Quarterly Activities Report - June 2026
Released
Released
Announcement PDF
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
__________________________________________________________________________________________________________
ADX Energy Ltd | ABN 50 009 058 646
Registered and Principal Office Australia: Level 1, 168 Stirling Highway, Nedlands 6009, Western Australia
Telephone: +61 8 9381 4266 | admin@adxenergy.com.au | www.adxenergy.com.au Page | 1
31 July 2026
Activities Report
For the Quarter Ended 30 June 2026
ADX Energy Ltd (ASX: ADX, “ADX” or the “Company”) is pleased to provide an update on its activities
for the quarter ended 30 June 2026.
SUMMARY OF RESULTS
Current Quarter Previous Quarter % age Change
Average Net Production Rate (BOEPD) 197 1 200 -2 %
Average Oil Price Brent (US$/bbl) US$ 104.52 US$ 80.61 +30%
Average Gas Price (EUR/MWh) EUR 48.7 EUR 33.1 +47%
Sales Revenue (cash received) A$ 3.6 million A$ 2.1 million +71%
Cash Unrestricted A$ 2.2 million 2 A$ 4.9 million -55%
1 Production rate at time of report issue is 270 BOEPD. 2 Excludes restricted funds for bonds and guarantees of A$ 1.2 million.
Quarter Highlights
REPORTED EVENTS AND HIGHLIGHTS Reporting Date
AUSTRIA
HOCH – 1 Shallow Gas Discovery Logging Results – Multiple Gas Zones Intersected 8 May 2026
HOCH – 1 Testing of Zone 1 produced at 2.7 MMSCFPD (450 Barrel/day equivalent) 18 June 2026
Mature multiple gas prospects and Anshof near field oil prospects for drilling (PERG) N/A
Complete Pre stacked Depth Migration (PSDM) to derisk and map large gas prospects N/A
Farmout process for GOLD-1 well and PERG-1 well (both held at 100% interest by ADX) N/A
Vienna Basin Fields workovers program N/A
Vienna Basin Fields infill well program definition (2 well program targeting 2027 drilling) N/A
SICILY CHANNEL PERMIT
Seismic data purchase and supported RISC Advisory Pty Ltd independent review N/A
Subsequent Events
EVENTS POST REPORTING DATE Reporting Date
RISC Advisory Pty Ltd independent review confirms gas play and supports Sicily Channel
resource estimates methodology 619 BCF P(mean) Prospective Resource Estimates 3,4 6 July 2026
Vienna Basin behind pipe perforations increases Austrian Production 35% to 285 barrels per day 9 July 2026
A$3.58 million placement to new and existing sophisticated investors 22 July 2026
3 Refer to Prospect Inventory in Appendix I of this report.
4 Cautionary Statement: Prospective Resources are those estimated quantities of petroleum that may potentially be
recovered by the application of a future development project(s) relate to undiscovered accumulations. These estimates have
both a risk of discovery and a risk of development. Further exploration appraisal and evaluation is required to determine the
existence of a significant quantity of potentially recoverable hydrocarbons.
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Page | 2
Next Quarter Activities
Austria
Ongoing well workovers to increase Vienna Basin Field production.
HOCH-1 well discovery multi-zone gas testing.
Ongoing farmout program for GOLD-1 well and PERG-1 well (both held at 100% interest by ADX).
Well site construction and preparation for drilling GOLD and SCHOE shallow gas prospects.
Permitting for PERG-1 nearfield oil prospect.
Ongoing technical work supporting the deepening of Welchau-1 to target gas condensate updip of Molln-1
well.
De-risk and map large Upper Austria Jurassic gas prospects on new pre-stack depth migration (PSDM) data
set.
Sicily Channel
Process seismic data set purchased from ENI.
Update prospect inventory including existing prospects and potential new prospects incorporating new
processed seismic data.
Corporate
Ongoing preparation for dual listing on Oslo Børs’ Euronext Growth market to improve liquidity and broaden
shareholder base.
Testing of Zone 1 at the HOCH-1 shallow gas discovery well in Upper Austria. HOCH-1 is the first of three
shallow gas wells planned for 2026
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Page | 3
ADX Executive Chairman, Mr Ian Tchacos, said “The Board of ADX is very pleased to report significant
progress achieved during the quarter. The HOCH-1 gas discovery is an important milestone being the
first well in our planned program of three shallow gas wells. The combination of HOCH, GOLD and
SCHOE are potentially capable of delivering approximately 1000 barrels of oil equivalent net to ADX.
The first gas sand tested at HOCH-1 produced at a rate of 2.7 million standard cubic feet per day (or
450 barrels per day oil equivalent). Further testing of up to 5 additional zones will be undertaken during
the coming quarter.
Production from multiple zones at HOCH could result in well productivity in the range of 5 to 6 million
standard cubic feet per day (or 800 to 1000 barrels per day oil equivalent). That would be represent
approximately a 150% increase in production rate and revenue for ADX at our 50% economic interest.
With European gas prices currently ranging from US$100 to US$120 per barrel of oil equivalent, the
resultant economic benefit for ADX is expected to be substantial.
Following the testing at HOCH-1, the next target in the drive towards cash flow independence and
increased corporate relevance is the drilling of the GOLD-1 shallow gas well, scheduled for early in the
fourth quarter. This will be followed by drilling at the SCHOE-1 gas well.
To reduce the financial burden of drilling GOLD-1 at a 100% interest, ADX has commenced a farmout
process and has attracted strong interest from multiple companies. The company anticipates
completing a farmin transaction in the coming quarter to facilitate co-funding of the GOLD well.
While the focus in 2026 has been on the low-risk, shallow gas play, there are additional exciting
opportunities to leverage existing infrastructure and resource potential at both our Vienna Basin fields
and Anshof to quickly boost production and profitability. Our Vienna Basin fields offer low-risk infill
drilling as well as very attractive appraisal drilling targets. We have high-graded two wells which are
drill-ready for 2027. These wells are especially compelling due to negligible royalties, immediate low-
cost tie-in, the availability of existing processing capacity, low incremental operating costs, and Brent-
equivalent oil pricing.
In close proximity to the producing Anshof field, several appraisal and exploration targets have been
identified that could be rapidly connected to the 3,000 barrel per day processing facility at Anshof. Of
particular interest is the large PERG oil prospect, which is now technically mature and in the permitting
phase for drilling in early 2027. ADX holds a 100% interest in PERG. Given its significant resource
potential (over 7 million barrels of oil equivalent) and low drilling costs, it is attracting considerable
attention from potential farminees. ADX aims to secure a farmout in 2026 and commence drilling early
in 2027.
The combination of Vienna Basin development drilling and Anshof near-field exploration drilling has
the potential to deliver a substantial increase in production and cash flow for ADX.
With a focus on boosting cash flow, ADX increased Austrian production by 35% in July, reaching 285
barrels of oil equivalent per day. This was achieved through behind pipe perforations on two wells in
the Vienna Basin fields. This increase in production, together with strong prevailing oil and gas prices,
is expected to significantly increase sales revenue in the coming quarter.
While near-term efforts are concentrated on increasing production and cash flow, ADX has also
continued to advance technical work on Welchau, with intentions to deepen the well in 2027 to
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Page | 4
evaluate the deeper, as-yet-untested gas potential encountered in the historic Molln-1 well. Our Italy
team led by CEO Paul Fink continues to make strong progress on our Sicily Channel Permit.
An independent review by RISC Advisory Pty Ltd has provided important third party confirmation of the
potential of the Sicily Channel’s biogenic gas play, as well as an endorsement of ADX’s resource
estimation methodology. The recent acquisition of additional seismic and well data from ENI will allow
us to better define existing prospects and the identify new opportunities within the permit. The Sicily
Channel is a strategically significant gas play, ideally located for supplying gas from the Mediterranean
directly to European markets via the Transmed pipeline. Our permit is situated in shallow water near
to shore and adjacent to the pipeline.
The Energy thematic in Europe could not be better given the current energy pricing as well as the
forecast demand situation for gas in Tier 1 jurisdictions such as Austria and Italy. We are actively
pursuing the necessary capital, including equity from supportive shareholders and additional farmouts,
to deliver on its near-term strategy of multiplying production growth while advancing high-impact
projects at Welchau and in the Sicily Channel.
We look forward to providing further updates on increased cash flow from existing operations, results
from the ongoing HOCH-1 testing program, details regarding expected farmout funding and our
preparations for further shallow gas drilling at GOLD and SCHOE during the coming quarter.”
OPERATIONS REPORT
Production Activities
Production Operations
Austrian oil equivalent volume of oil and gas delivered for sale during the quarter decreased by 2%. A
program of well work recommenced during the quarter to restore production from the Vienna Basin
field wells. Perforation of behind pipe reserves in two Vienna Basin producing wells after quarter end
has resulted in a 35% increase in Austrian production rate.
ZISTERSDORF AND GAISELBERG PRODUCTION ASSETS – Vienna Basin, Austria
ADX is operator and holds a 100% interest in the production
ANSHOF OIL DISCOVERY – ADX-AT-II licence, Upper Austria
ADX is operator and holds a 70% economic interest in Anshof-3 production and a 60%
economic interest in Anshof-2A production
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Page | 5
Oil and gas production at the Vienna Basin fields averaged 138 BOEPD during the June quarter
compared to 136 BOEPD in the previous quarter. The Anshof-3 and Anshof-2A wells contributed 58
BOPD of net sales during the quarter compared to 64 BOPD during the previous quarter. Anshof
production was down due to scheduled down time for facilities replacement work. The total net sales
during the quarter including the Anshof oil field and the Vienna Basin fields averaged 197 BOEPD.
Well Work Over Program and Behind Pipe Perforations
An ongoing workover program in the Vienna Basin fields focused on necessary repair work and
interventions on production wells during the quarter ending June 2026 as well as the month of July.
These jobs consisted of two (2) subsurface interventions and two (2) equipment changes. At the
beginning of July new reservoirs were successfully perforated in two (2) production wells (GA-10A and
GA-93) to access behind pipe volumes, providing additional production of 24 BOPD oil and 52 BOEPD
(gas) respectively. The current workover program improves production and strengthens profitability
of the Vienna Basin fields. Workover activities will pause at the end of July and are expected to resume
in mid-October.
Production histogram showing ADX net Austrian barrels of oil and gas (oil equivalent) production during the
current quarter and the previous quarter
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Page | 6
Field Revenues and Product Pricing
Brent referenced oil pricing increased by 30% during the June quarter, averaging US$ 104.52 per
barrel. Gas prices averaged EUR 48.68 per MWh (equivalent to US$ 16.3 per MMBTU) for the quarter.
Oil and gas sales revenue histogram showing the impact of production and oil and gas price on revenue
Table 2 below shows a breakdown of sales revenues. Revenues increased to EUR 1,496,143 for the
June quarter compared to EUR 1,165,888 in the previous quarter due to an increase in oil and gas
pricing. Increased production as well as higher gas pricing is expected to further improve sales
revenues during the September 2026 quarter.
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Page | 7
Hedging
There were no hedging contracts in place during the quarter. ADX continues to monitor market
conditions for further hedging during 2026.
Infill Well Drilling Program Definition and Planning
During the quarter ending June 2026 an infill drilling and appraisal program was further defined for
the Vienna Basin Oil and Gas Fields with a view to a potential drilling program during 2027. The
program comprises a production well (GA-96) and an appraisal well (RAG-57). The wells are
economically attractive due to minimal royalties, availability of existing processing capacity, low
incremental operating costs and Brent equivalent oil pricing.
Vienna Basin fields production permits and in fill well locations
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Page | 8
The GA-96 development well (TD 2,300 m MD) targets Sarmatian and Badenian reservoirs expected to
yield 240,000 bbls of crude oil under the base case scenario. This well can be drilled from an existing
well pad and quickly tied into the existing infrastructure, resulting in very low tie-in costs and rapid
commencement of production.
3D Seismic cross section along GA-96 development well location
The RAG-57 appraisal well (TD 1,800 m MD) targets several Sarmatian reservoirs expected to yield
910,000 bbls of crude oil under the base case scenario. The well is proximal to existing oil field
infrastructure enabling fast track pipeline tie-in, which significantly improves project economics.
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Page | 9
3D Seismic cross section along RAG-57 appraisal well location
The wells provide the opportunity for a significant increase to developed reserves, field production
rate and profitability.
Appraisal & Development Activities
ADX is operator and holds a 70% economic interest in the Anshof Field Area including the Anshof-3
production well as well as all associated production infrastructure*. ADX holds a 60% economic
interest in Anshof-2A well*. ADX is operator of the ADX-AT-II exploration licence and holds a 100%
interest in the licence other than the Anshof Field Area, Anshof-2A well and the Welchau Investment
Area.
*MND retains the remaining 30% economic interest in the Anshof Field Area, a 30% economic interest
in the Anshof-3 well and a 40% economic interest in Anshof-2A well.
Anshof Field Production
The total Anshof field production of 8,470 barrels during the June quarter is down 2.6% compared to
the 8,699 barrels produced during the previous quarter. On a well basis Anshof-3 production was down
by 18.4% compared to the previous quarter. This was offset by a 10% increase in production from
Anshof-2A.
By the end of the quarter the field production was at 107.6 BOPD. Anshof-3 was producing 36.1 BOPD,
with a total liquid production of 49.7 BPD and a water cut of 27.3% and Anshof-2A was producing 71.1
BOPD, with a total liquid production of 130.2 BPD and a water cut of 45.4%. Field water cut remained
stable during the quarter.
ANSHOF EOCENE OIL PROJECT – Anshof Field Area, ADX-AT-II Licence, Upper Austria
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Page | 10
The Anshof-3 well and the Anshof-2A well had production uptimes of 92.6% and 89% respectively for
the quarter. Both wells were shut-in for a period during the quarter to conduct planned facility
maintenance, the change out of the leased combined heat and power unit to a permanent one and
the acquisition of reservoir pressure build-up data during the quarter. A new air cooler unit was also
installed to ensure compliance with EU Regulation 2024/1787 and eliminate gas emissions.
Sales volume was down by 7.6% and sales revenue was up by 17.6% compared to the previous quarter.
Figure showing the Anshof Oil Field outline, with an interpreted oil-water-contact at 1593 m TVDSS,
appraised to date and areas of greater Eocene reservoir thickness with the bottom hole location of the
Anshof-3 discovery well, the Anshof-2A sidetrack well and the Anshof-2 well
Anshof Reservoir Management
During the quarter, the production rates for each of the wells continued to be optimised to support
reservoir management objectives, ensuring that the bottom hole flowing pressure for both wells
remains above the bubble point pressure for the oil i.e. the pressure threshold below which gas begins
to come out of solution from the oil in the reservoir. The wells continue to perform very well.
Anshof Permanent Production Facility
The permanent production facility (Permanent Production Facility - PPF) has the capacity to process
oil from multiple wells with production capacity of approximately 3,000 BPD. It is mostly unmanned
and operates 24 hours per day with wireless data transmission.
Oil production from the PPF is trucked to a nearby train loading facility and associated gas is used for
power generation and process heat.
ANS-3
Discovery
Oil Producer
ANS-2A
Appraisal
Oil Producer
ANS-2
Interpreted OWC
1593mTVDSS
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Page | 11
Photograph showing the Anshof-3 well (left side, photo) and the Anshof-2A well (right side, photo)
producing into the Anshof PPF
The facility continues to perform very well with production from the Anshof-3 and Anshof-2A wells. It
is envisaged that the PPF will process further production from planned near-field appraisal and
exploration programs such as the planned PERG-1 well in the ADX-AT-II permit. The facility can also
potentially process crude oil from future discoveries within ADX’ Upper Austria exploration licences.
Exploration Activities – Upper Austria
ADX is operator and holds the following interests in Upper Austria:
• ADX-AT-I: ADX holds a 100% interest in the ADX-AT-I exploration licence, except as follows:
• ADX’ interest in part of this licence, the MND Investment Area, is 50% after the completion of
MND’s investment obligations under the energy investment agreement relating to the MND
Investment Area with the funding of the LICHT-1 well.
• ADX-AT-II: ADX holds a 100% interest in the ADX-AT-II exploration licence, except as follows:
o ADX holds a 75% interest in the Welchau Area; and
o ADX holds a 70% economic interest in Anshof Field Area other than the Anshof-2A well in
which ADX holds a 60% interest. (Refer ASX Release dated 4th
June 2025)
ADX-AT-I & II Licence Areas – Summary of Q2 2026 Exploration Activities
The Upper Austrian exploration and production licence area map shown below highlights the second
to the fourth quarter (Q2-Q4) exploration and appraisal actual and planned operations activities,
including 2026 shallow gas exploration drilling program and the Pergen, Anshof near field exploration
well which is likely to be drilled in Q1 2027.
Upper Austria AGS Licences – Austria
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Page | 12
1. ADX-AT-I Licence Area Activities
• The HOCH-1 first shallow gas drilling and logging was successfully completed and prepared for
testing on 15th
May 2026.
• Eight (8) potential gas sandstone reservoirs were intersected in the HOCH-1 well in the Hall
formation. Gas shows were reported based on mudlogging and supported by electric line
logging results (petrophysics). An initial flow test of one gas sand reservoir was successfully
completed during the last week of June flowing at a gas rate of 2.7 million cubic feet per day
(equivalent to 450 boepd). A long term pressure build up has been recorded with down hole
gauges to determine reservoir transmissibility and resource potential.
• Three (3) additional zones will be tested in the coming quarter following mobilisation of a
perforating unit with the testing of at least two (2) deeper zones utilising a workover rig to
access the deeper zones and isolate the shallower tested zones. The expected commencement
of further testing and pressure analysis is now expected during August.
• The drilling of the SCHOEN prospect is planned after the drilling of the GOLD-1 well in ADX-AT-
II (HOCH, GOLD and SCHOEN wells are part of the 2026 Shallow Gas Program).
• A 3D Seismic Pre-Stack Depth Migration (PSDM) project was largely completed in Q2. Detailed
geological and geophysical work has commenced to de-risk and map the large southern gas
prospects (Appendix I – Prospective Resources), with the potential to identify new prospects in
the 100 BCF plus resource range. This work is expected to be completed in Q4 2026.
• Finally, the resource and risk assessments of additional new shallow gas prospects held at
100% equity interest have been finalised including FUCHS, SAND, EHREN prospects. In addition,
the resources of the BUCH (Lower Puchkirchen Formation) gas prospect in the northern part of
the ADX-AT-I licence have been reassessed and are expected to be announced in Q3 2026.
2. ADX-AT-II licence Area Activities:
• The Welchau-1 drilling site was partially recultivated during the quarter in accordance with the
applicable nature conservation approval and the findings of the Upper Austrian Mining
Authority. The borehole and the well site is being preserved for potential future drilling or
testing. Pressure build-up and inflow monitoring is ongoing at the site (refer to the Welchau
section of this report).
• During the quarter, seismic reprocessing was carried out to better delineate the Welchau Deep
drill targets.
• A farmout process has been commenced in relation to the GOLD cluster shallow gas prospects
(GOLD, GRAB and ZAUN) in which ADX holds a 100% economic interest. Several companies are
undertaking a technical and economic review of the prospects. Commercial offers to fund the
GOLD prospect are expected during Q3 2026 ahead of drilling.
• In addition to the more than ten (10) Shallow Gas Prospects within the ADX-AT-I and ADX-AT-
II licence areas, ADX completed for drilling several low-risk exploration and appraisal oil
prospects proximal to ADX’ Anshof oil field. A large increase in the potential resources for the
PERG and SGB prospects is scheduled for ASX announcement in Q3 2026, as part of an update
to the prospect inventory.
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Page | 13
Upper Austria map showing ADX-AT-I and ADX-AT-II licence areas as well as the Q2-Q4 2026 drilling &
testing work program
Welchau Investment Area Exploration
ADX has an Energy Investment Agreement (EIA) with MCF Energy Ltd. via its subsidiary MCF Energy
GmbH (MCF). The Welchau Investment Area contains the Welchau discovery well and other
emerging oil and gas prospects.
ADX holds a 75% economic interest in the Welchau Investment Area and a 100% economic interest
in the remainder of the ADX-AT-II licence other than the Anshof Discovery Area.
Welchau-1 Drilling Site Area Recultivation
The partial recultivation of the drilling site, including landscaping works, was completed during the
quarter in line with the applicable nature conservation approval and the findings of the Upper Austrian
Mining Authority.
This conservation is intended to preserve the borehole and the site for future drilling or testing and to
protect the environment and groundwater by preventing any surface leakage (see figure below). Well
pressure build-up and inflow monitoring continues at site.
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Page | 14
Welchau 1 drilling site area after partial recultivation
Future operations will focus on monitoring pressure build-up and fluid influx in the suspended well,
while evaluating the potential to deepen the well to intersect the original Welchau-1 target.
Welchau Geological Studies and Test Results
The Welchau geological study and testing results to date are as follows:
• The Welchau -1 was drilled targeting gas condensate updip of the Moln-1 discovery which
tested gas condensate at 3.5 MMSCFPD in 1989.
• The Welchau 1 well encountered 450 metres of gas shows across four (4) primary fractured
carbonate reservoirs from 1281 to 1731 metres. The well was suspended on 28th of March
2024 with 7-inch casing down to the well total depth (TD) at 1733 metres measured depth.
• A light oil with 43.6° API gravity was confirmed in the well through a recovered downhole
sample, including hydrocarbon shows, wellbore inflows during drilling, formation fluid
sampling and formation coring.
• A light oil was recovered from a down hole sample at 1479 metres in the Steinalm Formation.
• The oil recovered during testing of the Reifling formation between 1324 and 1452 metres -
the shallowest carbonate formation reservoir in the well – was found to be similar to the
Steinalm oil in compositional and geochemical characteristics and generated from a common
source.
• An oil water contact is prognosed below the Reifling Formation with the crest of the structure
approximately 500 metres above the Welchau-1 well (see figure below).
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Page | 15
• A potentially significant light oil accumulation has been encountered at Welchau-1 however,
the original gas condensate target up dip of the Molln-1 discovery well has not yet been
reached by the well.
• Pressure and structural data demonstrate continuity between Welchau-1 and the downdip
Molln-1 gas condensate discovery. Two (2) duplex arrays are mapped below the Welchau-1
casing shoe. The shallower of which can be reached by deepening the Welchau-1 well by 600
to 700 metres (see figure below).
• Figure below shows the relative position of the updip light oil accumulation located in the
Reifling Formation and the two deeper duplex structures updip of the Molln-1 gas condensate
discovery, in the overpressure regime.
Figure shows the interpreted oil water contact for the updip light oil accumulation located in the Reifling
Formation at the WEL-001 well (1) and the deeper duplex structure updip of the Moln 1 discovery well (2)
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Page | 16
Figure shows the relative position of the updip light oil accumulation located in the Reifling Formation at the
Welchau-1 well (1) and the two deeper duplex structures updip of the Moln 1 discovery well (2 & 3) in the
overpressure regime
Welchau Deep and Welchau Updip Oil
During the quarter, work continued on the reprocessing of seismic data and evaluation of the deeper
targets for future drilling.
A potentially significant light oil accumulation was encountered at Welchau-1; however the original
gas-condensate target has not yet been reached.
The figure below illustrates the potential to drill the deeper gas target, updip of the Molln-1 gas
condensate discovery, from the Welchau-1 well, and the option to sidetrack the well to the shallower
potential oil accumulation updip of Welcahu-1.
A map of the Welchau Gas Fairway and updip light oil accumulation is shown in the figure below.
1 WEL-001 Shallow:
Target potential 500m
updip oil column (LOS)
2. WEL-001 Deep 1:
Target central duplex structure in
duplex array 1 updip of MOL-001
proven gas-condensates (GCS)
2. WEL-001 Deep 2:
Target central duplex structure in
duplex array 2 updip of MOL-001
condensate and gas shows (not tested)
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Page | 17
Figure showing indicative deepening of Welchau-1 to a deep gas target and option to sidetrack the well to
the shallower potential oil accumulation updip of Welcahu-1
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Page | 18
Figure showing regional map of Molln Gas Fairway (GCS: gas-condensate system) and Welchau Updip Light
Oil Potential (LOS: light-oil system)
ADX has commenced preparatory work for planning and permitting the deepening of Welchau-1.
New Gas Prospect Maturation within ADX-AT-I and ADX-AT-II Licences
By the end of the quarter ADX completed the resources update, geological risks and economics on
three (3) new additional shallow gas low risk prospects (FUCHS, SAND and HASE) within the ADX-AT-I
licence (100% ADX economic interest). The resources of the BUCH gas prospect (LPF reservoir) in the
north-west part of the ADX AT-I licence (50% ADX economic interest) was also updated. The map below
shows these prospects as well as the ADX-AT-I farmout area (100% ADX economic interest).
The farmout process for the ADX-AT-II 100% ADX interest areas has resulted in presentations to
multiple interested companies, resulting in initial farm-in requests and commercial proposals.
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Page | 19
ADX-AT-I Licence Area Map showing the 100% ADX economic interest shallow gas exploration area in light
green colour. HASE prospect resources are available in an ASX release (6th
March 2026), FUCHS and SAND
resources will be announced in Q3 2026, as well as the BUCH gas prospect
ADX-AT-I Shallow Gas Prospects Initial - HOCH-1 Drilling Results (50% MND Investment Area)
The HOCH-1 well intersected eight gas reservoirs (“Hall” formation) based on gas shows from
mudlogging and electric wireline logging results (petrophysical analysis). An initial flow test of one gas
sand reservoir, the first zone, was successfully completed during the last week of June flowing at a gas
rate of 2.7 million cubic feet per day (equivalent to 450 boepd). A long-term pressure build up has
been recorded with down hole gauges to determine reservoir transmissibility and resource potential.
The successful testing of the first zone demonstrated high gas productivity and no water from a thin
reservoir, This result is highly encouraging for the testing of the other zones in the well to confirm
commercial quantities of recoverable gas.
It is planned to test up to five (5) of the eight (8) gas reservoir zones, selected as the most prospective,
commencing in August through to September.
These shallower purely stratigraphic trap Hall reservoirs have also been discovered in nearby gas fields
which initially targeted deeper gas reservoirs (Upper Puchkirchen) in simple structures. The figure
below is an example of a very large Puchkirchen reservoir gas field close to the HOCH-1 discovery
where Hall reservoirs alone produced 25 BCF.
Detailed 3D seismic and petrophysical work indicates that while the extent of all re
Share your feedback