Investor Corporate Presentation
Released
Released
Announcement PDF
ADX Energy Ltd | ASX: ADX | ABN 50 009 058 646
Investor Corporate Presentation
Date: 26 October 2026
Focussing on rapid production
growth and high impact exploration
A European Focussed
Producer and Explorer
2
ASX:
ADX
Corporate Presentation | June 2026
DISCLAIMER
2
Cautionary Statement
IMPORTANT NOTICE:
This document has been prepared by ADX Energy Ltd (“ADX”) for the purpose of providing information to interested
analysts, investors and shareholders. Any statement, opinions, projections, forecasts or other materials contained in this
document do not constitute any commitments, representations or warranties by ADX or its directors, agents and employees.
Except as required by law, and only to the extent so required, directors, agents and employees of ADX shall in no way be
liable to any person or body for any loss, claim, demand, damages, costs or expenses of whatsoever nature arising in any
way out of, or in connection with, the information contained in this document. This document includes certain statements,
opinions, projections, forecasts and other material, which reflect various assumptions. The assumptions may or may not
prove to be correct. ADX recommends that potential investors consult their professional advisor(s) as investment in the
company is considered to be speculative in nature.
The information in this presentation is in summary form only and does not contain all the information necessary to fully
evaluate any transaction or investment. It should be read in conjunction with ADX’ other periodic and continuous disclosure
announcements lodged with the ASX. This document does not constitute an offer, invitation or recommendation to subscribe
for or purchase securities and does not form the basis of any contract or commitment.
Pursuant to the requirements of the ASX Listing Rule 5.41 and 5.43 the technical and Prospective Resources information
relating to Austria and Italy contained in this presentation has been reviewed by Paul Fink as part of the due diligence
process on behalf of ADX. Mr. Fink is Technical Director of ADX Energy Ltd is a qualified geophysicist with 30 years of
technical, commercial and management experience in exploration for, appraisal and development of oil and gas resources.
Mr. Fink is a member of the EAGE (European Association of Geoscientists & Engineers) and FIDIC (Federation of
Consulting Engineers). ADX confirms that it is not aware of any new information or data that may materially affect the
information included in the relevant market announcements for reserves or resources and that all material assumptions and
technical parameters underpinning the estimates in the relevant market announcements continue to apply and have not
materially changed.
Independent audit of developed reserves have been completed for ADX’ Zistersdorf and Gaiselberg fields (“Fields”) in the
Vienna basin and Anshof in Upper Austria (Austria) by RISC Advisory Pty Ltd (“RISC”). RISC conducted an independent
audit of ADX’ Fields evaluations, including production forecasts, cost estimates and project economics. Production from
existing wells is classified as Developed Producing. Production from planned recompletion of existing wells to new intervals
is classified as Developed Non-Producing. RISC is an independent advisory firm offering the highest level of technical and
commercial advice to a broad range of clients in the energy industries worldwide. RISC has offices in London, Perth,
Brisbane and South-East Asia and has completed assignments in more than 90 countries for over 500 clients and has
grown to become an international energy advisor of choice.
PRMS RESERVES CLASSIFICATIONS USED IN THIS PRESENTATION:
Developed Reserves are quantities expected to be recovered from existing wells and facilities.
Developed Producing Reserves are expected to be recovered from completion intervals that are open and producing at the
time of the estimate.
Developed Non-Producing Reserves include shut-in and behind-pipe reserves with minor costs to access.
Undeveloped Reserves are quantities expected to be recovered through future significant investments.
A. Proved Reserves (1P) are those quantities of Petroleum that by analysis of geoscience and engineering data, can be
estimated with reasonable certainty to be commercially recoverable from known reservoirs and under defined technical and
commercial conditions. If deterministic methods are used, the term “reasonable certainty” is intended to express a high degree
of confidence that the quantities will be recovered. If probabilistic methods are used, there should be at least a 90% probability
that the quantities actually recovered will be equal or exceed the estimate.
B. Probable Reserves are those additional Reserves which analysis of geoscience and engineering data indicate are less
likely to be recovered than Possible Reserves. It is equally likely that actual remaining quantities recovered will be greater than
or less than the sum of the estimated Proved plus Probable Reserves (2P). In this context, when probabilistic methods are
used, there should be at least a 50% probability that the actual quantities recovered will equal or exceed the 2P estimate.
C. Possible Reserves are those additional Reserves that analysis of geoscience and engineering data suggest are less likely
to be recoverable that Probable Reserves. The total quantities ultimately recovered from the project have a low probability to
exceed the sum of Proved plus Probable plus Possible (3P) Reserves, which is equivalent to the high-estimate scenario. When
probabilistic methods are used, there should be at least a 10% probability that the actual quantities recovered will equal or
exceed the 3P estimate. Possible Reserves that are located outside the 2P area (not upside quantities to the 2P scenario) may
exist only when the commercial and technical maturity criteria have been met (that incorporate the Possible development
scope). Standalone Possible Reserves must reference a commercial 2P project.
PROSPECTIVE RESOURCE CLASSIFICATIONS USED IN THIS PRESENTATION:
Prospective Resources are those estimated quantities of petroleum that may potentially be recovered by the application of a
future development project(s) relate to undiscovered accumulations. These estimates have both an associated risk of discovery
and a risk of development. Further explorations appraisal and evaluation is required to determine the existence of a significant
quantity of potentially moveable hydrocarbons.
P(90) Estimate or Low Estimate: means at least a 90% probability that the quantities actually recovered will equal or exceed
the estimate.
P(50) Estimate or Best Estimate: means At least a 50% probability that the quantities actually recovered will equal or exceed
the estimate.
P(10) Estimate or High Estimate: means At least a 10% probability that the quantities actually recovered will equal or exceed
the estimate.
OIL AND GAS CONVERSIONS
BOE means barrels of oil equivalent. Bcfe means billion of cubic feet of gas equivalent. Gas to oil conversion used in this
presentation: 6 Mcf of gas = 1 barrel of oil. Mcf means thousand cubic feet of gas
Corporate Presentation I 17 September 2026
Corporate Presentation I 26 October 2026
3
ASX:
ADX
Corporate Presentation | June 2026
HIGH VALUE EUROPEAN ENERGY PORTFOLIO
3
Stable production base and transformational exploration in premium energy markets *
Key Asset and Market Attributes
▪ High value hydrocarbons - Brent & CGH gas price 1
▪ Excellent access to infrastructure
▪ Seismic and well data base availability
▪ Rapid licencing in pro-development jurisdictions
▪ Increased focus on gas
Vienna Basin Oil Fields | Austria
Anshof Oil Field | Upper Austria
Upper Austria Exploration Assets
Sicily Channel Permit | Italy
Production Licence | Romania
* ADX operated production & exploration assets
1 Central European Gas Hub
Three new
applications
Corporate Presentation I 26 October 2026
“Opportunity to build production base to achieve critical mass and unlock value of high impact exploration”
4
ASX:
ADX
Corporate Presentation | June 2026
COMPANY OVERVIEW
4
Increasing production, near term reserve growth and high-impact gas exploration
EXPLORATION PORTFOLIO RESOURCES
NET to ADX MMBOE – P(MEAN)
CAUTIONARY STATEMENT:
Prospective Resources are those estimated quantities of petroleum that may potentially be recovered
by the application of a future development project(s) relate to undiscovered accumulations. These
estimates have both an associated risk of discovery and a risk of development. Further explorations
appraisal and evaluation is required to determine the existence of a significant quantity of potentially
moveable hydrocarbons.
1 30 September 2026 Quarter Ended average,
2 Unaudited Reserves on 31 December 2025
3 Prospective Resources reporting date update 3.3.2026; see slide 18
4 Prospective Resources reporting date update 2.12.2025; see slide 18
5 Reporting date on 3.3.2026; see slide 18
Austrian Current Production (Sept 26 QTR)
242 BOEPD 1
Austrian Exploration Portfolio
570 BCF Gas & 55 MMBBL Oil 3
Sicily Channel Gas Permit
619 BCF Gas 4
Multiple Farmouts
Accelerate programs & reduce risk
Operating Capability
Generate, Explore & Develop
Austrian 2(P) Reserves
1.47 MMBOE 2
Vienna Basin Fields and Anshof field
High Equity Interests
Ability to control program and transact
EXPLORATION PORTFOLIO RESOURCES
NET to ADX MMBOE – P(MEAN)
Upper Austria – Gas
95 MMBOE
Sicily Channel – Gas
103 MMBOE
Upper Austria – Oil
55 MMBBL Total – 253 MMBOE5
Portfolio - 78% Gas / 22% Oil
Approx. 1.2 TCF P(Mean) GAS 5 in portfolio
Current gas price is US$183 per BOE
23 October 2026
Corporate Presentation I 26 October 2026
5
ASX:
ADX
Corporate Presentation | June 2026
BOARD, CAPITAL STRUCTURE AND CORPORATE OVERVIEW
5
Experienced leadership team with relevant experience and local relationships for ADX European growth plan
Board & Senior Management Team
Ian Tchacos
B.Eng (Mech.) & Grad.Dip (Chem Eng)
Executive Chairman
Petroleum engineer with more than 30 years of international oil and gas experience spanning
corporate strategy, M&A, exploration, development, production operations and energy finance.
Former Managing Director of Nexus Energy, where he led its growth from a micro-cap explorer
to an ASX Top 200 producer and operator.
Paul Fink
Msc (Geophysics)
CEO & Executive Director
Petroleum industry executive and geophysicist with over 25 years of international exploration
and production experience across Europe, North Africa, Asia and Australia. Former senior
manager with OMV and Vice President of Focus Energy, where he helped deliver a major
exploration success and the IPO of Indus Gas on the London Stock Exchange.
Edouard Etienvre
MSc (Management)
Non-Executive Director
Energy and natural resources executive with over 20 years of experience across oil & gas,
mining, shipping and offshore sectors. Brings extensive expertise in commercial strategy,
business development, financing, M&A, project management and transaction structuring.
Dave Gilbert
MSc (Petroleum Geology)
Non-Executive Director
Highly experienced petroleum geologist with more than 35 years in exploration and production,
including senior roles with Petrofina, Apache and OMV. Extensive expertise in exploration
strategy, new ventures, project execution and managing international E&P operations across
Europe, North Africa and Asia-Pacific.
Alan Reingruber
MSc (Petroleum Engineering)
Managing Director,
ADX VIE GmbH
Petroleum engineer with 20 years of exploration and production experience in Austria. Former
senior executive with RAG Austria, where he managed oil assets and later led the company's
exploration and production business before joining ADX following the acquisition of RAG
assets.
Peter Ironside
Company Secretary
Chartered Accountant and corporate governance specialist with more than 40 years'
experience in the resources sector. Extensive expertise in financial management, compliance,
capital raisings and ASX-listed company administration, including involvement in several
successful corporate transactions.
Amanda Sparks
Company Secretary
Chartered Accountant and Fellow of FINSIA with over 30 years of resources industry financial
experience. Specialist in company secretarial services, financial management, capital raisings,
corporate transactions, governance and compliance for listed companies.
Corporate Overview
▪ ASX listed oil & gas exploration and production company with
European focus
▪ Board comprised of international experienced, energy specialists
▪ Corporate HQ in Perth, Australia and European operating office in
Vienna, Austria
Image | Drilling operations at Hoch-1 well
Corporate Presentation I 26 October 2026
Capital Structure
6
ASX:
ADX
Corporate Presentation | June 2026
EUROPEAN MACRO GAS FUNDAMENTALS
6
Longterm supply vulnerability, pricing volatility and Long term dependence on LNG
Russia (piped)
Russia (LNG)
Norway (LNG)
Norway (piped)
U.S.A. (LNG)
Algeria (LNG)
Algeria (piped)
Other (LNG)
U.K.
Azerbaijan
Libya
90%
of supply
is
imported
EU gas supply mix1
1 Source: Bruegel; 2 Methane, Reporting and Verification of CH4 and CO2
▪ 10% of Europe’s gas is produced domestically
▪ 33% of supply imported from Norway
▪ 46% of supply imported as LNG from USA and
Middle East
▪ Russia still makes up 12% of supply mix
High dependence on imported gas
▪ Lack of investment in domestic gas exploration and production
▪ Long term dependence on Russian gas
Supply vulnerability and gas price volatility
▪ European and Asian gas prices impacted long term by Qatar facilities destruction
Long term structural and policy trends
▪ Russian gas banned from EU by November 2027 (by legislative decree)
▪ EU methane regulation creates a structural premium for low methane intensity gas
(MRV2 compliance). Up to 43% of EU gas imports at non-compliance risk from 2027
Corporate Presentation I 26 October 2026
European (TTF) Gas Price - EUR per MWh- One Month Forward Contract
94.69 EUR per MWh
7
ASX:
ADX
Corporate Presentation | June 2026
RECENT ACTIVITIES
Welchau appraisal - light oil test and a 3.5 fold increase in prospective gas resources
▪ Updip Light Oil Accumulation confirmed by oil and gas recovered at surface
▪ New mapping identifies - 18 MMBBL Pmean 1,2 up dip oil and down dip gas condensate appraisal of
387 BCF Pmean 1,2
▪ Well Deepening (approx. 700m) can access down dip gas play
7
Welchau-1 test, Upgrade Sicily Channel Resources, HOCH-1 shallow gas discovery and Production Increase
Sicily Channel gas resources increase (31%) supported by Independent Review
▪ Updated resource estimates incorporating all available data 619 BCF Pmean 1,3
▪ Independent review confirms resource estimates, further upside and play potential
▪ Three new permit applications in extensive gas play
HOCH-1 shallow gas well encountered multiple gas zones
▪ 8 gas sands encountered in well - 4 zones tested confirming gas
▪ Commingled gas flow 3.1 MMSCFPD at approx. 550 BOEPD oil equivalent
▪ Further testing of deeper gas zone scheduled in November 2026
Welchau -1 Up dip oil testing operations
HOCH -1 zone -1 gas testing operations
1Refer to Cautionary Statement in slide 4 of presentation
2Prospective Resources reporting update 3.3.2026; see slide 18
3Prospective Resources reporting update 2.12.2025; see slide 18
4 30 September 2026 Quarter Ended Average Rate
Austrian production increase by 24% to 246 BOEPD 4
▪ 45 BOEPD increase in Vienna Basin Field production
▪ Further well work commencing on 27 October 2026 is expected to deliver additional 100 BOEPD
Corporate Presentation I 26 October 2026
8
ASX:
ADX
Corporate Presentation | June 2026
ASSET DEVELOPMENT ACTIVITIES IN 2026 / 27
8
Focus on production growth, low risk gas reserves development and high impact exploration
5.3 MMBBLS Reserves growth
and 1550 BOEPD Production
growth
Gas well drilling
in Permit
619 BCF 3
Up dip Oil Appraisal
18 MMBBL 1,2
Austrian near term production enhancement
Welchau gas appraisal – Upper Austria
Sicily Channel gas exploration trend
▪ Vienna Basin Fields behind pipe and well work program
▪ Commences 27 October 2026
Increase existing oil and gas production
by approx. 100 BOEPD to 350 BOEPD
Refer ASX Release 6 October 2026
1 Refer1C1 Cautionary Statement in slide 4 of presentation 2 P(MEAN) Prospective Resources - reporting date on 3.3.2026 – refer slide 18 3 P(MEAN) Prospective Resources - reporting date on 2.12.2025 – refer slide 18
Upper Austria shallow gas & near field oil
▪ Drill low risk gas program – HOCH-1 , GOLD and SHOE
▪ HOCH-1 tested gas at 3.1 MMCFPD equiv. to 550 BOEPD
▪ Deeper zone testing December 2026
▪ GOLD-1 scheduled for December 2026, Site Construction Commenced
▪ Pergen Near field Oil Prospect targeting Q3 2027 (subject to farmout)
(1,000 BOEPD potential)
▪ Well Deepening to reach gas target updip of Molln-1 discovery
▪ WELL-1 drilling scheduled to commence in Q4 2027
Reach gas duplex 600 to 700 m below well TD
Resource potential 387 BCF + 14 MMBBL 1,2
P(mean)
▪ Mature existing gas prospects for drilling with 3D seismic
▪ Continue to build acreage position in gas play
▪ Confirmation of licence applications in December 2026
619 BCF P(mean) 1,3 prospective resources
Three additional gas permit applications
Additional oil potential in Nilde Oil Field
Shallow gas forecast production
Key Targets
Corporate Presentation I 26 October 2026
9
ASX:
ADX
Corporate Presentation | June 2026
ESTABLISHED PRODUCTION BASE IN AUSTRIA
9
Low-decline operated assets with development upside and infrastructure capacity
70% Economic Interest
Anshof Oil Field
Current rate – approx. 100 BOPD GROSS
100% Economic Interest
Vienna Basin Fields
Current rate – approx. 175 BOEPD GROSS
High value, low
royalty production
with development
upside
1.57 mmbbl
2P developed
reserves 1
Land ownership, oil
piped to Vienna
refinery & access to
gas network
High value oil
from high quality
sandstone
reservoirs
3,000 bpd facility
and multiple near
field appraisal and
exploration targets
Oil transported
via truck and rail
to Vienna
refinery
1 Reserves Reporting Date & Valuation (Independently Audited) 04.11.2021 less production to 31 December 2024
Well work program in
Q4 2026 is expected
to deliver 100 BOEPD
Corporate Presentation I 26 October 2026
10
ASX:
ADX
Corporate Presentation | June 2026
AUSTRIA NEAR TERM WORK PROGRAM
10
Vienna Basin field production growth, shallow gas commercialisation and near field oil exploration
01
HOCH-1 Gas Discovery
02
GOLD-1
03 04
Vienna Basin Fields PERGEN-1
Near term
Operational
Sequence
Near term program to mid 2027
▪ Vienna basin focus on production enhancement from
three existing wells commencing 27 October 2026
▪ HOCH-1 testing and GOLD- 1 shallow gas prospects
drilling to follow;
• Testing of HOCH-1 to establish commerciality
• GOLD-1 a low-risk prospect 300m from pipeline,
partially farmout funded and further farmouts likely
▪ PERGEN-1 near field oil prospect has been matured
for drilling. Permitting and land acquisition has
commenced.
• Timing of drilling will be subject to ongoing
farmout discussions.
1Refer to Cautionary Statement in slide 4; 2 Prospective Resources reporting update 3.3.2026; see slide 18; 3 Estimate includes oil and solution gas; 4 Refer ASX announcement 14 September 2026 – partner to earn 10% by funding 20%
Austrian Production and Exploration Portfolio
2
3
4
Anshof Oil Field
1
Shallow gas well 8.3 BCF
P(mean) 1,2 at 90%4
economic interest
Phase 2 Production
testing at 50% economic
interest
Production enhancement
program 100 BOEPD at
100% economic interest
Near-field oil prospect
6.5 MMBBLs P(mean) 1,2,3
at 100% economic interest
Corporate Presentation I 26 October 2026
11
ASX:
ADX
Corporate Presentation | June 2026
HOCH-1 SHALLOW GAS DISCOVERY TESTING
11
Further testing planned to determine commerciality of discovery (50% economic interest)
1Refer to Cautionary Statement in slide 4; 2 Prospective Resources reporting update 3.3.2026; see slide 18;
01
▪ Phase 2 program will test
the largest net-pay & best
porosity reservoir in well
(ZONE #6)
▪ Nearby gas wells,
producing fields and
newly processed 3D
PSDM indicate the largest
resources upside
potential which is in line
with pre-drill assessment
resources.
73 km2
GOLD-01
▪ 8 bcf Mean pre – drill resources
estimate 1, 2
▪ 3.1 MMSCF/D (550 BOEPD)
commingled rate tested from 4
zones (refer ASX release 28
August 2026)
▪ Phase 2 production testing is
scheduled for mid December 2026
NEW 3D PSDM SEISMIC – provides further insights on sand distribution
02
Corporate Presentation I 26 October 2026
12
ASX:
ADX
Corporate Presentation | June 2026
UPPER AUSTRIA NEAR TERM DRILLING PROSPECTS
12
GOLD-1 Shallow Gas Prospect and PERG-1 Near Field Oil Prospect
1Refer to Cautionary Statement in slide 4; 2 Prospective Resources reporting update 3.3.2026; see slide 18; 3 Estimate includes oil and solution gas
PERG-01
GOLD-01
73 km2
GOLD-01
GOLD-1 Well
▪ Low risk gas prospect with well
defined seismic amplitudes
diagnostic of gas
▪ Seismic calibrated to nearby
gas wells
▪ Well site construction has
commenced
▪ Well located approx. 300m
from pipeline enabling low cost
and rapid tie in
PERG-1 Well
▪ Near-field oil prospect adjacent to
Anshof field (3000 BPD facility)
▪ Shallow, Low Cost Well approx.
EUR 3.2 million
▪ Rapid Commercialisation and
robust economics due to
infrastructure availability
▪ Early Production possible from
long term production testing
▪ 6.5 MMBBLs P(mean) 1,2,3
at 100% economic interest
Stacked Pay with nearby
oil field analogues
Corporate Presentation I 26 October 2026
8.3 BCF P(mean) 1,2
at 90%4 economic
interest
PERG-1 seismic section showing well path
13
ASX:
ADX
Corporate Presentation | June 2026
WELCHAU-1 GAS APPRAISAL ASSET – UPPER AUSTRIA
13
Light oil discovery confirmed and large deeper gas-condensate target is not tested
1Refer to Cautionary Statement in slide 4 of presentation, 2Prospective Resources reporting date update 3.3.2026 – refer slide page 18
3 Prospective Resources reporting date update 4.2.2026
Light Oil Accumulation
1. 450 m of gas shows & light oil tested
2. 18 MMBBL P(mean)1,3 prospective
resources
Gas Condensate Remaining Target
1. Original target remains undrilled
approx. 700m below Welchau-1 well TD
2. Gas target in pressure communication
with Molln-1
3. 387 BCF + 14 MMBBL 1,2 P(mean)
Duplex 1 and 2 prospective resources
Welchau Anticline is an interconnected petroleum system - Pressure and structural data
demonstrate pressure continuity between Welchau-1 and downdip Molln-1 discovery
Gas discovery well drilled in
1989 and tested 4 mmscfpd
WELCHAU-1 deepening
to test gas in Q4 2027
Corporate Presentation I 26 October 2026
14
ASX:
ADX
Corporate Presentation | June 2026
SICILY CHANNEL GAS PLAY - C.R 150.AU PERMIT AND THREE APPLICATIONS
14
High impact gas resource potential in an emerging gas province with running room
RecentADX Permit
August 2025
ENI Gas Project
August 2024
and new applications
▪ An emerging and newly producing offshore gas
province
▪ Shallow water (<100 m), drill depths (700-1600 m)
▪ Gas shows in wells and good quality legacy 2D
seismic
▪ Proximity to tie in point onshore at Mazara (less
than 50 km from permit)
▪ Stacked pay and productive sands
▪ Sweet biogenic gas (99% methane)
▪ Favourable fiscal terms with 10% royalty and
28% corporate tax
▪ Applications for three additional gas permits
approx.,1650 km2 in highly prospective gas play
619 BCF P(mean)
prospective resources1,2
from 9 high-graded prospects in the permit
using historic data and new field data *
1 Refer to Cautionary Statement: see slide 4 2Prospective Resources reporting update 2.12.2025 – refer slide page 18
* Independent Review confirms play and ADX
resources estimates
Highly prospective permit for gas proven by
historic data from deeper oil exploration
Sicily Channel ADX’ C.R 150.AU Permit plus three additional applications
Applications process will take 3 months - approximately 1650 km2
ADX Existing Permit
ADX New Applications
Corporate Presentation I 26 October 2026
15
ASX:
ADX
Corporate Presentation | June 2026
STRATEGIC IMPORTANCE OF OFFSHORE SICILY
The Sicily Channel is the best
near-term option for getting Med
gas into Europe
▪ Direct pipeline route available to
European markets via the
TransMed pipeline
▪ Direct open access to Italian
pipeline system owned by SNAM
at Mazara del Vallo
▪ Stable politics, shallow water and
clean biogenic gas (99% methane)
▪ The Eastern Med is the most
proven gas play BUT currently
relies on LNG to access European
markets
▪ Big push from super majors in
deep water frontier areas -
Offshore Greece and Malta
▪ New areas require long
development cycle and pipeline
infrastructure
15
The Mediterranean Sea has become the new gateway for gas into Europe
ADX existing
permit plus three
new applications
TransMed
pipeline
Corporate Presentation I 26 October 2026
16
ASX:
ADX
Corporate Presentation | June 2026
LARGE-SCALE GAS FAIRWAY WITH EXPANSION POTENTIAL
16
Extensive technical dataset underpins resource growth and future acreage opportunities
A biogenic gas play fairway identified from extensive data and
past ADX experience
Map shows distribution of the Pliocene-Quaternary (yellow) and
Tortonian-Messinian siliciclastic (orange) foredeeps
▪ The Lippone-Mazara gas field (ENI 100%) and strong gas
shows from the Tortonian - Terravecchia Fm. sandstone
reservoirs in historical wells confirm the NE-SW play fairway
▪ Opportunity to apply for other exploration areas in water depth
of less than 100m
▪ ADX has extensive knowledge of the play from exploration in
nearby Tunisian acreage including 3D seismic and drilling
OWC 1600 m TVDSS
View from South-East
80 meter oil column
110 meter oil column
Undrained Pool
15 mmbo (2C)
Partly Drained Pool (21 mmbo)
13 mmbo (2C) remaining
5 km
Nilde Oil Field – remaining oil potential
Nilde Oil Field Potential - historic oil field in C.R.150.AU licence
▪ The Italian Ministry of Environment and Energy Security (MASE) with its
Hydrocarbon and Georesources department (UNMIG) published a note
regarding the Nilde oil fields potential as a CO2 storage project
▪ In conjunction with a Carbon Capture Storage project, the remaining Nilde oil
could potentially be recovered
C.R 150.AU
ADX historic acreage in Tunisia
Nilde oil field
New Legislation allowing
oil development being
proposed by PM Meloni
Corporate Presentation I 26 October 2026
17
ASX:
ADX
Corporate Presentation | June 2026
NEAR TERM NEWS FLOW
17
3 Refer to Cautionary Statement; see slide 4
Operational and permitting activities in the coming months
Vienna Basin well work program
Targeting 100 BOEPD
additional production
Nov / Dec 2026
HOCH-1 Phase II well testing
Determine potential
well commerciality
December 2026
GOLD-1 shallow gas well
Sicily Channel permit applications
Low risk, rapid gas
tie in potential
Dec 26 / Jan 27
1650 km2 position in
prospective gas play
Dec 26 / Jan 27
RIGHT OF PAGE: MB well services rig contracted for the ADX’ Vienna Basin well work
program and HOCH-1 Phase 2 testing program. (Source: MB Well Services GmbH)
Commencing Operations 27 October 2026
Corporate Presentation I 26 October 2026
18
ASX:
ADX
Corporate Presentation | June 2026
RESOURCE TABLES
18
Low Best Mean High
P(90) P(50) P(Mean) P(10) ADX equity
(BCF) (BCF) (BCF) (BCF) interest
Upper Miocene 1 22 60 77 158 100%
Biogenic Gas 2 26 64 80 160 100%
3 46 111 136 267 100%
4 17 41 51 101 100%
5 25 60 74 146 100%
Sub-total 136 336 418 832
Upper Miocene 6 18 43 52 102 100%
Biogenic Gas 7 15 37 46 90 100%
9 19 68 103 241 100%
Sub-total 52 148 201 433
188 484 619 1265
2
Prospective Resources reporting date update 30.8.2022
3
"DHI" means direct hydrocarbon indication from seismic
Prospects / Leads included in previous reporting date 2
Additional Prospects / Leads not previously reported
TOTAL (BCF) Arithmetic Sum
1
Prospective Resource Estimates are unrisked recoverable. They have been estimated using probabilistic
methodology in accordance with SPE-PRMS (2018). All totals are aggregated arithmetically.
ADX Sicily Channel Prospective Resources Estimates 1
C.R 150.AU Permit
ASX Reporting Date: 2 December 2025
Play Type
Prospect/
Lead
3 Refer to Cautionary Statement; see slide 4
UPPER AUSTRIA PROSPECT INVENTORY including Welchau 3
(last reporting date 3 March 2026)
Sicily channel PROSPECT INVENTORY 3
(last reporting date 2 December 2025)
Low
P90
Best
P50
Mean
(Pmean)
High
P10
Low
P90
Best
P50
Mean
(Pmean)
High
P10
GOLD 4.1 7.5 8.3 13.4 - - - - 100 ADX-AT-II
ZAUN 1.5 2.7 3.0 4.8 - - - - 100 ADX-AT-II
GRAB 1.2 1.9 2.0 2.9 - - - - 100 ADX-AT-II
HOCH 1.5 5.2 8.0 17.3 - - - - 50 ADX-AT-I
SCHOE 1.9 5.4 6.3 12.1 - - - - 50 ADX-AT-I
PICH 2.2 5.1 5.4 9.0 - - - - 100 ADX-AT-II
STEY 1.2 2.4 2.7 4.6 - - - - 100 ADX-AT-II
HASE 2.0 3.1 3.4 5.0 - - - - 100 ADX-AT-I
Sub-total 15.6 33.3 39.1 69.1 - - - -
SGB 0.1 0.3 0.3 0.8 0.3 0.9 1.3 2.7 100 ADX-AT-II
TERN 0.3 0.8 1.3 2.8 0.6 1.9 2.9 6.1 100 ADX-AT-II
WOLF 0.2 0.7 0.9 1.8 0.5 1.6 2.1 4.1 100 ADX-AT-II
PERG 0.2 0.7 0.8 1.8 0.5 1.9 2.4 4.8 100 ADX-AT-II
GRB - - - - 1.0 2.8 4.0 8.1 100 ADX-AT-II
LIND 0.1 0.3 0.6 1.3 0.2 0.5 0.9 2.0 100 ADX-AT-II
WIND 0.1 0.2 0.4 0.7 0.2 0.6 0.8 1.7 100 ADX-AT-II
Sub-total 1.0 3.1 4.3 9.3 3.3 10.2 14.3 29.4
ROS - - - - 2.5 11.0 19.6 49.4 75 ADX-AT-II
WEL UPDIP - - - - 3.6 11.7 17.7 38.6 75 ADX-AT-II
WEL DOWNDIP 56.2 230.2 387.4 956.7 1.4 8.1 13.6 38.3 75 ADX-AT-II
Sub-total 56.2 230.2 387.4 956.7 7.5 30.8 50.9 126.3
ZAM 11.0 49.0 93.0 216.0 - - - - 100 ADX-AT-I
OHO 34.0 89.8 114.3 224.3 - - - - 100 ADX-AT-I
IRR 9.0 25.8 35.3 74.4 - - - - 50 ADX-AT-I
GMU 2.8 7.1 9.2 17.7 0.4 1.3 1.8 3.8 100 ADX-AT-I
Sub-total 56.8 171.7 251.8 532.4 0.4 1.3 1.8 3.8
BRUNN 1.3 3.4 4.2 8.0 - - - - 50 ADX-AT-I
ARD 1.6 5.6 6.7 13.5 0.3 0.7 0.9 1.7 50 ADX-AT-I
BUCH 2.2 6.4 7.6 14.4 - - - - 50 ADX-AT-I
Sub-total 5.1 15.4 18.5 35.9 0.3 0.7 0.9 1.7
TOTAL (Austria)
Arithmetic Summation 134.7 453.7 701.1 1603.4 11.4 43.0 67.9 161.2
ADX NET (Austria)
Arithmetic Summation 111.9 370.2 570.2 1294.3 9.4 34.9
Share your feedback