Investor Presentation
Released
Released
Announcement PDF
An ASX listed European Energy
Producer and Explorer
“Reliable energy doesn’t need to cost the earth”
I n v e ASX:
s t o rADX
Update
adx-energy.com
|
2 2 J a n u a r y 2 0 2 4 | F o c u s o n We l c h a u D r i l l i n g
ASX:ADX
2
Disclaimer Statement
Important notice:
This document has been prepared by ADX Energy Ltd (“ADX”) for the purpose of providing information to interested analysts, investors and shareholders. Any statement, opinions, projections, forecasts or other materials contained in this document do not constitute any commitments, representations or
warranties by ADX or its directors, agents and employees.
Except as required by law, and only to the extent so required, directors, agents and employees of ADX shall in no way be liable to any person or body for any loss, claim, demand, damages, costs or expenses of whatsoever nature arising in any way out of, or in connection with, the information
contained in this document. This document includes certain statements, opinions, projections, forecasts and other material, which reflect various assumptions. The assumptions may or may not prove to be correct. ADX recommends that potential investors consult their professional advisor(s) as
investment in the company is considered to be speculative in nature.
The information in this presentation is in summary form only and does not contain all the information necessary to fully evaluate any transaction or investment. It should be read in conjunction with ADX’ other periodic and continuous disclosure announcements lodged with the ASX. This document does
not constitute an offer, invitation or recommendation to subscribe for or purchase securities and does not form the basis of any contract or commitment.
Pursuant to the requirements of the ASX Listing Rule 5.41 the technical and Prospective Resources information relating to Aus tria and Italy contained in this presentation has been reviewed by Paul Fink as part of the due diligence process on behalf of A DX. Mr. Fink is Technical Director of ADX Energy Ltd
is a qualified geophysicist with 30 years of technical, commercial and management experience in exploration for, appraisal and development of oil and gas resources. Mr. Fink is a member of the EAGE (European Association of Geoscientists & Engineers) and FIDIC (Federation of Consulting Engineers).
Independent audit of developed reserves have been completed for ADX’ Zistersdorf and Gaiselberg fields (“Fields”) in the Vienna basin and Anshof in Upper Austria (Austria) by RISC Advisory Pty Ltd (“RISC”). RISC conducted an independent audit of ADX’ Fields evaluations,including production forecasts,
cost estimates and project economics. Production from existing wells is classified as Developed Producing. Production from planned recompletion of existing wells to new intervals is classified as Developed Non-Producing. RISC is an independent advisory firm offering the highest level of technical and
commercial advice to a broad range of clients in the energy industries worldwide. RISC has offices in London, Perth, Brisbane and South-East Asia and has completed assignments in more than 90 countries for over 500 clients and has grown to become an international energy advisor of choice.
PRMS Reserves Classifications used in this presentation:
Developed Reserves are quantities expected to be recovered from existing wells and facilities.
Developed Producing Reserves are expected to be recovered from completion intervals that are open and producing at the time of the estimate.
Developed Non-Producing Reserves include shut-in and behind-pipe reserves with minor costs to access.
Undeveloped Reserves are quantities expected to be recovered through future significant investments.
A. Proved Reserves (1P) are those quantities of Petroleum that by analysis of geoscience and engineering data, can be estimated with reasonable certainty to be commercially recoverable from known reservoirs and under defined technical and commercial conditions. If deterministic methods are used,
the term “reasonable certainty” is intended to express a high degree of confidence that the quantities will be recovered. If probabilistic methods are used, there should be at least a 90% probability that the quantities actually recovered will be equal or exceed the estimate.
B. Probable Reserves are those additional Reserves which analysis of geoscience and engineering data indicate are less likely to be recovered than Possible Reserves. It is equally likely that actual remaining quantities recovered will be greater than or less than the sum of the estimated Proved plus
Probable Reserves (2P). In this context, when probabilistic methods are used, there should be at least a 50% probability that the actual quantities recovered will equal or exceed the 2P estimate.
C. Possible Reserves are those additional Reserves that analysis of geoscience and engineering data suggest are less likely to be recoverable that Probable Reserves. The total quantities ultimately recovered from the project have a low probability to exceed the sum of Proved plus Probable plus Possible
(3P) Reserves, which is equivalent to the high-estimate scenario. When probabilistic methods are used, there should be at least a 10% probability that the actual quantities recovered will equal or exceed the 3P estimate. Possible Reserves that are located outside the 2P area (not upside quantities to
the 2P scenario) may exist only when the commercial and technical maturity criteria have been met (that incorporate the Possi ble development scope). Standalone Possible Reserves must reference a commercial 2P project.
Prospective Resource Classifications used in this presentation:
Prospective Resources are those estimated quantities of petroleum that may potentially be recovered by the application of a future development project(s) related to undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development. Further explorations
appraisal and evaluation is required to determine the existence of a significant quantity of potentially moveable hydrocarbons.
P(90) Estimate: means at least a 90% probability that the quantities actually recovered will equal or exceed the estimate.
P(50) Estimate: means At least a 50% probability that the quantities actually recovered will equal or exceed the estimate.
P(10) Estimate: means At least a 10% probability that the quantities actually recovered will equal or exceed the estimate.
Oil and Gas Conversions
BOE means barrels of oil equivalent. Bcfe means billion of cubic feet of gas equivalent. Gas to oil conversion used in this presentation: 6 mcf of gas = 1 barrel of oil. Mcf means thousand cubic feet of gas
Investor Presentation – 22 January 2024
Investment Proposition and
Operating Strategy
Stable
Underlying
and Increasing
Cashflow
Reserves and
Production
Growth from
New Discovery
336 boepd
oil & gas production1
3
World-class
Exploration
Portfolio in the
heart of Europe
Value Adding,
Complementary
Renewable
Projects
1.72 mmbbl 2P reserves @
Vienna Basin Fields only.
Anshof Field subject to review 2
Operating
Capability
• Ability to
generate
and
operate
projects
213 mmbboe
3
prospective resources
Active Drilling
Program
• Funded by
Farmouts
• Validation
& risk
reduction
47 MW combined
renewable energy
potential
Prospective Resources are those estimated quantities of petroleum that may potentially be recovered by the application of a
future development project(s) related to undiscovered accumulations. These estimates have both an associated risk of discovery and a risk
of development. Further explorations appraisal and evaluation is required to determine the existence of a significant quantity of
potentially moveable hydrocarbons
1 August 2023 average production from the Zistersdorf & Gaiselberg fields and Anshof field. 2 ref. Reserves Reporting Date
& Valuation (Independently Audited) 04.11.2021 less production to 31
December 2022, 3 Best technical prospective resources for Upper Austria only. Prospective resources reporting date update 22.06.2023
Investor Presentation – 22 January 2024
4
Corporate and Asset Summary
Positioned for a smarter, cleaner future for Europe
Capital Structure
Austria Oil & Gas Assets
Austria Clean Energy Projects
Vienna Basin fields – 100% (production)
Anshof oil discovery – 50% (production & development)
ADX-AT-I & ADX-AT-II – 100% (exploration & appraisal)
Vienna Basin Green Hydrogen project – 100%
GMU geothermal project – 100%
Vienna Basin solar project – 100%
Share Price (19/1/2024)
A$0.095
Number of Shares on Issue
427.9 m
Number of Options
74M
Market Capitalisation
A$40.6 m
Cash (unrestricted) as at 31/12/2023 – est.
A$9 m
Debt (net of restricted cash for debt)
A$1.9 m
Enterprise Value
A$33.5 m
Number of Shareholders (approximate)
2,064
Political & Strategic Position
Stable jurisdictions with unmet energy demand
Excellent access to infrastructure
d363C.R-.AX permit (Italy)
Romania Oil & Gas Assets
Shallow waters offshore exploration permit – 100%
369 Bcf prospective resources1 (5 prospects)
Subject to ratification by the Italian authorities
49.2% shareholding in Danube Petroleum which holds:
- Parta exploration licence – 100%
- Iecea Mare production licence – 100%
Strong focus on energy security since Ukraine war
Operatorship capability & boots on the ground
Refer to Cautionary Statement in relation to Prospective Resources on Page 3 of this presentation
Investor Presentation – 22 January 2024
1 The original resources reporting date was on 30.08.2022
5
Our focus is on Austria and Europe
A great place to build a diversified energy business
Permit
& Environmental
Approvals
Permiting
& Environmental Approvals
(months)
Australian
Licht
Anshof
Welchau
0
10
20
A significant oil and gas industry
1 billion bbl oil & 2.7 Tcf gas
produced to-date
75 Years oil & gas duopoly
before ADX become the
third operator in country
Energy Demand is unmet
by local supply resulting in
Upper Austria Assets
Production, Exploration & Geothermal
50% exploration success rate 1,
infrastructure access, 3D seismic data set &
extensive portfolio
Investor Presentation – 22 January 2024
ADX Vienna Basin Fields
Oil and gas production,
H2 production & storage, Solar Park
Stable long life production, depleted reservoirs
for storage & connected to power grid as well as
oil gas pipelines
¹ In Upper Austria since 2000 -11 discoveries out of 22 wells
High Value Markets
Excellent Infrastructure that is
highly accessible and Regulatory
Processes are favourable & fast
30
6
European gas market dynamics
Large premium to US & structurally higher long-term prices
Dutch TTF vs U.S. natural gas and Asian LNG1
5(x) price increase due
Fundamental
Dutch TTF (USD per MMBtu)
U.S. natural gas (USD per MMBtu)
to Russia’s invasion of
Ukriane
LNG JKM (Platts) (USD per MMBtu)
changes
to
the
European gas market since Russia’s
invasion of Ukraine in Feb-22:
Impact of the energy crisis
distorted by mild weather in Europe
for the past 2 winters
Note: The Title Transfer Facility (TTF) is a virtual trading point
for natural gas in the Netherlands It is the most liquid pricing
location in Europe and serves as a pricing proxy for the overall
European LNG import market.
10%
increase in
global gas
demand from
2017-2021
40.9
Despite step-up in LNG imports, security
of supply remains a key concern
Reliance on spot LNG cargoes creates
supply chain uncertainties and risk
of diversion to Asian countries
Domestic gas production is down
33% since 2010 and expected to drop
13.1
9.4
8.0
2018-2021
2022
2018-2024 average TTE >380% above
2023
2024
10.4
2025
by an additional 7% by 2026
9.6
2026
>30%
US natural gas prices
2023-2026 TTF prices
above 20182021 average tracking Asian LNG prices
European gas approx. 5x US gas price
Long term trend of increasing gas price
Investor Presentation – 22 January 2024
1 2024-2026
Further decline in Russian piped
gas supplies from 2025 (expiry of
Ukraine gas transit contract by end of
Oct-24)
Elevated gas prices in Europe
anticipated for the foreseeable future
with increased correlation to LNG prices
data based on CME Group forward curve for Dutch TTF, U.S. natural gas (Henry Hub) and LNG Japan/Korea Marker (Platts) as at 18.01.2024
7
Recent Highlights
Welchau -1 well site construction
01 Financial
02 Transactions
• Anshof agreement finalised with MND1 –
two well funding (EUR 5.3M - pay 60% for
30% interest) plus back costs (EUR1.3M)
• Share Capital Consolidation of
1 for 10
• Placement & Share Purchase Plan
A$ 6.4M funds raised from European &
Australian Investors
• Gas exploration funding from MND - one
well funding (EUR 4.5M – pay 100% for 50%
in) plus back costs (EUR 0.45M)
• Welchau agreement amendment with
MCF2 - increased funding limit (EUR 5.1M)
and interest (pay 50% for 25% interest)
03 Asset Development
• Welchau Gas Prospect final approvals
and site construction – rig move end
Jan 2024
• Anshof-2 drilling – side track planned
for end Q1 2024
• Austria production facility upgrade commence production end Q1 2024
ADX Energy – Board Members
L-R: Andrew Childs, Non Executive Director, Peter Ironside, Co Company
Secretary, Ian Tchacos – Executive Chairman
Investor Presentation – 22 January 2024
1 MND Austria a.s.
Anshof-2 well drilling operations
|
2 MCF Energy Ltd
8
Planned Activities
A period of high activity funded by farmouts
2 new Anshof wells
Recommence production with capacity increase to
3,000 bopd
Near field oil exploration opportunities
Welchau- 1
Exploration well
Anshof-2
Side Track well
Anshof
permanent
production
facility
Anshof
Follow up well
ADX-AT-I
Exploration well
Anshof
Oil follow ups
Upper Austria
Gas exploration
Investor Presentation – 22 January 2024
Anshof field development program
Targeting low risk reserves and highly
profitable production
Gas exploration drilling
Sep
Welchau-1 drilling and play expansion
Near Sept-22
field gas exploration
New rapid gas commercialisation play
High impact gas exploration
Portfolio development
Ongoing expansion of drillable prospects
Complementary renewable projects
More high value targets generated from
extensive 3D seismic data base
Further farm-in transactions
8
Production and
Development
Vienna Basin Oil and Gas Fields, Anshof appraisal
and development update
9
10
Vienna Basin Production Assets
Stable, high value production with long term potential
A long-term future for Vienna Basin Fields
Vienna Basin Fields (100% interest)
✓ Low emission, low decline production delivering
long term cash flow (approx. 250 boepd)
✓ Ownership of 13.7 hectares of land suitable for
Solar Park - 65 Km from Vienna
▪ A unique position – own the land + storage reservoirs + green
power + connected to pipelines + availability of fresh water
▪ Addition of Solar Park, Hydrogen generation and Hydrogen
Storage for planned hydrogen back bone
✓ High value sweet crude oil, very favourable fiscal
terms (no royalties)
Wind park adjacent to ADX Vienna Basin Fields
Production operations at ADX Vienna Basin Fields
Multilayer field
suitable for H2
storage
1.72 mmbbl
2P developed
reserves Note 1
Investor Presentation – 22 January 2024
Pipeline to
Vienna refinery
& gas pipeline
Note 1: Reserves Reporting Date & Valuation (Independently Audited)
04.11.2021 less production to 31 December 2022
Anshof-3 production well and Early Production
Unit, Anshof-2 and 1 drilling locations
11
Anshof Production
Recommencement
of
Anshof-3
production - end Q1 2024.
Average monthly production rate
140
• Long term test production from Oct
2022 until Sep 2023
120
100
Average Production of 115 BOPD
80
60
40
20
Anshof-3 exploration drilling
2023
Sep
Aug
Jul
Jun
May
Apr
Mar
Feb
Jan
Dec
Nov
0
2022
• Stable water free daily rate of
approximately 140 barrels per day
• No pressure decline was observed
No pressure decline
No water
Oct
Monthly Production (BOPD)
Anshof-3 (BOPD)
• High quality crude oil (Brent
equivalent) transported by truck to
rail head and by rail to the Vienna
refinery
• The well was shut in after reaching
the regulatory limit of 5,000 tonnes
(36,000 Barrels) of test production
• Well shut in has enabled the drilling
of Anshof-2 and installation of
permanent facility
• Installation of permanent production
facility will allow higher production
rates
Investor Presentation – 22 January 2024
Anshof-3 long term test production
12
Anshof Appraisal and Development
Anshof-2 well results
ANS-3 vs ANS-2 Reservoir Comparison
▪ Thicker & better quality reservoir at or near the field oil-water-contact
▪ Eocene intersection some 40-50m shallow to prognosis potential oil
volume increased above an oil-water-contact
Anshof Reserves were reported on 31 October 2022. Reserves under review
following the results of Anshof-2 and subsequent wells planned for 2024.
ANS-3 oil
producer
Potential up-dip oil
side-track location
✓ Net vertical thickness (m): 2m vs 12m
✓ Porosity (Average/Max.):
12% / 18% vs 15% / 20%
Predicted
ODT
Interpreted
ODT
ANS-2
Proven oil
intersection
Net thickness colours & structure depth contours
Anshof-2 Sidetrack up-dip likely to be next producer, replacing planned crestal ANS-1 producer and minimising well cost
using existing ANS-2 well and sidetracking below existing 9 5/8” casing shoe.
Investor Presentation – 22 January 2024
13
Anshof planned activities
Anshof-2 drilling with the RED E-202
drilling rig
Well planning and drilling
✓ Review mapping and geological structural model post Anshof-2
✓ Confirm ANS-2 sidetrack location for a producer to drill after
Welchau -1 well (Q2 2024)
✓ Determine location for follow up Anshof well to increase
production and reserves.
Production operations
✓ Permanent production unit and the storage
tanks are being installed at the Anshof
location
✓ Planned hook-up of the Anshof-3 well for
production commissioning at end Q1 2024
Stable, high value production with
potential for ongoing reserves growth
Investor Presentation – 22 January 2024
Replacement Permanent Production Facility
Capacity: 3,000 - 4,000bopd - currently being moved from Ampfing to Anshof
Upper Austria Exploration
Program
Drill ready prospects with access to infrastructure
that are funded by farmouts
14
15
Upper Austria Exploration
High impact, drill ready portfolio in the heart of Europe
1
2
1020 km
807 bcfe1 World-class Welchau
gas prospect to be drilled in 2024.
acreage
Adjacent to tested gas discovery at Molln
20
Prospects and new High Value
3
Anshof near field, low risk follow
4
18 MW Geothermal low risk, long
2
3500 km
4
Infrastructure
Access
ANSHOF
1
term potential with shallow oil and gas
targets provides new opportunity
191 mmboe 1
Refer to Cautionary Statement in relation to Prospective Resources on Page 3 of this presentation.
¹ Best Technical Prospective Resources Prospective resources reporting date update 22.06.2023
2
3D Seismic
up oil prospect at GRB 9.5 mmbbl1
provides rapid pathway to further reserves
and cash flow
Investor Presentation – 22 January 2024
Prospects
3
Multiple High Impact Gas
Shallow gas play identified with state of
the art AI seismic processing
2
16
Welchau-1 Summary
Prospect History
▪ Northern Calcareous Alps exploration (OMV 1985
to 1995 & RAG/OMV 2012 )
▪ Four offset wells drilled (1 gas and 1 oil
discovery) in the foothills of the Austrian Alps
▪ New structural model based on integrated field
and modelling study – balanced cross section
▪ Up dip and potentially connected to a gas
discovery at the Molln-1 well drilled in 1989 that
encountered a proven gas column of 400m (900
m indicated) testing pipeline quality gas
▪ Analogous to giant anticline structures in
Kurdistan
1989 Molln-1 well test
Welchau
Trap: thrust anticline (outcrop mapping, balanced
cross section, 2D seismic along dip); Closure
Dimension Area 100 km², Relief 2140 m (max.)
Reservoir: Triassic Limestone (Steinalmkalk)
Fractured reservoir; Gross: 170 m
Investor Presentation – 22 January 2024
Molln-001
17
Welchau-1 Prospect
Resources summary
Comparison of ADX and Gaffney Cline Prospective Resource Estimates 2
ADX Gross Prospective Resource Estimates (Reported 20 June 2022)
Hydrocarbon Type
Unit
Minimum
Best Technical
Gas
BCF
171
651
Condensate
MMBL
6.8
26
Total (Gas Equivalent) 1
BCFE
212
Welchau Drill Site Location
Austrian Forestry Department landowner
Maximum
1315
52.6
807
1631
GaffneyCline Gross Prospective Resource Estimates - Calculated on gas equivalent basis.
Unit
1U
2U
3U
Total (Gas Equivalent) 1
BCFE
365
645
1128
Gaffney Cline to ADX Comparison
Variance
BCFE
72%
-20%
-31%
Note 1: Gas to condensate conversion used is 6 mcf of gas = 1 barrel of oil.
Gaffney Cline Audit Report (Refer ADX announcement 18/4/2023)
1.
2.
3.
4.
Source: Resources Audit Report Welchau Prospect, ADX-AT-II Concession, Austria, Prepared for Pinedale Energy Limited
(subsequently MCF Energy) by Gaffney, Cline & Associates Limited December 2022
There is no certainty that any portion of the resources will be discovered. If discovered, there is no certainty that it will be
commercially viable to produce any portion of the resources.
The Prospect extends outside of the ADX-AT-II license into open acreage, under application. The volumes presented here
represent the total structure.
1U is a PRMS equivalent to the low (minimum) case, 2U to the best technical case and 3U to the high (maximum) or upside
case.
Investor Presentation – 22 January 2024
2 ASX Prospective Resources date 22 June
2022
Refer to Cautionary Statement in
relation to Prospective Resources on
Page 3 of this presentation.
18
Welchau-1
Drilling Operations
Permit:
ADX AT-II
JV:
ADX 100%
Well scheme
Operational Readiness
Success case
Welchau well site construction on
10 January 2024
Well name: WELCHAU 1
1. Drilling and Environmental Permits
Received
Spud-in point :
E 77571
N 5301005
Elevation (MSL): 545 m
RT above GL: 6,23 m
2. All drilling equipment available
D ep t h M D
[ m]
UWI: WEL-001
E; N; TVDSS [m]
Target 1: 77612 ; 5300914 ; -636
TD 77746 ; 5300614 ; -1254
Stratigraphy and Mud system
400
500
600
700
800
Drilling Program
900
1. Total depth 1900 m (Vertical depth
1800 m)
1100
1000
Hard
drilling
Shallow
gas
300
1300
1400
Gutenstein Fm.
1376
Reichenhall Fm.
1584
1500
1600
1700
3. Drilling duration 6 to 8 weeks
4. Dry hole cost EUR 5.1 mill
Investor Presentation – 22 January 2024
1800 Lunz Fm.
1732
Wetterstein + Reifling 1777
1900
TD
2000
1900
Directional
20" Conductor ≈ 30 m
17 1/2" hole
13 3/8" BTC surface casing
100..120 m
Red E202 drilling rig
12 1/4" Hole
9 5/8" 40# N80-1 BTC
≈ 800 m
XO BTC x LTC
KOP @ 850 m
Az. 156°
DLS 3°/30 m
9 5/8" 43.5# L-80 LTC
1050 m
Hard drilling; fluid losses, over
pressure
2. Three drilling hole sections 17 ½'', 12
¼‚‘ and 8 ½‘’
1154
NaCl-inhibited polymer mud 1.4 kg/l
Reifling/ Partnach Fm. 1037
1200 Steinalm Fm.
Casing and Cementation
Class G 1.9 kg/l
Hard drilling; fluid
losses
[mMD]
0
35
40
90
130
Wellscheme
M ud and drilling problems
NaCl-inhibited polymer mud
1.12..1.125 kg/l
5. Rig mobilisation scheduled during
last week of January 2024.
200
Quarternary
Hauptdolomit
Opponitz Fm.
Lunz Fm.
Wetterstein Fm.
Top depth
FW
gel
0
100
4. RED Drilling & Services GmbH E-202
drilling rig contracted to drill well
Wellpath: build-and-hold
Scheme not scaled. All depth on this page count from Ground Level.
Formation
3. Well site construction complete
Target shape:
Polygon
Directional w aypoints:
EOB @ 1150 m
Incl. 28°
8 1/2" Hole
Class G 1.9 kg/l
7", 29#, N80Q, VAS
TD 1900 m
EOT @ 1900 m
TVD 1789 m
19
Welchau-1 Prospect
Commercial Fundamentals
Drill depth, location and gas markets
1. Relatively shallow drill depth approx 1800 m
Austrian Gas Net Work
Gas transit connected to Italy, Germany, Slovakia, Slovenia, Hungary
2. Short tie-in distance to the national gas
pipeline network or RAG network
3. Austria is interconnected with multiple
European Countries
4. Large unmet local gas demand
▪
▪
▪
340 BCF/yr annual demand
44 BCF/yr annual local supply (14% of demand)
Dependence on Russian gas
5. Attractive European Gas Price
▪
US$13.1 per MMBTU versus US$ 2.7 in US
Indicative development assumptions 1
1. 120 mmscf/day plateau rate (low to mid case)
2. 4 years appraisal and development
3. 1 exploration well, 1 appraisal well and 8
production wells
1 Based on GCA minimum Case Resources Estimate
Investor Presentation – 22 January 2024
Welchau tie-in to public or
RAG pipelines (18-25 km)
20
Welchau vs European gas projects comparison
Austria’s onshore setting & access to existing infrastructure delivers superior economics
Country
Austria
U.K.
Italy
Asset type
Onshore
Offshore
Onshore
Cost Environment
Medium
High
Medium
19-22% Royalty
No Royalty
10% Royalty
24% Corporate Tax
40% Corporate Tax &
Supplementary Charge
24% Corporate Tax
40% Windfall Tax
50% Windfall Tax
(until 31 December 2023 unless extended)
25% Energy Profits Levy
(up 25% of net asset value as at 31.12.2021)
Fiscal Terms
(until March 2028)
CAPEX per boe
USD 2.71
USD 17.12
USD 8.63
NPV10 per boe
USD 17.21
USD 13.42
USD 5.83
Profitability Index
6.311
0.792
0.683
Investor Presentation – 22 January 2024
1 Welchau gas project based on 10 wells
and 332 Bcf recovered (GCA Minimum resources case). 2 Based on Pensacola gas discovery in the U.K. Southern North Sea operated by Shell (Deltic Energy
plc investor presentation dated 19.01.2024). 3 Based on Colle Santo gas field development onshore Italy operated by LNEnergy (Reabold Resources plc investor presentation dated October 2023)
21
Planned Gas Exploration
IRR–1 Gas Prospect (Planned Q4 2024 Drilling)
New technical interpretation using seismic responses indicative of
gas and nearby well data
IRR
Prospect
Min
(P90)
Best
Technical
Max
(P10)
Analysis of analogous gas reservoirs in nearby gas field has led to a
significant upward revision of expected possible gas net pay thickness
Bscf
10
38
79
3D seismic response similar to adjacent gas field which has produced
~155 bscf of gas
Expected Miocene deep water turbidite reservoirs have a proven flow
capacity of up to 45 mmscf/day
•
•
E
ASX Prospective resources reporting date update 22.06.2023
155 Bscf
gas field
E’
155 Bscf existing field
IRR-1
IRR Prospect
IRR-1
Refer to Cautionary Statement in relation to Prospective Resources on Page 3 of
this presentation.
Investor Presentation – 22 January 2024
22
New Trend of Low Risk, Shallow Gas Prospects
Portfolio addition from new ideas and state of the art techniques
New gas prospects have been matured
Combination of AI Software, an international team of
stratigraphic trap experts and local knowledge leading to deep
understanding of unexplored gas potential
• Large stratigraphic upside potential
• Proven high permeability reservoirs (10 mmscf/day per well)
• Multiple additional prospects being generated
Prospect
Fluid
(Expected)
Best Technical
Recoverable
(BScf if gas)
SCHOE
GAS
6.6
HOCH
GAS
4.8
GAST
GAS
3.6
ASX Prospective resources reporting date update 22.06.2023
ADX AT-I license
A.I. software on 3D seismic detects channels
and rivers as they flowed 22 Mio years ago
Investor Presentation – 22 January 2024
Refer to Cautionary Statement in relation to Prospective Resources on Page 3 of this presentation.
23
ADX Role in European Energy Transition
Well positioned in the near-term as well as long-term
Oil & gas demand continues to increase
The transition to renewables is taking longer than
expected
Growth in Global Energy Demand
Pace of Transition to Date
Gas is a transition fuel in the EU
Financial and greenhouse reduction benefits but gas
supply is tight
Oil and gas industry can make a significant
transition contribution
Geothermal, hydrogen & CO2 storage are needed to
achieve net zero goals
“ADX Vienna Basin oil and gas fields are the
potential site for a Green Hydrogen Production
and Storage Project and a Solar Park for self
consumption and sales into power the grid”
Investor Presentation – 22 January 2024
84% of global energy supplied by coal, oil and gas
The ADX Team
Experience of our Board and Management Team
24
A highly experienced management team
with a proven track record of initiating,
operating and developing international
energy projects.
Mr Ian Tchacos, Executive Chairman
Ms Amanda Sparks, Finance Manager & Co Company Secretary
35 years oil and gas professional and Corporate Leader.
Petroleum Engineer, Operations and Corporate Development
20 years oil and gas professional. Finance and Company Secretarial,
Chartered Accountant
Mr Paul Fink, CEO and Executive Director
Mr Peter Ironside, Co Company Secretary
30 years oil and gas professional. Geophysicist, New Ventures
and Exploration Management (on medical leave)
35 years resources professional. Finance, Chartered Accountant and Corporate
Development
Mr Andrew Childs, Non Executive Director
Mr Alan Reingruber, Managing Director ADX VIE
35 years oil and gas professional. Geoscientist, Corporate
Development
20 years oil and gas professional. Reservoir Engineer, Operations and
Corporate
Mr Edouard Etienvre, Non Executive Director
Mr John Begg, Board Advisor ADX Energy
20 years oil and gas professional. Finance and Corporate
Development
35 years oil and gas professional and Corporate Leader. Geoscientist and Corporate
Development
Investor Presentation – 22 January 2024
Thank you for your
attendance
For further information contact:
ASX: ADX
Ian Tchacos
Executive Chairman
ian.tchacos@adxenergy.com.au
Amanda Sparks
Finance Manager & Company Secretary
amanda.sparks@adxenergy.com.au
adx-energy.com
Connect with Us
Better energy
A cleaner smarter future for Europe
25
Share your feedback
Discover