Activities Report
For the Quarter Ended 30 September 2024
ADX Energy Ltd (ASX: ADX, “ADX” or “the Company”) is pleased to provide an update of its activities
for the quarter ended 30 September 2024.
Past Quarter Highlights
Austrian Net Production averaging 217 BOEPD with sales revenue A$2.3 million for the quarter.
The Anshof-2A side track oil appraisal well encountered a 6.5-metre net vertical oil column in high
quality Eocene aged sandstone reservoirs.
A revised range of Prospective Resources for the Welchau-1 discovery well was announced on 26
September 2024 with the advice that hydrocarbons are likely to be a high API light oil and
associated gas discovery rather than a liquids-rich gas discovery as was predicted prior to drilling.
The Lichtenberg-1 gas exploration well, located in the ADX-AT-I licence was spudded.
Permitting, planning, procurement and design continued for the testing of the Welchau-1 oil and
gas discovery during the fourth quarter of 2024.
Follow up Welchau play exploration targets have been identified and evaluated including the
deepening of Welchau-1 and the Rossberg step out lead.
ADX’ cash at the end of the quarter was A$ 16.1 million.
Next Quarter Planned Activities
Tie in and commencement of production from the successful Anshof-2A oil appraisal well.
Drilling and evaluation of the Lichtenberg-1 gas exploration well.
Production testing of the Welchau-1 oil and associated gas discovery.
Continue to mature Welchau follow up exploration targets and large, high impact gas targets in
100% equity held acreage in the ADX-AT-I licence.
ADX Executive Chairman, Mr Ian Tchacos, said, “The past quarter has been a period of
exceptional operational activity including the drilling of the successful Anshof-2A oil appraisal
well, commencement of drilling the Lichtenberg-1 gas exploration well, as well as finalising
the necessary analysis work and preparations to production test the Welchau oil and gas
discovery. Our Shareholders can now look forward to additional oil production from Anshof2A, the results from the play opening Lichtenebrg-1 gas exploration well and production
testing results from the potentially transformational Welchau-1 discovery. ADX’ goal from our
ongoing appraisal and exploration activities is to develop a substantial oil and gas resources
base in Austria, a country which is highly dependent on oil and gas imports in the heart of
energy starved Europe.”
__________________________________________________________________________________________________________
ADX Energy Ltd | ABN 50 009 058 646 -Registered and Principal Office Australia
29 Bay Road, Claremont WA 6010, Australia
Telephone: +61 8 9381 4266 | admin@adxenergy.com.au | www.adxenergy.com.au
Page | 1
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
OPERATIONS REPORT
Production Activities
ZISTERSDORF AND GAISELBERG PRODUCTION ASSETS – Vienna Basin, Austria
ADX is operator and holds a 100% interest in the production
ANSHOF OIL DISCOVERY – ADX-AT-II licence, Upper Austria
ADX is operator and holds an 50% economic interest in Anshof-3 production
Production Operations
Austrian oil equivalent sales during the quarter decreased by 7% primarily due to the shut-in of the
Anshof -3 well for safety reasons during set up and rig down of the rig drilling the Anshof-2A appraisal
well, as well as planned upgrades to the Anshof permanent production facility. Oil and gas production
at the Vienna Basin fields averaged 172 BOEPD during the September quarter compared to 185 BOEPD
in the previous quarter, an 8% decrease. The Anshof-3 well contributed 44 BOPD of net sales during
the quarter despite down time of 17%. The total net sales during the quarter including the Anshof oil
field and the Vienna Basin fields was 216 BOEPD.
Production histogram showing ADX net Austrian barrels of oil and gas (oil equivalent) production during the
current quarter and the previous quarter
Page | 2
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Field Revenues and Product Pricing
Brent reference oil pricing weakened by 6%, averaging USD 80.18 per barrel for the September
quarter. Gas prices strengthened by 21%, averaging EUR 33.68 per MWh for the September quarter.
Oil and gas sales revenue histogram showing impact of production and oil and gas price on revenue
Table 2 below shows sales revenues of EUR 1,344,622 for the September 2024 quarter compared to
EUR 1,503,500 in the June 2024 quarter with stable production from Anshof and the Vienna Basin
Fields. The drop in revenue during August and September was due to a combination of shut in
production at Anshof and weakening oil price.
Page | 3
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Hedging
ADX has continued to deploy a rolling hedging strategy seeking to provide stable near term revenue
generation during volatile market conditions. A number of hedging transactions have been deployed
during periods of favourable market conditions.
On 3 April 2024, ADX executed hedging transactions with Britannic Trading Limited with a fixed price
swap contract for 15,000 barrels of oil at a fixed Brent crude oil price for June 2024 to October 2024
inclusive of USD 85.31 per barrel. The quantity of hedged oil equates to approximately 100 BOPD
during the period.
On 5 July 2024, ADX executed further hedging transactions with Britannic Trading Limited with a fixed
price swap contract for 6,000 barrels of oil at a fixed Brent crude oil price for November 2024 and
December 2024 inclusive of USD 83.15 per barrel.
The balance of the crude oil production from the Vienna basin fields and Anshof production remains
unhedged during the period allowing ADX to maintain exposure to upside in Brent crude oil pricing.
Gas production from the Vienna basin fields is also not hedged.
Appraisal & Development Activities
ANSHOF EOCENE OIL PROJECT – Anshof Field Area, ADX-AT-II LICENCE, Upper Austria
ADX is operator and holds a 50% economic interest in the Anshof Field Area and a 60% interest in
Anshof-2A well. ADX is operator of the ADX-AT-II exploration licence and holds a 100% interest in
the licence other than the Anshof Field Area, Anshof-2A well and the Welchau Investment Area.
(Refer to location map on next page)
Anshof-3 Production
Anshof-3 produced at an average daily rate of 89 BOPD during the quarter with 83% uptime over 92
production days. The total production of 8,183 barrels for this quarter was a 11% decrease on the last
production quarter (Q2 2024, 8,369 barrels). There were 15.2 days of production shut-in during the
quarter primarily due to planned upgrades to the Permanent Production Facility and safety related
production shut-in for the rig up of the RED E202 drilling rig for Anshof-2A drilling operations.
A high level summary of the reasons for Anshof-3 down-time is shown below;
•
•
•
Troubleshooting and replacement of level measurement sensors in the 3-phase separator,
Shut in for safety reasons whilst the RED E202 drilling rig was rigged up and down for the Anshof2A drilling, and
Planned upgrades to address issues with the Permanent Production Facility (refer to “Permanent
Production Facilities Installation, Engineering and Commissioning” section below) .
At the end of the quarter, Anshof-3 was producing at 104 bopd. The well continues to show strong
performance with no impairment to well productivity.
Page | 4
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Location map for the Anshof Field Area within the ADX-AT-II licence. The low-risk appraisal follow up satellite
prospects where ADX has a 100% economic interest are also shown
Development Drilling Program – Anshof-2A Well
The Anshof-2A (“ANS-2A”) side track oil appraisal well, located in the ADX-AT-II licence in Upper Austria
was spudded at 06:00 am Central European Time on the 7th of September 2024. ADX is the operator
and has a 60% economic interest in the well.
The well successfully targeted thick and high porosity Eocene reservoirs up dip from the Anshof-2 well
which previously intersected similar quality reservoirs below the oil water contact. The well objectives
were to further appraise and develop the Anshof Oil Field which was discovered by the Anshof-3 well
in January 2022. The ANS-2A will be completed as the second oil producer in the Anshof Oil Field when
it is tied in to the adjacent Anshof permanent production facility (“PPF”).
ANS-2A Well Results
The ANS-2A well has encountered a 6.5 m net vertical oil column in high quality Eocene aged sandstone
reservoirs within a 10 m net sand (refer to the figure below). This oil column compares very favourably
with the Anshof-3 discovery well which had a 2.5 m net oil column and has produced since October
2022 at stable rates averaging approximately 110 BOPD. The net oil reservoir intersection at ANS-2A
is approximately 3 times that of Anshof-3 with approximately 20% higher porosity and permeability.
Page | 5
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Figure showing a comparison of the Eocene sand thickness (shown in yellow) encountered in the Anshof-3
well (LHS), the ANS-2A well (Middle) and the Anshof-2 well (RHS)
Figure showing the Anshof Oil Field outline appraised to date and areas of greater Eocene reservoir thickness
with the bottom hole location of the Anshof-3 discovery well, the Anshof-2A sidetrack well and the Anshof-2
well. The depth figures shown are TVDSS metres
The Eocene reservoirs encountered at ANS-2A are similar in thickness and quality to the reservoirs
encountered in the down dip Anshof-2 well, confirming that thicker and more productive reservoirs
are prevalent in the Eastern part of the field compared to the Anshof-3 discovery well to the west. The
ANS-2A well top Eocene intersection is slightly down dip from the Anshof-3 discovery well which is
now interpreted to be near the crest of the Anshof structure.
Page | 6
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Based on electric line logging data and pressure data recovered, the well has encountered Eocene
sandstone reservoirs between 1586.5 m Total Vertical Depth Sub Sea (“TVD SS”) and 1599 m TVD SS.
An oil water contact is interpreted at a depth of 1593 m TVD SS. Pressure data recovered from ANS2A and the producing Anshof-3 well confirms a continuous oil pool (refer to the figure above).
Anshof-2A Participating Interest
In accordance with Anshof Field Area Partnership agreements, the economic interests in the Anshof2A (“ANS-2A”) well will be 60% ADX and 40% MND Austria a.s. (MND).
XST elected not to participate in the Anshof-2 well and the subsequent ANS-2A well. ADX and MND
have funded XST’s share of well costs on 50:50 basis and will in turn obtain the right to 60% and 40%
respectively of production from the well unless XST opts to buy back into the well at a premium of
500% to well costs. XST retains its 20% economic interest in the remainder of the Anshof Field Area
Partnership (i.e. Anshof Field Area less the Anshof-2 and ANS-2A wells) with both ADX and MND’s
economic interests remaining at 50% and 30% respectively.
Future of ANS-2A Well Operations
Operations commenced with a workover rig on 30 September 2024 to run tubing, perforate and acid
stimulate the ANS-2A well. Completion operations on the ANS-2A well during the fourth quarter
include the installation of a rod pump. The well will be tied-in to the Anshof PPF as a producer in
December 2024 following the installation of pipework and the connection of the well to the PPF
electrical system and remote control systems. Following tie-in, the ANS-2A well will be tested to
determine a long-term optimal rate. Commercial production can commence immediately in
conjunction with the already producing Anshof-3 well.
Figure showing the RED E202 rig drilling the ANS-2A well at the Anshof PPF location. On the left hand side of
the rig the rod pump on the Anshof-3 discovery well can be seen.
Page | 7
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Permanent Production Facilities Installation, Engineering and Commissioning
The Permanent Production Facility (PPF) continues to perform very well.
Key development activities during the quarter were as follows;
•
•
•
•
The initial teething problems with measurement sensors in both the 3-phase separator and the
storage tanks (oil and water) were successfully resolved at the beginning of this quarter,
The increased temperature in the settling tanks and utilising waste heat to the heat exchanger has
increased the efficiency of the settling process. The oil delivered has a consistently very low water
cut,
Electrical inspection and certification were completed in August 2024, and
The PPF was shut-in from 9 to 17 September and underwent significant planned maintenance (190
hours), fixing of defects and improvements.
The PPF provides the following opportunities to optimise field production at Anshof;
•
•
•
•
•
Increased production capacity (3,000 barrels of liquids per day),
Capability to process oil from multiple wells,
Additional oil storage capacity,
Use of associated gas for power generation and process heat, and
Enhanced automation requiring less manual operations.
The PPF will be mostly unmanned and operate 24 hours per day with wireless data transmission.
Page | 8
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Exploration Activities
Upper Austria AGS Licences – Austria
ADX is operator and holds the following interests in Upper Austria:
• ADX-AT-I: ADX holds a 100% interest in the ADX-AT-I exploration licence. ADX’ interest in part of
this licence, the MND Investment Area, will reduce to 50% upon the completion of MND’s
investment obligations under the energy investment agreement relating to the MND Investment
Area.
• ADX-AT-II: ADX holds a 100% interest in the ADX-AT-II exploration licence, except as follows:
o
ADX holds a 75% interest in the Welchau Area of the ADX-AT-II licence; and
o
ADX holds a 50% interest in Anshof Field Area of the ADX-AT-II licence other than the Anshof2A well where ADX holds a 60% interest.
Map showing the Upper Austria AGS Licences
Page | 9
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Welchau Gas Liquids Discovery
The Welchau-1 drilling location in the Northern Calcareous Alps, in the ADX-AT-II licence area
During the quarter, the significant amount of well data gathered from drilling and evaluating the well
has been utilised for structural interpretation, reservoir characterisation, resource estimation and well
test planning. 3D modelling work was completed with a resource estimate made. The well test is
planned to commence in early November 2024.
Based on the data analysis to date, ADX believes it is most likely that Welchau is a high API
hydrocarbon liquid (or light oil) and associated gas discovery rather than a liquids-rich gas discovery
that was predicted prior to drilling.
Welchau-1 Structural Definition
The Welchau-1 well is mapped as being at or near the crest of an East-West trending, asymmetric
anticline. This structural interpretation is in line with the pre-drill structural model prediction. The slight
change in the strike of the fold axis makes the structure less cylindrical than predicted (in the Eastern
part of Welchau anticline). The reservoir intersection at Welchau-1 interpreted to be significantly
Page | 10
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
greater across three reservoirs than in the Molln-1 well. Given that oil was recovered at Welchau-1 up
dip of Molln-1 which tested gas and condensate, it is now interpreted that Molln-1 is in a separate
accumulation to Welchau-1. More details on the thrusting and faulting resulting in a potential
boundary between Molln-1 and Welchau-1 wells is shown below.
Welchau-1 Top Steinalm Formation simplified post drill map. The 1989 Molln-1 gas discovery is interpreted
as a separate accumulation that is not connected to Welchau-1
Welchau-1 Data Analysis
The three primary carbonate reservoirs in the Welchau-1 well, promising for testing and ongoing
appraisal, are the Reifling (128 metres), Steinalm (118 metres) and the Guttenstein (111 metres). The
Steinalm reservoir flowed condensate rich gas at a rate of 4 MMSCFPD in the nearest discovery well
(Molln-1) located just some 3 km away and tested in 1989.
The analysis of Welchau-1 well results including hydrocarbon shows, formation cuttings while drilling,
electric line logging, formation sampling and coring were used to update the resource range for
Welchau and finalise the well testing design.
Third-party petrophysical consultants have evaluated the three key reservoirs and integrated the
routine and special core analysis measured data from the 7-metre Steinalm core into their evaluation.
They have interpreted all three reservoirs to be hydrocarbon bearing. It is noted however, that
estimation of hydrocarbon saturation in tight fractured carbonates can be difficult to assess in the
presence of micro fractures due to uncertainty in relation to formation water properties (i.e. electrical
conductivity – salinity).
A 43° API light sweet oil was recovered from the Steinalm Formation in a Modular Dynamic Tester
(MDT) down hole sample tool. The vertical extent of this light oil in the Steinalm or in the shallower
Reifling and deeper Guttenstein is uncertain at this stage. There is no clear evidence of a hydrocarbon
water contact in any of the reservoir formations based on the open hole wireline log data.
Page | 11
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Welchau Carbonates Conceptual Model of an Open Permeable Fracture Network and other transmissibility
events seen in the well such as reactivated beddings
Wellbore image analysis specialists have built a conceptual 3D model of the open permeable fracture
network (“Network”) in the vicinity of the Welchau-1 well. The Network consists primarily of fractures
with some “reactivated beddings” associated with folding of the rock. These “reactivated beddings”
are also expected to contribute to well flow and recovery.
The 3D model is based on detailed fracture and fault analysis using the Welchau-1 image log data, the
open hole log data together with the dynamic drilling data (i.e. mud losses to the formation and gas
shows from the formation). The analysis includes the identification of the many fracture types as well
as their frequency, orientation, etc. The multiple open fractures and resulting fracture networks that
have been identified are critical to hydrocarbon flow and hydrocarbon recovery. This 3D conceptual
modelling work has been utilised for resource estimation, well test strategy, well test planning and
future appraisal drilling.
Welchau-1 Revised Resource Estimate
Based on the data analysis to date, ADX believes it is most likely that Welchau is a high API hydrocarbon
liquid (or light oil) and associated gas discovery rather than a liquids-rich gas discovery as was
predicted prior to drilling.
Due to the uncertain nature of the Welchau reservoir performance prior to testing, ADX does not
believe it is appropriate to provide a definitive or detailed resources range at this stage. However, ADX
provided the following unrisked Prospective Resources range (ASX release on 26 September 2024), as
Page | 12
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
guidance to shareholders, of the oil and associated gas potential of reservoirs intersected in the
Welchau-1 well. The range of Prospective Resources estimated using probabilistic methodology is very
large from a low case of 12 MMBOE to a high case of 217 MMBOE1 (refer to Figure below). The
resources estimate include associated gas determined from the analysis of oil recovered from
Welchau-1 and converted to BOE using a 5.6 MCF/BOE conversion factor. The previous reporting date
of the best technical Prospective Resources was 22 June 2023 (prior to the drilling of Welchau-1 in
March 2024 and the subsequent data analysis work).
Welchau Prospective Resources Estimates where MMBOE means million barrels of oil equivalent
Prospective Resources are those estimated quantities of petroleum that may potentially be recovered
by the application of a future development project(s) related to undiscovered accumulations. These
estimates have both an associated risk of discovery and a risk of development. Further explorations
appraisal and evaluation is required to determine the existence of a significant quantity of potentially
moveable hydrocarbons.
1
ADX intends to revise Welchau resource estimates following the planned testing program, subsequent
analysis of test results and further ongoing mapping work. ADX will also provide an update on the
follow up exploration potential at the nearby Rossberg lead, as well as the deeper potential at Welchau
in reservoirs below the 7” casing at the well’s TD (1733 metres) that have yet to be drilled.
Welchau-1 Well Test Permitting
Operational and environmental permits have been submitted to the designated authorities for an
extended testing program during the Austrian winter months from 1 October 2024 to 31 March 2025.
Permitting at the Welchau-1 location has required extra environmental precautions given the well
sites proximity to a national park.
Welchau-1 Well Test Operations
Testing operations at Welchau-1 are expected to commence late October following the anticipated
receipt of environmental clearance and the mobilisation of a workover rig. The workover rig will be
used to run a test string, which includes tubing and a down hole packer system into the cased and
suspended well.
The environmental clearance will allow for up to six months of continuous (24-hour) testing operations
providing ADX with ample time to carry out an extensive testing program.
A testing program has been developed to primarily determine:
•
•
•
reservoir fluid type present in key reservoirs;
the flow capacity in key reservoirs; and
the reserves potential of the reservoirs.
Page | 13
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Initially the test will focus on the two major reservoirs, starting with the deeper Steinalm and then the
shallower Reifling. If good flow performance is achieved, the Steinalm test may be extended to obtain
longer term flow data, noting that under Austrian legislation it is permitted to produce up to 30,000
barrels from a long-term testing operation. A workover rig used at ADX’ Vienna Basin fields has been
mobilised to Upper Austria to complete the Anshof-2A well and then undertake test program well
work at Welchau. Utilisation of this rig across ADX’ projects along with other synergies such as using
experienced production personnel to supervise Welchau testing provides ADX with the operational
flexibility to vary the program without significantly increasing costs.
Welchau-1 follow up Potential
The Welchau-1 well has confirmed a highly prospective hydrocarbon play. The well has confirmed the
existence of hydrocarbon liquids and associated gas across multiple extensive carbonate reservoir
intervals, trapped by a large hydrocarbon charged seal in a structural setting capable of containing
large volumes of hydrocarbons.
Two immediate, follow up exploration targets have been identified:
•
Welchau-1 Deepening: There remains over 1000 metres of exploration potential below the current
Welchau-1 well TD (1733 metres). The opportunity to deepen the Welchau-1 well after testing the
existing zones of interest continues to be assessed in conjunction with ongoing structural modelling
of the Welchau discovery.
•
Step-out Exploration Lead: ADX has already identified several follow up target structures in the
same gross trend as Welchau. An example is the Rossberg lead which has a similar anticlinal
structure and shallow drill depths to Welchau. Rossberg is located approximately 6 kilometres to
the north-west of Welchau-1. The Rossberg structure has been identified from surface imaging,
dynamic structural balancing techniques together with detailed mapping of the surface geology. As
was the case with Welchau the existing 2D seismic may help to detail the closure. Additional field
work is being undertaken to mature this prospect as a potential follow up exploration well.
Rossberg lead follow-up exploration to Welchau
Page | 14
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
ADX-AT-I 2024 Gas Exploration – Lichtenberg-1 exploration well
Upper Austria ADX-AT-I Exploration Licence, including the MND Investment Area (since December 2023), the
location of the LICHT-1 exploration well and the follow-up leads
The Lichtenberg-1 (“LICHT-1”) gas exploration well, located in the ADX-AT-I licence in Upper Austria,
spudded at 07:00 am Central European Time on the 26th of September 2024. Approvals from both
Mining Authorities (part of Austrian Federal Ministry of Finances) and the Upper Austrian Nature
Conservation Department were received in a relatively fast time. The RED Drilling & Services GmbH
(RED) E-202 rig is being used to drill the LICHT-1 well. This rig was recently used to drill the successful
Anshof-2A appraisal well which will soon be completed as an oil production well.
ADX is the operator and will retain a 50% economic interest in the well and the MND Investment Area
after completion of earn in obligations by MND Austria a.s. (MND). ADX will retain a 100% interest in
the remainder of the ADX-AT-I licence. MND will fund the first EUR 4.5 million of Lichtenberg-1 well
costs in addition to a previous EUR 0.45 million cash payment to earn a 50% economic interest in the
well and part of the ADX-AT-I licence.
The LICHT-1 well’s primary target is an Upper Oligocene sandstone reservoir as well as a few slightly
shallower, geologically similar reservoirs. These sandstone reservoirs typically produce at relatively
high production rates, more than 10 MMSCFPD based on offset production wells in the area. LICHT-1
is expected to take approximately 30 days to drill to the total depth (TD) of approximately 2900 metres
measured depth (MD). If successful, detailed logging, casing and suspension of the well will take
approximately a further 10 days.
At time of Reporting, gas sold into the domestic market in Austria was achieving approximately US$13
per MCF equivalent pricing meaning any discoveries the Company makes could be extremely valuable.
Page | 15
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
The first Oligocene gas reservoirs are expected from around 2000 metres MD, with the main primary
target reservoir expected from approximately 2500 metres MD.
The RED E-202 rig on location at the LICHT-1 well site
ADX believes there is strong evidence for the likely presence of marine sandstones of Oligocene age.
The likelihood of high quality reservoirs at LICHT-1 is based on data from previously drilled offset wells
to the north with similar seismic amplitude or brightness anomalies which have encountered highly
productive gas sands.
Success at LICHT-1 will significantly upgrade and de-risk the three very close by follow up prospects
shown in the previous map. Further prospects in this area within the main Flysch geology thrusts are
available too. Due to the large structural extent of these prospects, the upside potential (i.e. P10) of
both STOET and HERR could be twice as large as currently targeted by the LICHT-1 which is considered
the lowest risk prospect in this area. In the past, the further South shallow Flysch thrusting front area
was totally avoided due to seismic definition issues. The Figure on the next page shows that these
issues have now been largely resolved by ADX. The LICHT-1 expected main gas reservoir target is now
very clearly imaged from reprocessed 3D seismic image.
Page | 16
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
High quality 3D seismic provides confidence in relation to structural definition and the presence of marine
sandstone gas reservoirs
The LICHT structure is below a major “Flysch” thrust front which influences the wide range of
prospective resource potential at LICHT-1 shown in the Figure above.
In addition to the relatively low risk and shallow Oligocene sandstone targets at LICHT-1, further high
impact exploration potential exists at LICHT-1 approximately 1200 metres below the Oligocene. A
future “LICHT – DEEP” well could target both Eocene oil reservoirs proven elsewhere by ADX in the
Anshof-3 and Anshof-2A oil wells as well as deeper potential within the Jurassic Carbonates for both
oil and gas. ADX is currently undertaking seismic reprocessing to de-risk these deeper opportunities
(see Additional ADX-AT-I Gas Prospect Maturation section below).
Lichtenberg Prospective Resource Estimates
Prospective Resources are those estimated quantities of petroleum that may potentially be recovered
by the application of a future development project(s) related to undiscovered accumulations. These
estimates have both an associated risk of discovery and a risk of development. Further exploration
appraisal and evaluation is required to determine the existence of a significant quantity of potentially
recoverable hydrocarbons.
2
The Original Prospective Resources reporting date on 22 June 2023, updated on 20 August 2024.
3
Page | 17
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
ADX-AT-I Shallow Gas Prospects
In addition to drilling the Lichtenberg-1 well, ADX continues to mature low risk, shallow gas exploration
prospects such as HOCH and SCHOE in the Northern part of the ADX-AT-I licence shown in the Figure
below. The HOCH and SCHOE prospects can potentially be drilled with a smaller and lower cost rig
from the same location thereby reducing the monetary risk versus reward.
ADX is undertaking a budget inquiry to secure a suitable rig that will provide a more cost-effective
alternative for drilling shallower prospects in the future. These prospects are very close to gas
infrastructure and expected to contain easy to process dry natural gas (methane) only which would
reduce the development time and cost for any discovery.
The 3D seismic section below and the inserted reservoir amplitude map is indicative of gas reservoir
presence. It also summarises the most important technical features of the combined HOCH-GAST