted Eocene oil reservoir section at a depth of approximately
2160 meters measured depth (MD), around 40 to 50 meters high to prognosis in terms of vertical depth
(VD). The Eocene reservoir section has a vertical gross thickness of at least 22 meters which compares
very favourably with the 6-meter gross Eocene sandstone reservoir section in the Anshof-3 discovery well
that was completed as producer.
The Anshof-2 appraisal well is located in the ADX-AT-II licence in Upper Austria (refer to figure 1). The well
was spudded at 10:00 am Central European Time (CET) on the 13th of November 2023. ADX is the operator
and has a 60% economic interest in the well.
The RED Drilling & Services GmbH (RED) E-202 rig is being used to drill the Anshof-2 well, the same rig
used to drill Anhof-3 discovery well.
At 12:00 pm CET on the 4th of December 2023 the status of well operations was drilling ahead at a depth
of 2235 meters MD in 8 ½ inch hole at an inclination of approximately 70o relative to vertical.
Previous operations since last report include the drilling of the 8 ½ inch hole to 1950 meters MD and pull
out of hole to check and renew the Bottom Hole Assembly (BHA) and run back to bottom to continue drilling
with a new BHA to the current well depth.
Planned future operations include the drilling of the 8 ½ inch hole to a total depth of 2320 meters MD with
a directional drill string configuration. This is the planned final total depth (TD) of the Anshof-2 well. The well
will then be extensively evaluated with electric line logging tools (Logs) to precisely determine the net
reservoir section within the vertical 22 meters of gross reservoir section which has been interpreted mainly
from wellsite cuttings and a gamma ray measurement while drilling tool which is located behind the drilling
bit. Logs will also be used to determine hydrocarbon saturation values and other reservoir parameters such
as porosity. Logging services will be provided by Weatherford.
The next routine Drilling Operations Report is expected on the 12th of December 2023. It is expected that
by then the logging results and a first preliminary interpretation of reservoir parameters will be available.
An overview of the Anshof -2 Well Objectives is available in Appendix 1 at the end of this release.
ADX Energy Ltd | ABN 50 009 058 646 -Registered and Principal Office Australia
29 Bay Road, Claremont WA 6010, Australia
Telephone: +61 8 9381 4266 | admin@adxenergy.com.au | adxenergy.com.au
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Drilling operations at Anshof-2 with the RED E-202 drilling rig. The pump jack in the back ground is at the
Anshof-3 production well.
ADX Energy Ltd (ASX Code: ADX) is pleased to advise that at At 12:00 pm CET on the 4th of December 2023
the status of well operations was drilling ahead at a depth of 2235 meters MD in 8 ½ inch hole at a near horizontal
angle of ca. 70 degrees. The well was spudded at 10:00 am Central European Time on the 13th of November
2023. The Anshof-2 well is located in the ADX-AT-II license in Upper Austria. RED Drilling & Services GmbH
(RED) E-202 rig is being used to drill the Anshof-2 well. The RED E-202 rig is the same drilling rig that was used
to drill the Anshof-3 discovery well.
Planned future operations include the drilling of the 8 ½ inch hole to a total depth of 2320 m MD with a directional
drill string configuration. This will be the planned final total depth (TD) of the Anshof-2 well. The well will then be
extensively evaluated with electric line logging tools (Logs) to precisely determine the net reservoir section
within the vertical 22 meters of gross reservoir section which has been interpreted mainly from wellsite cuttings
and a gamma ray measurement while drilling tool which is located behind the drilling bit. Logs will also be used
to determine hydrocarbon saturation values and other reservoir parameters such as porosity.
Previous operations since last report include the drilling of the 8 ½ inch hole to 1950 meters MD and pull out of
hole to check and renew the Bottom Hole Assembly (BHA) and run back to bottom to continue drilling with a
new BHA to the current well depth.
2|Page
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Figure 1: Location map for the Anshof-2 well (ANS-2) within the ADX-AT-II licence. The low-risk appraisal follow
up satellite prospects (ADX 100% economic interest) including SGB, LIND and GRB North and South of the
Anshof field are also shown.
Preliminary Drilling Results
The results described below are preliminary until the well has been extensively evaluated with electric line
logging tools (Logs) . It is expected that logging will commence within two days . Due to the high angle of the
well, logging will be undertaken through drill pipe to avoid tools being held up in horizontal section. This takes
longer than normal logging operations.
The Anshof-2 well has intersected the predicted Eocene oil reservoir section at a depth of approximately 2160
meters MD around 40 to 50 meters high to prognosis in terms of vertical depth (VD). This is within the range of
pre-well depth conversion uncertainties and is a favourable outcome (optimistic case) since it allows for a larger
interpreted hydrocarbon column above the hypothetical yet to be determined oil water contact or oil down to
depth.
3|Page
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
The Eocene reservoir section intersected in the well has a vertical gross thickness of at least 22 meters which
compares very favourably with the 6-meter gross Eocene sandstone reservoir section in the Anshof-3 discovery
well which was completed as a producer and commenced production in October 2022. The yet to be run Logs
will further determine the exact gross and even more important net reservoir thickness. Logs will also be used
to determine hydrocarbon saturation values and other reservoir parameters such as porosity. Logging services
will be provided by Weatherford.
Gas shows observed in the well from mudlogs are comparable with those encountered in the Anshof-3 discovery
well. The well is currently drilling within the deeper Cretaceous section below the target reservoir which has
significantly higher than usual gas shows, i.e. compared to the Anshof-3 well, but there are no indications of
reservoir section based on cuttings alone. Wireline logging data and the subsequent petrophysical analysis will
provide a better defined and quantified description of well results in this section of the well together with the
Eocene reservoirs.
Permit:
ADX AT-II
Well scheme
Success case
Well name: ANSHOF 2
UWI: ANS-002
Directional waypoints:
Spud-in point :
E 67587.81
N E; N; TVDSS [m]
5319705.08
Elevation
Target 1: 68351.7; 5319577.8; -1661.8
(MSL): 406.6 m
Target 2: 68600; 5319515; -1711.2
RT above GL: 6,23 m
Target shape:
Polygon
Wellpath: high angle slanted
Scheme not scaled. All depth on this page count from Ground Level.
Depth MD
[m]
Stratigraphy and Mud system
[mMD]
0
20
100
Quarternery
Flysch
200
300
400
500
Imbricated
Puchkirchen Fm.
400
600
Wellscheme
Casing and Cementation
Directional
Mud and drilling problems
20" Conductor 4 m
13 3/8" 54.5# K55 BTC
130 m
Gel 1.20
K2CO3 Polymer mud
1.25 kg/l
Top depth
Formation
0
Shallow
gas 150200 m
Fault
zone
350..390
m
12 1/4" Hole
Class G 1.9 kg/l
KOP @ 450 m
Az. 97.29°
DLS 3°/30 m
EOB @ 650 m
9 5/8" 40# L80-1 BTC
730 m
700
Incl. 20.02°
800
900
IMB PK Gas Sands
874
Class G 1.7 kg/l Lead
1000
1100
1200
K2CO3 Polymer mud 1.30 kg/l
1300
1400
1500
1600
1700
1800
1900
2000
2100 Zupfing Fm.
2073
2200 Eggerding Fm.
2153
2246
2278
2318
Dynow marl
2300 Schoeneck Fm.
Upper Eocene
8 1/2" Hole
KOP 2 @ 1871 m
Az. 104.2°
DLS max. 4°/30m
Class G 1.9 kg/l Tail
EOB 2 @ 2315 m
2400
Incl. 79.10°
2500
2600
Upper Cretaceous
2700 TD (TVD 2132 m)
2598
2650
7", 26 lbs/ft, L80, BTC-TXP
TD 2650 m
EOT @ 2650 m
TVD 2132 m
2800
Figure 2: Anshof-2 pre-drill well (ANS-2) well plan.
4|Page
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Further Operational Updates
ADX will provide Anshof-2 well operations updates to shareholders and drilling results as they become available.
It is expected that the more definitive wireline logging results and the respective first quick look petrophysical
interpretation will become available during the next week.
Well Participation and Operatorship
In accordance with Anshof Discovery Area Partnership agreements the economic interests in the Anshof-2 well
will be 60% ADX and 40% MND. ADX is the Operator of the Anshof Discovery Area Partnership and the ADXAT-II licence.
XST has elected not to participate in the Anshof-2 well. ADX and MND will fund XST’s share of well costs on
50:50 basis and will in turn obtain the right to 60% and 40% respectively of production from the well unless XST
opts to buy back into the well at a premium of 500% to well costs. XST retains its 20% economic interest in the
remainder of the Anshof Discovery Area Partnership (i.e. Anshof Discovery Area less the Anshof-2 well) with
both ADX and MND’s economic interests remaining at 50% and 30% respectively.
For further details please contact:
Paul Fink
Ian Tchacos
Chief Executive Officer
Executive Chairman
+61 (08) 9381 4266
+61 (08) 9381 4266
paul.fink@adx-energy.com
ian.tchacos@adxenergy.com.au
Authorised for lodgement by Ian Tchacos, Executive Chairman
Persons compiling information about Hydrocarbons:
Pursuant to the requirements of the ASX Listing Rule 5.31, 5.41 and 5.42 the technical and reserves information
relating to Austria contained in this release has been reviewed by Paul Fink as part of the due diligence process
on behalf of ADX. Mr. Fink is Technical Director of ADX Energy Ltd is a qualified geophysicist with 30 years of
technical, commercial and management experience in exploration for, appraisal and development of oil and gas
resources. Mr. Fink has reviewed the results, procedures and data contained in this release and considers the
resource estimates to be fairly represented. Mr. Fink has consented to the inclusion of this information in the
form and context in which it appears. Mr. Fink is a member of the EAGE (European Association of Geoscientists
& Engineers) and FIDIC (Federation of Consulting Engineers).
Previous Estimates of Reserves and Resources:
ADX confirms that it is not aware of any new information or data that may materially affect the information
included in the relevant market announcements for reserves or resources and that all material assumptions and
technical parameters underpinning the estimates in the relevant market announcements continue to apply and
have not materially changed.
5|Page
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Appendix 1: Anshof-2 Appraisal Well Overview
The Anshof oil field was discovered with the exploration well Anshof-3 in January 2022. Anshof-3 was completed
as an oil producer in October 2022 with its production performance during eleven months of long term testing
exceeding expectations. Anshof-2 will be the second well in the Anshof field. The well will be drilled as an
appraisal well 80m downdip of the oil-down-to seen in the Anshof-3 well to appraise the depth of the postulated
2P oil-water contact and the expected reserves in the Anshof oil field. The well is planned to intersect the
targeted Eocene sandstone reservoir some 1.8 km East of the Eocene intersection in Anshof-3. The location,
based on AI geological modelling, is expected to have both higher gross and net reservoir Eocene sandstone
thickness relative to that in the crestal Anhsof-3 well. Anshof-2 will be a high angle well (790) penetrating both
the top and base of the Eocene reservoir to maximise net reservoir intersection. The well has dual objectives of
appraising the Anshof field structural and depositional model as well as being completed as a producer.
Figure A1: Anshof Eocene depth map, seismic Cross section and schematic interpretation (clockwise). The map:
surface locations are shown as white circles, the subsurface penetration points of the Eocene oil reservoir as black circles.
The white diamond symbols show the expected subsurface penetrations of Anshof-2 and future planned Anshof-1 well
6|Page
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Figure A2: Anshof Eocene cross section showing Anshof-2 appraisal well downdip relative to the Anshof-3
discovery well
The Anshof-2 well is also expected to deliver additional production and cash flow from an approx. 280 metre long
planned completion within the Eocene oil reservoir. Anshof-2 is expected to contribute approx. 300 barrels of oil
per day with an ultimate recovery of 0.8 million barrels from the well.
Success at Anshof-2 has the potential to increase the independently certified 2P reserves of 5.2 MMBOE to up
to 26 MMBOE 1, which is the certified 3P + 3C reserves / contingent resources estimate. In addition, the
validation of ADX’s structural and depositional model will de-risk multiple follow up prospects such as GRB in
the adjacent structural block to the south.
1 The Original Reserves Reporting Date of Anshof was on 30/10/2022.
Access to Production Infrastructure
As was the case with Anshof-3, a successful Anshof-2 oil well will be produced using a leased production facility
with a purchase option. A new higher production capacity production facility capable of up to 3000 barrels of oil
per day will be mobilised to the Anshof location following drilling of the Anshof-2 well. The oil will be trucked to
a nearby RAG Exploration & Production GmbH (RAG E&P) hydrocarbon gathering facility from which oil is
delivered by train to the OMV refinery in Vienna.
Figure A3: Image of the leased production unit which will be used at the Anshof field and drilling location.
7|Page
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
ADX benefits from an existing agreement with RAG E&P that provides access to infrastructure operated by
RAG E&P. The agreement reduces ADX capital expenditures and minimises the time taken from drilling to
commercial production due to the ability to tie into RAG E&P’s existing hydrocarbon gathering, processing and
storage facilities which are connected to Austria’s oil and gas infrastructure network.
Reporting Standards
Reserves and resources are reported in accordance with the definitions of reserves, contingent resources and
prospective resources and guidelines set out in the Petroleum Resources Management System (PRMS) prepared
by the Oil and Gas Reserves Committee of the Society of Petroleum Engineers (SPE) and reviewed and jointly
sponsored by the American Association of Petroleum Geologists (AAPG), World Petroleum Council (WPC),
Society of Petroleum Evaluation Engineers (SPEE), Society of Exploration Geophysicists (SEG), Society of
Petrophysicists and Well Log Analysts (SPWLA) and European Association of Geoscientists and Engineers
(EAGE), revised June 2018.
PRMS 2018 Reserves Classifications
1P Denotes low estimate of Reserves (i.e., Proved Reserves). Equal to P1.
2P Denotes the best estimate of Reserves. The sum of Proved plus Probable Reserves.
3P Denotes high estimate of Reserves. The sum of Proved plus Probable plus Possible Reserves.
1. Developed Reserves are quantities expected to be recovered from existing wells and facilities.
a. Developed Producing Reserves are expected to be recovered from completion intervals that are
open and producing at the time of the estimate.
b. Developed Non-Producing Reserves include shut-in and behind-pipe reserves with minor costs to
access.
2. Undeveloped Reserves are quantities expected to be recovered through significant future investments.
A. Proved Reserves are those quantities of Petroleum that, by analysis of geoscience and engineering data,
can be estimated with reasonable certainty to be commercially recoverable from known reservoirs and under
defined technical and commercial conditions. If deterministic methods are used, the term “reasonable certainty”
is intended to express a high degree of confidence that the quantities will be recovered. If probabilistic methods
are used, there should be at least a 90% probability that the quantities actually recovered will equal or exceed
the estimate.
B. Probable Reserves are those additional Reserves which analysis of geoscience and engineering data
indicate are less likely to be recovered than Proved Reserves but more certain to be recovered than Possible
Reserves. It is equally likely that actual remaining quantities recovered will be greater than or less than the sum
of the estimated Proved plus Probable Reserves (2P). In this context, when probabilistic methods are used,
there should be at least a 50% probability that the actual quantities recovered will equal or exceed the 2P
estimate.
C. Possible Reserves are those additional Reserves that analysis of geoscience and engineering data suggest
are less likely to be recoverable than Probable Reserves. The total quantities ultimately recovered from the
project have a low probability to exceed the sum of Proved plus Probable plus Possible (3P) Reserves, which
is equivalent to the high-estimate scenario. When probabilistic methods are used, there should be at least a
10% probability that the actual quantities recovered will equal or exceed the 3P estimate. Possible Reserves
that are located outside of the 2P area (not upside quantities to the 2P scenario) may exist only when the
commercial and technical maturity criteria have been met (that incorporate the possible development scope).
Standalone Possible Reserves must reference a commercial 2P project.
End of this Release
8|Page
Share your feedback