11 November 2026
Austrian Well Work Program Yields
Immediate Success
Vienna Basin well flows at an initial rate of 1.8
MMSCFPD1
. The well will be choked back to 0.6
MMSCFPD due to sales pipeline capacity constraints.
“The restricted rate of 0.6 MMSCFPD is equivalent to a 100 BOEPD2
.
European gas price is EUR 82.6 per MWh which is equivalent to
US$162 per barrel.”
ADX Energy Ltd (ASX Code: ADX) is pleased to advise the commencement of a well work program
utilising the MB Well Services workover rig has yielded immediate success at ADX’ 100% owned
Vienna Basin Fields.
The GA-093 production well has flowed at an initial rate of 1.8 MMSCFPD through an 8mm choke
after its recompletion and the perforation of a gas zone. The well will be restricted to a sales gas rate
0.6 MMSCFPD which is equivalent to an oil rate 100 BOEPD. Undertaking the work at this time will
generate elevated incremental cash flow due to high gas prices and strong gas demand during winter
months in Europe. The current gas price in Europe is EUR 82.6 per MWh which is equivalent to an
oil price of US$162 per barrel.
The incremental production from the well represents approximately a 40% increase to ADX Austrian
production which averaged 242 BOEPD during the quarter ending 30 September 2026.
The ongoing well work program will focus on production enhancement activities at ADX’ Vienna Basin
Fields, as well as the testing of the HOCH-1 gas discovery well within the ADX-AT-I exploration licence
in Upper Austria. ADX is the operator and holds a 50% economic interest in the HOCH gas discovery.
Figure 3 below shows the location of the Vienna Basin Fields and the Upper Austrian ADX-AT-I and
ADX-AT-II exploration licences.
Future Well Work Program Activities
The remaining program of well work activities is scheduled as follows:
1. Vienna Basin oil well pump replacement Week Commencing 16 November
2. HOCH-1 well Phase 2 gas testing Week Commencing 7 December3
3. Vienna Basin well new oil zone completion Week Commencing 14 December
Future Work Program Objectives
The remaining well work program objectives are summarised as follows:
1. The replacement of a down-hole pump in the GA-072A production well is expected to deliver
approx. 15 BOEPD of incremental oil and gas production.
1
MMSCFPD means Million Standard Cubic Feet Per Day
2
BOEPD means Barrels of Oil Equivalent Per Day
3
Approximately two weeks of well work is required at HOCH-1 prior to testing
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Page | 2
ADX Energy Ltd | ABN 50 009 058 646 -Registered and Principal Office Australia
Level 1, 168 Stirling, Nedlands WA 6009, Australia
Telephone: +61 8 9381 4266 | admin@adxenergy.com.au | adxenergy.com.au
2. The testing of the HOCH-1 Hall Channel Zone #6 reservoir, refer to figure 2, requires the removal
of the well’s current completion, the drilling out of a cement plug to access the deeper gas reservoir
and re-running a production completion prior to perforating the well4
.
3. The perforation of a new production interval in the GA-087 well and the installation of a sand
retention completion is expected to deliver approx. 30 to 40 BOPD of incremental oil production.
Figure 1: The MB well services AW24 rig at the GA-93 well at ADX’ Vienna Basin Fields
4
The HOCH-1 shallow gas discovery well encountered up to eight (8) biogenic gas reservoirs within the Hall
basin floor fan formation and the Base Hall Channel formation. The commingled flow rate from four (4) reservoirs
during Phase 1 testing was 3.15 MMCFPD which is equivalent to 548 BOEPD (refer to ASX release on 28
August 2026)
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Page | 3
ADX Energy Ltd | ABN 50 009 058 646 -Registered and Principal Office Australia
Level 1, 168 Stirling, Nedlands WA 6009, Australia
Telephone: +61 8 9381 4266 | admin@adxenergy.com.au | adxenergy.com.au
HOCH-1 Phase 2 Testing Objectives
The Phase 2 testing program will evaluate the slightly deeper Hall Channel zones only (refer to figure
2). The zones have been mapped and correlated to nearby gas discoveries, indicating the potential
for a large lateral extension and resource potential. This interpretation is further supported by reserves
data from nearby Hall Channel production wells.
Figure 2: Shows the post drill mapping and the well correlations that indicate a large extension of the
stratigraphic trap (at least 2.5 km to the SE)
Figure 3: ADX exploration licences and producing fields in Austria
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Page | 4
ADX Energy Ltd | ABN 50 009 058 646 -Registered and Principal Office Australia
Level 1, 168 Stirling, Nedlands WA 6009, Australia
Telephone: +61 8 9381 4266 | admin@adxenergy.com.au | adxenergy.com.au
Further Well Work Program and Testing Results
Further updates regarding the Vienna Basin production enhancement program and the HOCH-1 well testing
program and will be provided as they become available.
For further details please contact:
Ian Tchacos
Executive Chairman
+61 (08) 9381 4266
ian.tchacos@adxenergy.com.au
Authorised for lodgement by Ian Tchacos, Executive Chairman
Persons compiling information about Hydrocarbons:
Pursuant to the requirements of the ASX Listing Rule 5.41 and 5.42 the technical and reserves information
relating to Austria contained in this release has been reviewed by Paul Fink as part of the due diligence process
on behalf of ADX. Mr. Fink is Technical Director of ADX Energy Ltd is a qualified geophysicist with 30 years of
technical, commercial and management experience in exploration for, appraisal and development of oil and gas
resources. Mr. Fink has reviewed the results, procedures and data contained in this release and considers the
resource estimates to be fairly represented. Mr. Fink has consented to the inclusion of this information in the
form and context in which it appears. Mr. Fink is a member of the EAGE (European Association of Geoscientists
& Engineers) and FIDIC (Federation of Consulting Engineers).
End of this Release
Stay Connected with ADX Energy
Receive ASX announcements and ADX updates directly to your inbox,
access videos and our interac�ve Q&A func�onality.
Scan the QR code or click here to sign up investors.adx-energy.com
Share your feedback
Discover