Quarterly Activities Report - June 2023
Released
Released
Announcement PDF
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
31 July 2023
Activities Report
For the Quarter Ended 30 June 2023
ADX Energy Ltd (ASX: ADX, “ADX” or “the Company”) is pleased to provide an update on its
activities for the quarter ended 30 June 2023.
HIGHLIGHTS
Overview
Austrian production increased by 8%
Ongoing, uninterrupted test production at the Anshof-3 oil well exceeding expectation
Procurement, planning and permitting for Anshof-2 appraisal well and Welchau-1
exploration well drilling operations
Austrian exploration prospect inventory upgraded
Workover Program reinstating oil production from Vienna basin fields shut in wells
Production
Vienna Basin Fields and Anshof- 3 Production
Sales and Hedging Revenues increased by 1% (A$ 3,233,016 for the quarter)
Oil Equivalent Production Rates increased by 8% (averaging net 317 BOEPD)
Brent Oil Price decreased by 4% (averaging USD 78.39 per barrel)
Gas Price decreased by 48% (averaging EUR 37.90 per MWh)
Appraisal and Development
Anshof Field - Upper Austria
Anshof-3 Test Production ongoing at a stable rate exceeding reservoir performance
assumed in recent reserves audit
Anshof Development Drilling ongoing planning and procurement for Anshof-2 and
Anshof-1 appraisal and development wells
Anshof Field Production facility engineering and procurement for early production
facility replacement
__________________________________________________________________________________________________________
ADX Energy Ltd | ABN 50 009 058 646 -Registered and Principal Office Australia
29 Bay Road, Claremont WA 6010, Australia
Telephone: +61 8 9381 4266 | admin@adxenergy.com.au | www.adxenergy.com.au
Page | 1
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Exploration
Upper Austria - Exploration Licenses
ADX-AT-I shallow, low risk gas prospects generated with AI (Artificial Intelligence) based
3D seismic work
Anshof Satellite Prospect at GRB de-risked to appraisal status and matured for drilling
Welchau 807 BCFE gas prospect 1 geotechnical studies support previous work and
identify follow up prospects
Welchau-1 Well permitting progressing towards operations commencement in Q4 2023,
with drilling materials and rig secured
Exploration prospect inventory upgraded with a 340% increase in best technical
prospective resources for the category of appraisal and low risk prospects including GRB
and shallow, low risk gas prospects
Romania - Iecea Mare Production License and Parta Exploration License
Parta Exploration License Nothing to report this quarter
Italy - Sicily Chanel Exploration
New License Award Process for Gas Exploration Ministry advised in June that
supplemental material submitted by ADX in relation to technical and financial capability
will now be examined by an independent reviewer for a final decision
Renewable Energy Projects – Austria
Vienna Basin Green H2 Project ongoing evaluation of synergies with the Vienna Basin
Solar Project regarding the direct supply of renewable electricity to produce green
hydrogen
Vienna Basin Solar Project finalisation of design parameters for project has been
postponed with a view to H2 Project integration
Geothermal, oil and gas stacked pay potential with multiple customer opportunities
evaluated to determine feasibility and secure investor interest
Finance and Corporate
Cash Balance A$ 2.055 million million at end of quarter
The estimated quantities of petroleum that may potentially be recovered by the application of a future
development project(s) relate to undiscovered accumulations. These estimates have both a risk of discovery and
a risk of development. Further exploration appraisal and evaluation is required to determine the existence of a
significant quantity of potentially recoverable hydrocarbons.
1
Page | 2
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Loan Note Financing of A$1.5 million subsequent to quarter end for high impact drilling
procurement
PLANNED ACTIVITIES FOR QUARTER 3, 2023
Vienna Basin Production – Austria
Zistersdorf and Gaiselberg Fields. Work over program in mid August to reinstate further
oil production
Anshof Field Development – Upper Austria
Anshof-3 Long Term Testing. Commissioning of additional oil tank site storage and
increase production rate
Anshof Development Drilling. Preparation for the Anshof-2 well drilling operations
Development planning. On-going engineering and procurement for installation of
permanent production facility at the Anshof-3 location
Exploration
Upper Austria AGS Licences
• Farmout program. On-going engagement with multiple parties on several
prospects including Welchau, the Anshof GRB satellite prospect and ADX AT-I gas
prospects
• Welchau 807 BCFE gas prospect. Secure drilling permits and environmental
permit required for the commencement of drilling operations
• Gas Prospect Generation. Further expand the low-risk, shallow gas prospect
portfolio and mature the large high impact ZAM prospect in the ADX AT-I licence
Italy - Sicily Channel
• d363C.R-.AX license (gas). Awaiting ministerial response
Romania - Parta Exploration Licence. Engagement with the Authorities for preparation
of government decision on license extension
Romania – New Ventures. Review of a combined Production, Appraisal and Exploration
opportunity
Renewable Energy Projects – Austria
Vienna Basin Green H2 Project. Ongoing evaluation synergies with Vienna Basin Solar
Project for pilot phase hydrogen generation and oil field power usage
Oil, Gas and Geothermal Multi Energy Project. Continue seeking co-investment
partnership opportunities to progress project.
Page | 3
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
OPERATIONS REPORT
Production Activities
ZISTERSDORF AND GAISELBERG PRODUCTION ASSETS – Vienna Basin, Austria
ADX is operator and holds a 100% interest in the production
ANSHOF OIL DISCOVERY (Long Term Well Testing) – Upper Austria
ADX is operator and holds an 80% interest in the production
Production Operations
Oil sales continued during the quarter with stable, uninterrupted production from the Anshof -3 longterm well test in Upper Austria while oil and gas sales increased at the Vienna Basin fields with the
reinstatement of production following a successful workover program.
Combined oil and gas production rate averaged 317 BOEPD during June 2023 quarter (compared to
299 BOEPD in the previous quarter), an 8% increase compared to the previous quarter.
ADX Energy Production
(ADX share)
400
9,000
300
6,000
200
3,000
100
Jan-23
Feb-23
Crude oil (Z&G)
Mar-23
Natural gas (Z&G)
Apr-23
May-23
Jun-23
Crude oil (ANS) ADX
boepd
boepd
Production (boe)
12,000
Production histogram showing the recovery of production down time at the Vienna Basin fields
and ongoing contribution to production from the Anshof-3 long term test
Field Revenues and Product Pricing
Average Brent reference oil pricing weakened during the quarter averaging USD 78.39 per barrel, a
decrease of 4% compared to the previous quarter. Gas prices during the June quarter averaged EUR
37.90 per MWh a decrease of 48% compared to the previous quarter.
Page | 4
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Oil and Gas Sales Revenue
(ADX Share)
AUD ($'million)
2.0
1.0
Jan-23
Feb-23
Mar-23
Crude oil (Z&G)
Apr-23
Natural gas (Z&G)
May-23
Jun-23
Crude oil (ANS)
Oil and gas revenue histogram showing impact of oil and gas price on production from the Vienna
basin fields and the Anshof-3 oil well
Australian dollar Sales revenues were higher due to an increase in oil production and the weakening of
the A$ against the EUR despite a small decrease in oil price and a large decrease in gas price (see tables
below).
Table 1 - Quarterly Production Summary
Crude Oil Sold (Barrels)
Crude Oil Sold (Barrels) - ANS (ADX Share)
Gas Delivered (M3)
Total Oil Equivalent (BOE)
Avg Production Rate (BOEPD)
Current Qtr
Total
Past Qtr Total %age Change
April
May
June
5,601
2,785
5,030
2,655
7,355
2,912
17,987
8,352
17,175
7,952
5%
5%
178,508
116,568
117,590
412,667
290,344
42%
9,474
316
8,395
271
10,984
366
28,853
317
26,896
292
7%
8%
Table 3 below shows sales revenues of EUR 1,938,451 for the June 2023 quarter compared to EUR
1,964,743 in the March 2023 quarter. Net hedging gains amounted to EUR 46,133 for the June quarter.
Page | 5
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Table 2 - Quarterly Sales Price Summary
April
May
June
Current Qtr
Total
Past Qtr Total
%age Change
Avg Oil Pricing (US$ / BBL)
$
84.94 $
75.55 $
74.70 $
78.39 $
81.27
-4%
Avg Gas Price (Euro / MWh)
€
42.15 €
41.12 €
30.44 €
37.90 €
73.47
-48%
Table 3 - Quarterly Sales & Hedging Revenue Summary
April
May
June
Current Qtr
Total
Past Qtr Total
%age Change
Oil Revenue (Euro)
Oil Revenue (Euro) - ANS (ADX Share)
Gas Revenue (Euro)
€
€
€
398,000 €
204,885 €
92,975 €
320,706 €
175,307 €
47,976 €
464,803 €
190,652 €
43,148 €
1,183,509 € 1,191,174
570,844 €
571,286
184,099 €
202,284
-1%
0%
-9%
Total Sales Revenue (Euro)
€
695,860 €
543,989 €
698,602 €
1,938,451 € 1,964,743
-1%
€ 25,292
€ 27,389
Hedging Revenue (Euro)
"Swap Contracts"
Total Revenue (Euro)
Total Revenue (A$)
-€ 6,547
€
689,312 €
$ 1,122,934 $
569,281 €
725,991 €
927,396 $ 1,182,686 $
€ 46,133 €
-
1,984,584 € 1,964,743
3,233,016 A$/ Euro =
1%
0.6138
Hedging
Due to volatile market conditions and in line with its rolling hedging strategy seeking to provide
visibility on near revenue generation, ADX hedged on 5 April 2023 a total of 16,440 barrels for the
period between 1 April 2023 to 30 September 2023 under a swap contract at a fixed price of USD 82.94
per barrel (Dated Brent price). The hedging counterparty for this transaction is BP.
The quantities hedged are equivalent to 120 barrels per day of the production from the Vienna basin
fields for the period from 1 April 2023 to 30 June 2023 and 60 barrels per day for the period from 1
July 2023 to 30 September 2023.
The balance of the crude oil production from the Vienna basin fields and all of ADX’ share of the crude
oil production from the Anshof field remain unhedged allowing ADX to maintain exposure to upside in
Brent crude oil pricing. Gas production from the Vienna basin fields is also not hedged.
Appraisal & Development Activities
ANSHOF EOCENE OIL PROJECT – ADX-AT-II LICENCE, Upper Austria
ADX is operator and holds an 80% economic interest in the Anshof Discovery Area. Refer to ASX
release dated 22 November 2021 regarding the farmout of a 20% economic interest in Anshof to Xstate
Resources Limited.
Anshof-3 Extended Production Testing
Anshof-3 production continued through the quarter at a stable rate of 115 barrels per day over 86
production days. The total production of 10,440 barrels for this quarter was a 5% increase on the
previous quarter (9,940 barrels). There were 5 days of production shut-in during the quarter covering
planned equipment servicing, fixing data recording malfunctions and replacing production sensors.
Anshof-3 production performance continues to exceed expectations with strong pressure support and
deliverability. Water-free production has been maintained with the crude oil redetermined at a slightly
Page | 6
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
higher API crude at 33.5°. Crude oil quality continues to meet all the required specifications of the
transporter and the buyer (OMV-refinery near Vienna).
Limited crude oil storage capacity at the Anshof-3 well site continues to cause unintended production
interruptions, mostly at the end of weekends when road transport is curtailed by road regulation. ADX
has refurbished and installed a storage vessel (1 x 50 m³) at the Anshof-3 site during the quarter to
mitigate this limitation. The tank’s commissioning is expected during Q3 and will enable an increase in
Anshof-3 production to approximately 150 barrels per day.
A second 50 m³ oil storage tank is expected to be installed and operating on site to facilitate the
increased field production after the drilling of the Anshof-2 well.
Anshof-2 and Anshof-1 Development Drilling
The Anshof-2 and Anshof-1 development wells will be drilled from the same drilling and production
site as the Anshof-3 well.
The wells are planned to progressively target thicker reservoir intersections in the 25 km2 mapped
Anshof structure. Anshof-3 did not intersect an oil water contact and the well continues to produce
water free oil, hence a large upside potential area remains to be appraised and developed.
Fast track development
wells targeting high
productivity thick Eocene
Crestal Anshof-3
discovery well
2
25 km field area
Anshof field outline based on 3D model utilising 3D seismic and offset well data showing the Anshof-3 well
and the Anshof-2 and Anshof-1 well locations (shown in blue)
Preparations continued during the quarter to drill the Anshof-2 well which is targeted for the third
quarter 2023 with a date yet to be determined for the Anshof-1 well. The activities are summarised as
follows:
Siteworks construction and well cellar installation was completed during the quarter for both
Anshof-2 and Anhsof-1.
Page | 7
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
The long lead items such as well casings and the wellheads for the Anshof-2 and Anshof-1 wells
are expected to be delivered during July 2023 and November 2023 respectively.
ADX has general framework contracts in place with RED Drilling & Services GmbH (RED) for a
drilling rig and a completion workover rig to undertake the work. ADX continue to work closely
with RED to finalise a drilling date for the Anshof-2 well, now expected to spud late September.
The Anshof-2 well will appraise the extent of the downdip oil in the structure. It will be a high angle
well with its meterage penetration of the Eocene reservoir maximising both the well oil flow rate and
potential reserves recovered by the well.
Anshof-1 well will be drilled as a producer in a more crestal part of the structure and as with Anshof-2
in a thicker part of the Eocene reservoirs relative to the Anshof-3 well located in the western part of
the structure. The bottom hole location of Anshof-1 will be optimised utilising data gathered from the
Anshof-2 well.
Permanent Production Facilities Planning and Engineering
Planning and design work continued during the quarter for the planned permanent production
facilities installation after the drilling of Anshof-2 and Anshof-1 wells. The base plan is to install
permanent production facilities at the Anshof-3 well site with new production pipelines to RAG export
facilities at Sierning approximately 4kms away. Alternative options are also being investigated for the
production pipeline tie-ins with the potential for cost and pipeline footprint reductions.
The production facilities and pipelines will enable 24 hour field production operations and replace the
current early production system where oil production is limited by trucking availability to RAG’s
Voitsdorf export facility. The commitment to the permanent facilities investment will be made
following the analysis of the results of the Anshof-2 and Anshof-1 well results.
Exploration Activities
Upper Austria AGS Licenses – Austria
ADX is operator and holds a 100% interest in the ADX-AT-I and ADX-AT-II exploration licenses other
than in the Anshof Discovery Area where ADX is operator and holds an 80% economic interest and
the Welchau Farmout area where MCF holds a 20% interest
Low Risk Gas Exploration Prospect Generation
An update of the exploration portfolio was completed with a significant addition to the number of low
risk prospects, as shown in Table EX-1 below (Refer to ASX release dated 22 June 2023). This resulted
in a 340% increase in best technical prospect resources for the low risk and appraisal drilling category
of the portfolio. The total exploration & appraisal portfolio excluding the now producing Anshof field
reserves is 213 mmboe best technical prospective resources 2.
2
The estimated quantities of petroleum that may potentially be recovered by the application of a future development project(s)
relate to undiscovered accumulations. These estimates have both a risk of discovery and a risk of development. Further
exploration appraisal and evaluation is required to determine the existence of a significant quantity of potentially recoverable
hydrocarbons.
Page | 8
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Table Ex-1 Summarising the Updated Exploration & Appraisal Portfolio, including the highlight for the
significantly increased best technical prospective resource for the IRR gas prospect (110% increase)
The main new resource contributions for the low risk and appraisal potential are the result of a number
of shallow gas prospects identified with AI (Artificial Intelligence) software, modern sequence
stratigraphic concepts and 3D seismic. The de-risking of a large satellite prospect (GRB) to the south
of the Anshof field development has also made a significant contribution. The shallow gas prospects
have large upside potential due to their stratigraphic trapping mechanism (Refer to ASX release dated
22 June 2023).
Figure Ex-1 below shows a map of ADX AT-I with the new gas prospects GAST, HOCH and SCHOE
highlighted in a green rectangle. The Figure (Fig. EX-2) further below is an example of the AI (artificial
intelligence) mapping area done in this area to image the detailed geological history of the gas
reservoir sands and detect their present day location.
Page | 9
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Figure EX-1 showing the newly identified shallow start trap gas prospects inside the green rectangle
Figure EX-2 AI (artificial intelligence) mapping
Welchau Gas Prospect
New, more detailed work on the prognosed Welchau gas reservoir has demonstrated that additional
thrusting could provide a thicker gross gas reservoir section than assumed in the initial resources
estimates. (Refer to ASX release dated 22 June 2023). In addition to the more detailed understanding
of the Welchau prospect internal architecture, four more potential follow up prospects were matured
as outlined in the figure below.
A public hearing by the Mining Authority was conducted in late June in relation to the Welchau -1 Well
permitting progress. The one day meeting, including a site visit with many local and political
stakeholders was completed without major objections. Hence ADX expects the permit to be issued in
the coming weeks.
Page | 10
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
ADX together with several leading geoscientists of the University of Vienna was awarded research
funding by the Austrian Federal Science Fund. While large parts of the substantial funding package will
go to the University of Vienna to conduct leading edge structural geology work (i.e. section balancing
and field work), ADX will be a major beneficiary because most of the work will be done over and close
to the Welchau anticline area and areas further north where ADX has already identified several follow
up prospects which would become highly attractive drilling targets should the Welchau-1 well be a
discovery.
Figure EX-3 Cross section showing Welchau prospect architecture and follow up prospects.
IRR Gas Prospect
A program of new technical work has been undertaken in relation to the IRR prospect with a team
consisting of ADX staff and international consultants who have a proven track record in discovering
large stratigraphic fields. In addition to de-risking the prospect the new work focused mainly on
reservoir models and 3D seismic attribute work has resulted in a significant, 110% best technical
prospective resource 3 increase as per Table Ex-1 above.
The 3D seismic attribute work indicates a similar seismic response for IRR-1 as a nearby gas field which
has produced around 155 bscf of high quality dry gas. This above mentioned analysis and modelling
indicates the potential for a very large upside prospective resource of 79 bscf as shown in resources
table below (refer to footnote 4 for Cautionary Statement in relation to Prospective Resources). The
3D seismic response is shown in Figure Ex-4.
The estimated quantities of petroleum that may potentially be recovered by the application of a future development project(s)
relate to undiscovered accumulations. These estimates have both a risk of discovery and a risk of development. Further
exploration appraisal and evaluation is required to determine the existence of a significant quantity of potentially recoverable
hydrocarbons.
3
Page | 11
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Table EX-2 IRR Prospective Resources (refer to ASX release dated 22 June 2023)
Figure EX-4 Seismic section and 3D seismic response for IRR prospect
Upper Austria Farm-out Activities
In addition to the transaction with MCF Energy Ltd, described in detail in the previous quarterly report
dated 28 April (MCF to pay 50% of the Welchau-1 well cost for a 20% economic interest), ADX has been
engaged in on-going discussions with multiple parties to fund further exploration and appraisal programs
in Upper Austria. This has resulted in in a number of farm in proposals currently under discussion with
the interested parties which ADX expects to announce in the coming quarter.
PARTA EXPLORATION PERMIT AND IECEA MARE PRODUCTION LICENSE – Romania
ADX holds a 49.2% shareholding in Danube Petroleum Limited (Danube). The remaining shareholding
in Danube is held by Reabold Resources Plc. Danube via its wholly owned subsidiary, ADX Energy
Panonia srl, holds a 100% interest in the Parta Exploration license (including a 100% interest in the
Parta Appraisal Sole Risk Project) and a 100% interest in the Iecea Mare Production license. ADX is the
operator of the permit pursuant to a services agreement with Danube.
Ongoing engagement with the Authorities with respect to preparation for a government decision in
relation to the Parta exploration license extension. The Iecea Mare production license which has a
validity (or term) of 20 years and is not affected.
Nothing further to report.
Page | 12
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Permit d 363C.R-.AX – Offshore Italy
ADX is operator and holds 100% interest in the d 363C.R-.AX Exploration Permit
ADX is awaiting ministerial response following the submissions of several technical, commercial and
financial capability documents for the award of a gas exploration and exploitation license. It was informed
by the Italian ministry during the quarter that the documents are currently under a final review by an independent
group of experts outside of the ministry.
New Ventures
Portfolio Expansion Opportunities
A combined production, appraisal and exploration opportunity was evaluated in Romania. The
submission of an indicative bid resulted in an invitation for detailed due diligence which ADX plans to
conduct during the next quarter.
Renewable Energy Projects – Austria
Vienna Basin Green Hydrogen Project
Wholesale electricity prices in Austria in the first half of calendar year 2023 averaged in excess of EUR
100 per MWh despite lower natural gas prices impacting the competitiveness of renewable hydrogen
as an energy source. The power futures market suggests that electricity prices in Austria will remain
elevated.
Hydrogen is increasingly considered to be an attractive alternative to natural gas both from a security
of supply and environmental perspective. Austria is targeting to produce 100% of its electricity from
renewable sources by 2030 and be climate neutral by 2040. As a result, Austria aims to produce 5,000
GWh of green gas by 2030.
During the quarter, the potential synergies of with the Vienna Basin Solar Project (i.e. direct supply of
renewable electricity to produce green energy) were further evaluated. Depending on the
configuration retained, the Vienna Basin Solar Project could supply electricity at a cost estimated
between EUR 25 per MWh to EUR 60 per MWh. In addition, this feedstock complies with the EU
regulatory requirements for the production of green hydrogen for the mobility sector.
On this basis, ADX is considering the development of a green hydrogen early production scheme
(Green Hydrogen EPS) to materialise a first mover advantage and generate early revenues. For this
purpose, a small-scale electrolyser with a capacity of ≤ 250 kW (able to produce up to 50 m3 of
hydrogen per hour at full utilisation) could be used. Such configuration would:
initially considerably reduce the need to secure supply of renewable electricity from external
sources and upgrade the electricity network; and
allow monetisation of renewable electricity generated from the Vienna Basin Solar Project
which cannot be injected into the grid.
Page | 13
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Hydrogen is currently available in 5 filling stations in Austria. However, various networks are interested
in developing this segment. In addition, green hydrogen (even in small quantities) has multiple
industrial applications and an extensive target customer base within a 100-km radius of the Vienna
Basin Fields.
A Green Hydrogen EPS concept will be reviewed and developed in the second half of the year.
The Green Hydrogen EPS concept and the Vienna Basin Solar Project are complimentary to the
development of larger scale hydrogen storage in depleted reservoirs with in ADX Vienna Basin Fields.
Such storage can be used for larger scale hydrogen production by ADX or third party hydrogen storage
when the planned European Hydrogen Backbone 4 is constructed to connect nearby Vienna to a major
hydrogen network.
Vienna Basin Solar Project
It is ADX’ long-term plan to make the Vienna Basin Fields a multi-energy hub combining low emissions
oil and gas production operations, renewable energy production and hydrogen storage activities.
Due to the limitations imposed by Netz Niederösterreich on access to the electricity grid and the
review of alternative monetisation solutions (including the Green Hydrogen EPS), the finalisation of
the Vienna Basin Solar Project basis of design (number of plants, location, initial PV capacity, potential
expansion of the PV) has been postponed.
The basis of design parameters will be adjusted in the second half of this year to incorporate the
requirements and interface with the Green Hydrogen EPS.
Oil, Gas and Geothermal Multi Energy Project in Upper Austria
The GMU prospect is located in the Eastern part of the ADX-AT-I exploration licence in Upper Austria
(Molasse basin). It combines a geothermal opportunity (fractured Jurassic limestone with 110°C
reservoir temperature) and stacked overlying oil and gas targets defined on 3D seismic.
The European Hydrogen Backbone (EHB) initiative is a group of European energy infrastructure operators which
initially published a vision paper for a dedicated hydrogen pipeline infrastructure, to a large extent based on
repurposed natural gas pipelines in July 2020, with maps covering nine EU Member States plus Switzerland, home
to the eleven Transmission System Operators (TSOs) participating at that time. Since then, the EHB initiative has
grown to 31 European network operators with infrastructure covering 25 EU Member States plus Norway, the
United Kingdom, and Switzerland. The EHB as currently contemplated is a geographically extended vision for a
dedicated hydrogen infrastructure stretching across these 28 European countries including Austria.
4
Page | 14
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
The GMU prospect as illustrated below offers:
geothermal potential representing 18 MW of thermal power;
monetisation opportunities through district heating and power generation;
high productivity reservoirs with best technical resource estimated at 3.9 mmboe 5; and
the opportunity to access the geothermal and the oil and gas potential with one multilateral
well.
Refer to ASX release dated 22 June 2023.
3D Seismic attributes x section indicate gas in Miocene Sand Stone
Reservoirs with flow rate potential up to 45 mmscf/d
Top Malmian
depth structure
Proven Jurassic fractured limestone
geothermal reservoir @ 110 deg C
The estimated quantities of petroleum that may potentially be recovered by the application of a future
development project(s) relate to undiscovered accumulations. These estimates have both a risk of discovery and
a risk of development. Further exploration appraisal and evaluation is required to determine the existence of a
significant quantity of potentially recoverable hydrocarbons.
5
Page | 15
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Finance and Corporate
Operations
During the June 2023 quarter, cash revenue received from oil and gas operations in Austria totalled A$
3.3 million (for oil and gas sales for the period March 2023 to May 2023). June 2023 oil and gas revenue
of EUR 0.74 million (A$ 1.2 million) was received after the quarter end.
Cash Balances
ADX’ cash at the end of the quarter was A$ 2.055 million.
Cash excludes funds secured for bonds and guarantees. Secured cash totalled A$ 1.1 million at the end
of the quarter.
Loan Repayments
ADX’s Austrian subsidiary (ADX VIE GmbH) repaid its third principal instalment of bank loans (EUR
183,333 / A$ 308,794). As at 30 June 2023, EUR 565,000 (A$ 926,381) remains repayable in three
remaining equal, semi-annual instalments until 31 December 2024.
Additional ASX Information
• ASX Listing Rule 5.4.1: Exploration expenditure during the quarter was A$ 233,000 excluding staff
costs. Full details of exploration activity during the quarter are included in this Quarterly Activities
Report.
Page | 16
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
• ASX Listing Rule 5.4.2: Production expenditure in Austria during the quarter was A$ 1,484,000
excluding staff costs. Appraisal expenditure in Romania during the quarter was A$ 10,000,
excluding staff costs. Full details of production and appraisal activities during the quarter are
included in this Quarterly Activities Report.
• ASX Listing Rule 5.4.3: A tenement schedule is provided at the end o