Past Quarter Highlights
Austrian Net Production increased by 31% averaging 231 BOEPD resulting in sales revenue
totalling A$2.4 million for the quarter.
The new Anshof Field Permanent Production Facility, with a maximum capacity of 3,000
BPD, was commissioned and is now achieving 95% uptime.
Permitting, planning, procurement and rig contract in place for the drilling of the Anshof2A oil appraisal well during September 2024, and the first gas exploration well in the ADXAT-I exploration licence in October 2024.
Ongoing structural interpretation, reservoir characterisation, resource estimation and well
test planning for the 450-metre hydrocarbon column encountered in the Welchau-1 well.
A$13.5 million placement, primarily to institutional investors, and a cash balance at end of
the quarter of A$12.6 million.
Next Quarter Planned Activities
Drilling of the Anshof-2A oil appraisal well during September 2024.
A resource review for the Welchau-1 gas liquids discovery in early September 2024.
Finalisation of the Welchau-1 testing strategy and program in readiness for testing during
Q4 2024.
Welchau-1 well test environmental approvals during Q3 2024 for Q4 2024 and Q1 2025
testing program.
Selection of ADX-AT-I gas exploration well and well site construction for drilling in October
2024.
Mature Welchau follow up exploration targets and large, high impact gas in 100% equity
held acreage in the ADX-AT-I licence.
ADX Executive Chairman, Mr Ian Tchacos, said, “An exceptional gas and condensate discovery at
Welchau, the installation of a permanent oil production facility at the Anshof field and a successful
capital raising program have positioned ADX for a period of well-funded and transformational activity
during the second half of 2024. The Company can look forward to production testing the large
hydrocarbon column encountered at Welchau, the drilling of an appraisal well to build oil production
at Anshof, as well as the drilling of a high impact gas exploration prospect within its extensive Austrian
portfolio, located in the heart of energy starved Europe.”
__________________________________________________________________________________________________________
ADX Energy Ltd | ABN 50 009 058 646 -Registered and Principal Office Australia
29 Bay Road, Claremont WA 6010, Australia
Telephone: +61 8 9381 4266 | admin@adxenergy.com.au | www.adxenergy.com.au
Page | 1
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
OPERATIONS REPORT
Production Activities
ZISTERSDORF AND GAISELBERG PRODUCTION ASSETS – Vienna Basin, Austria
ADX is operator and holds a 100% interest in the production
ANSHOF OIL DISCOVERY – ADX-AT-II licence, Upper Austria
ADX is operator and holds an 50% economic interest in Anshof-3 production
Production Operations
Oil equivalent sales during the quarter increased by 31% with the reintroduction of production from
the Anshof -3 well following the installation of the permanent production facility at Anshof in Upper
Austria, together with stable ongoing oil and gas production at the Vienna Basin fields. The net oil and
gas production rate from the Vienna Basin Fields averaged 185 BOEPD during the June quarter
(compared to 177 BOEPD in the previous quarter), that is a 5% increase compared to the previous
quarter. Following the re-instatement of production on 3 April 2024 and subsequent commissioning,
the Anshof-3 well contributed 46 BOPD of net sales during the quarter resulting in total net sales
including the Vienna Basin of 231 BOPD.
Production histogram showing ADX net Austrian barrels of oil and gas (oil equivalent) production during the
current quarter and the previous quarter
Page | 2
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Field Revenues and Product Pricing
Average Brent reference oil pricing strengthening slightly from the previous quarter averaging USD
84.94 per barrel. Gas prices weakened slightly the quarter averaging EUR 27.78 per MWh, a decrease
of 3% compared to the previous quarter.
Oil and gas revenue histogram showing impact of oil and gas price and the increasing contribution of
production from the Anshof-3 well which was reinstated through the permanent production facility on 3
April 2024
Table 2 below shows sales revenues of EUR 1,503,500 for the June 2024 quarter compared to EUR
1,109,000 in the March 2024 quarter due to the reinstatement of production at Anshof and a stable
contribution of production from the Vienna Basin Fields.
Page | 3
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Hedging
ADX has continued to deploy a rolling hedging strategy seeking to provide stable near term revenue
generation during volatile market conditions. A number of hedging transactions have been deployed
during periods of favourable market conditions.
On 26 January 2024, ADX executed hedging transactions with Britannic Trading Limited with a fixed
price swap contract for 8,400 barrels of oil at a fixed Brent crude oil price for February 2024 to May
2024 inclusive of USD 80.00 per barrel. The quantity of hedged oil equated to approximately 70 BOPD
during the period.
On 3 April 2024, ADX executed additional hedging transactions with Britannic Trading Limited with a
fixed price swap contract for 15,000 barrels of oil at a fixed Brent crude oil price for June 2024 to
October 2024 inclusive of USD 85.31 per barrel. The quantity of hedged oil equates to approximately
100 BOPD during the period.
The balance of the crude oil production from the Vienna basin fields remains unhedged during the
period allowing ADX to maintain exposure to upside in Brent crude oil pricing. Gas production from
the Vienna basin fields is also not hedged.
ADX recently hedged part of its production for the rest of 2024. On 5 July 2024, ADX executed further
hedging transactions with Britannic Trading Limited with a fixed price swap contract for 6,000 barrels
of oil at a fixed Brent crude oil price for November 2024 and December 2024 inclusive of USD 83.15
per barrel.
Page | 4
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Appraisal & Development Activities
ANSHOF EOCENE OIL PROJECT – Anshof Field Area, ADX-AT-II LICENCE, Upper Austria
ADX is operator and holds a 50% economic interest in the Anshof Field Area and a 60% interest in
the Anshof-2 well. ADX is operator of the ADX-AT-II exploration license and holds a 100% interest in
the licence other than the Anshof Field Area, Anshof-2 well and the Welchau Investment Area.
Location map for the Anshof Field Area within the ADX-AT-II licence. The low-risk appraisal follow up satellite
prospects (ADX 100% economic interest) including SGB, LIND and GRB North and South of the Anshof field
are also shown
Anshof-3 Production
The Anshof-3 well recommenced production as part of the commissioning of the up to 3,000 BOPD
capacity permanent production facility (PPF) with first oil production into the PPF on 3 April 2024.
Anshof-3 produced at an average daily rate of 100 bopd during the quarter with a 95% uptime over 89
production days. The total production of 8,369 barrels for this quarter was a 11% decrease on the last
production quarter (Q3 2023, 9,421 barrels). There were 4 days of production shut-in during the
quarter since recommencement of production on 3 April 2024. The shut-in time was mainly related to
troubleshooting and replacement of level measurement sensors in the 3-phase separator and the oil
and water storage tanks.
Page | 5
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
At the end of the quarter, Anshof-3 was producing at 116 bopd. The well continues to show strong
performance with no impairment to well productivity.
Development Drilling Program
The sidetrack drilling of the Anshof-2 well (Anshof-2A) is expected to commence in early September
2024. The well is expected to take 14 days in the success case with the well ready for test and tie-in to
the permanent production facility (PPF).
The Anshof-2A well is planned as a producer in a more crestal part of the structure targeting a thicker
section of the Eocene reservoir with excellent reservoir quality as was seen in the Anshof-2 well. The
bottom hole location of Anshof-2A has been optimised utilising data obtained from the Anshof-2 well
where Eocene sands that were approximately 6 times thicker than the Anshof-3 discovery well which
is currently producing at approx. 116 BOPD.
Figure showing a comparison of the Eocene sand thickness (shown in yellow) between Anshof-3 (LHS) and
Anshof-2 (RHS)
The well will be sidetracked from below the 9 5/8” shoe of the Anshof-2 well. The well is planned to
intersect the top Eocene sands at a TVD depth 37 metres shallower than the Eocene intersected at the
water bearing Anshof-2 well. The well trajectory is in a North/North-East direction and will have a low
angle (22°) intersection of the Eocene some 0.5 km distance up-dip from the Eocene penetration in
the Anshof-2 well.
The Anshof-2A sidetrack well will minimise the cost to develop this part of the field and retain a well
slot for future development drilling.
Page | 6
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Anshof field outline and areas of greater reservoir thickness with interpreted field oil-down-to (ODT)
Permanent Production Facilities Installation, Engineering and Commissioning
The Anshof field PPF was successfully commissioned during the quarter with first Anshof-3 oil
production into the newly installed PPF on 3 April 2024.
Key development activities during the quarter were as follows:
•
•
•
The PPF mechanical Designated Authority inspection and certification was completed;
The initial teething problems with measurement sensors in both the 3-phase separator and the
storage tanks (oil and water) were successfully resolved at the beginning of Q3 2024; and
Redirected waste heat from the CHP to the heat exchanger has increased the temperature in the
settling tanks, enhancing the settling process while promoting energy efficiency and reducing
environmental impact.
The PPF provides the following opportunities to optimise field production at Anshof:
• increased production capacity (3,000 barrels of liquids per day);
• capability to process oil from multiple wells;
• additional oil storage capacity;
• use of associated gas for power generation and process heat; and
• enhanced automation requiring less manual operations.
The PPF will be mostly unmanned and operate 24 hours per day with wireless data transmission.
Anshof Permanent Production Facility at ADX’ Anshof-3 location
Page | 7
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Exploration Activities
Upper Austria AGS Licenses – Austria
ADX is operator and holds a 75% interest in the Welchau Exploration Area and a 100% interest in the
ADX-AT-I and ADX-AT-II exploration licenses other than the Welchau Exploration Area and the
Anshof Field Area. ADX’ interest in the MND Investment Area will reduce to 50% upon the completion
of MND’s farmin obligations.
Welchau Gas Liquids Discovery
Map showing the Welchau-1 drilling location in the ADX-AT-II license area in the Northern Calcareous Alps
The Welchau-1 gas exploration well was spudded on the 24th of February using the RED Drilling &
Services GmbH (RED) E200 drill rig in the ADX-AT-II exploration licence with the rig released on 4.00
pm Central European Time (CET) on the 28th of March. The well was suspended for future well testing
after running and cementing 7-inch casing down to the well total depth (TD) at 1733 metres MD.
The Welchau gas prospect has exceptional gas resource potential, located in the heart of Europe
proximal to gas pipelines. Prior to the drilling of Welchau-1, ADX estimated that Welchau had best
technical Prospective Resources of 807 BCFE (134 MMBOE) at a reporting date of 22 June 2023.
Prospective Resources are those estimated quantities of petroleum that may potentially be recovered
by the application of a future development project(s) related to undiscovered accumulations. These
estimates have both an associated risk of discovery and a risk of development. Further explorations
appraisal and evaluation is required to determine the existence of a significant quantity of potentially
moveable hydrocarbons.
Page | 8
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
During the quarter, the significant amount of well data gathered from drilling and evaluating the well
has been utilised for ongoing structural interpretation, reservoir characterisation, resource estimation
and well test planning. It is planned to update the resource estimate during the third quarter of 2024
prior to the well test planned for the fourth quarter of 2024. ADX has engaged a number of
geotechnical and engineering professionals highly experienced in fractured carbonate reservoirs to
assist the ADX team with reservoir characterisation, resource evaluation, well testing strategy,
planning and execution.
Welchau-1 Structural Definition
The Welchau-1 well is confirmed to be at or near the crest of an East-West trending, asymmetric
anticline. This structural interpretation is in line with the pre-drill structural model prediction. There is
a slight change in the strike of the fold axis making the structure less cylindrical than predicted (in the
Eastern part of Welchau anticline), as shown in the figure below. There has been practically no change
as yet in the gross rock volume estimates between pre and post drill.
Figure showing Welchau-1 Top Steinalm Formation map pre and post drill
Welchau-1 Data Analysis
There are three primary carbonate reservoirs in the Welchau-1 well which are promising for testing
and ongoing appraisal. Based on hydrocarbon shows including tow wellbore inflows during drilling
operations and electric line logs there are the Reifling (128 metres), Steinalm (118 metres) and the
Guttenstein (111 metres). The Steinalm reservoir flowed condensate rich gas at a rate of 4 MMSCFPD
in the nearest discovery well (Molln-1) located just some 3 km away and tested in 1989.
The analysis of Welchau-1 well results including hydrocarbon shows, formation cuttings while drilling,
Page | 9
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
electric line logging, formation sampling and coring is almost complete. The results are being used to
update the resource range for Welchau and finalise the well testing design.
Third-party petrophysical consultants have evaluated the three key reservoirs and integrated the
routine and special core analysis measured data from the 7-metre Steinalm core in to their evaluation.
They have calculated that all three reservoirs to be hydrocarbon bearing with uncertainty on the
hydrocarbon type. It is noted however, that estimates of hydrocarbon saturation in tight fractured
carbonates is exceptionally difficult in the presence of micro fractures due to uncertainty in relation
to formation water properties (i.e. electrical conductivity – salinity).
The specialist laboratory work carried out on the Modular Dynamic Tester sample taken in the
Steinalm reservoir has confirmed the full properties (compositional data and thermodynamic
characteristics) associated with the 43° API light sweet oil that was recovered in a MDT (down hole
sample tool) run in the Steinalm Formation. The vertical extent of this light oil in the Steinalm or in the
shallower Reifling and deeper Guttenstein is uncertain. There is no clear evidence of a hydrocarbon
water contact in any of the reservoir formations based on the open hole wireline log data.
Wellbore image analysis specialists have carried out a detailed fracture and fault analysis using the
Welchau-1 image log data, the open hole log data together with the dynamic drilling data (i.e. mud
losses to the formation and gas shows from the formation). The analysis includes the identification of
the many fracture types (e.g. open, closed, partially cemented etc,) as well as their frequency,
orientation etc. Multiple open fractures and resulting fracture net-works have been identified which
are critical to hydrocarbon flow and hydrocarbon recovery.
In addition to fractures networks, the image specialists have identified other features that have the
flow characteristics of open permeable fractures but are not fractures. These features are ‘reactivated
beddings’ associated with folding of the rock (refer figure below). These ‘reactivated beddings’ are
also expected to contribute to well flow and recovery.
Figure showing Welchau-1 Image log with ‘reactivated bedding’ and possible outcrop analogy
Page | 10
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Welchau-1 Data Modelling
The image analysis work underpins the building of 3D conceptual models around the Welchau-1 well
for well flow and resource estimation which will be incorporated into well test planning. This
conceptual modelling work has commenced with experts in the field of fractured carbonates
characterisation and resource estimation. In addition, this work will be utilised for the well test
strategy, well test planning and future appraisal drilling. This 3D modelling work is planned to be
completed in during the third quarter of 2024 with a resource estimate range for each reservoir. The
well testing is planned to commence during the fourth quarter of 2024.
Welchau-1 Well Test Permitting
ADX have made an application for the testing of the Welchau-1 well with a planned commencement
date of 1 October 2024. Operational and environmental permits have been submitted to the
designated authorities for an extended testing program during the Austrian winter months from 1
October 2024 to 31 March 2025. Permitting at the Welchau-1 location has required extra
environmental precautions given the well sites proximity to a national park.
Welchau-1 drilling location in the Northern Calcareous Alps
Welchau-1 follow up Potential
The Welchau-1 well has confirmed a highly prospective hydrocarbon play established by the Welchau1 hydrocarbon discovery. The well has confirmed the existence high quality gas and hydrocarbon
liquids which are pervasive across multiple, large carbonate reservoir intersections trapped in an
extensive hydrocarbon charged seal in a structural setting that is capable of trapping large volumes of
hydrocarbons which is evidenced by similar plays in other thrust settings across the world.
Page | 11
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Two immediate, follow up exploration targets have been identified:
•
•
Welchau-1 Deepening: There remains over 1,000 metres of exploration potential below the current
Welchau-1 well TD. The opportunity of deepening the Welchau-1 well after testing the existing
discovery is being assessed.
Step-out Exploration Lead: This lead is a similar anticline structure to Welchau. The feature has
similar shallow drill depths that is located approximately 7 km Northwest of Welchau-1. The
structure has been identified from surface imaging, dynamic structural balancing techniques and
surface geology mapping. As was the case with Welchau some 2D seismic may help to detail the
closure. Additional detailed field work is being undertaken to mature this prospect as a potential
follow up exploration well.
Welchau Partnership Interests
In early 2023, Canadian TSX Venture Exchange listed MCF Energy Ltd. (MCF), executed an Energy
Investment Agreement (EIA) to fund 50% of the cost of the Welchau-1 exploration well to earn a 20%
economic interest in the Welchau Investment Area. The funding obligation was based on a well cost
cap of EUR 3.8 million On 9 January 2024, ADX announced a variation to the terms of the EIA with MCF
such that MCF agreed to fund 50% of the Welchau-1 well costs up to EUR 5.1 million to earn a 25%
economic interest in the Welchau Investment Area.
ADX-AT-I 2024 Gas Exploration Drilling
Map showing the MND Investment Area within the ADX-AT-I license which includes the LICHT and IRR gas
exploration prospects
Page | 12
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Following the completion of the Energy Investment Agreement in January 2024 with MND Austria a.s.
(MND) to fund an exploration well in the MND Investment Area (MND EIA) ADX continued to mature
potential prospects for drilling during the fourth quarter of 2024. In accordance with the MND EIA (see
summary below) MND has agreed to fund a gas exploration program in ADX-AT-I. The parties have
agreed to drill either the IRR prospect or LICHT prospect. ADX continued permitting as well as technical
maturation and operational planning for both drilling prospects with a view to spudding either
prospect during October 2024. As a result of this work the LICHT prospect is fully permitted (ie with
drilling permits and an environmental clearance). Land access has been secured with landowners for
the IRR Prospect as well as future shallow gas prospects in MND Investment Area such as SCHÖN and
HOCH. All prospects offer significant resource potential for onshore gas, are fully covered by high
quality 3D seismic, supported by seismically generated direct hydrocarbon indicator responses and are
proximal to gas infrastructure. ADX and MND have agreed to select the first drilling prospect during
early August 2024 in time to construct a drill site for drilling by October 2024.
MND EIA Summary: In January 2024 MND paid back costs of EUR 0.45 million (A$0.74 million) to ADX
and agreed to fund EUR 4.5 million (A$7.40 million) for exploration drilling to earn a 50% economic
interest in MND Investment Area (an exploration investment area within the ADX-AT-I license), in Upper
Austria. The MND Investment Area is shown in the map above.
ADX is Operator and retains a 50% economic interest in the MND Investment Area following the
completion of MND’s investment obligations. ADX has retained a 100% interest in the remainder of the
ADX-AT-I license including adjacent gas exploration prospects (OHO and ZAM) and the GMU
geothermal / oil and gas energy prospect.
In addition to permitting the above-mentioned prospects for drilling, ADX continues to mature low risk
gas exploration prospects such as HOCH and SCHOE in the northern part of the ADX-AT-I licence shown
in the map above. The HOCH and SCHOE prospects can be drilled with a smaller rig than that permitted
for IRR and LICHT. ADX is undertaking a budget inquiry to secure a suitable rig that will provide a more
cost-effective alternative for drilling shallower prospects in the future. These prospects are very close
to gas infrastructure and are expected to contain dry natural gas (methane) only which would reduce
the development time and cost for any discovery.
The ongoing maturation of the HOCH prospect has revealed that it could be connected to a similar
downdip prospect (known as GAST in former announcements) which is expected to result in a larger
combined accumulation. The best technical prospective resources for HOCH and GAST were 4.8 BCF
and 3.6 BCF (refer to ASX Prospective Resources Update dated 22 June 2023). The revised HOCH –
GAST prospect is now expected to contain 8 BCF best technical prospective resources.
Prospective Resources are those estimated quantities of petroleum that may potentially be recovered
by the application of a future development project(s) related to undiscovered accumulations. These
estimates have both an associated risk of discovery and a risk of development. Further explorations
appraisal and evaluation is required to determine the existence of a significant quantity of potentially
moveable hydrocarbons.
The 3D seismic section below and the inserted reservoir amplitude map is indicative of gas reservoir
presence and summarises the most important technical features of the combined HOCH-GAST
prospect. The depth contours also show that the prospect has a very low risk 4-way dip closure
Page | 13
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
component and a large structural – stratigraphic upside being located in the axis of a structural nose
plunging to the NW. A drill site has been secured and permitting will commence after rig selection.
Seismic cross section of HOCH prospect
Additional ADX-AT-I Gas Prospect Maturation (ADX 100% equity areas)
In addition to the work undertaken on preparing gas prospects for drilling within the MND Investment
Area, ADX is undertaking additional prospect maturation work on areas within the remainder of the
ADX-AT-I licence where it holds a 100% equity interest. Notably two large 3D seismic covered prospects
have been identified (ZAM and OHO) with large prospective resource potential in excess of 100 BCF.
(Refer to ASX Prospective Resources Update dated 22 June 2023).
Planned prospect maturation work includes refining the stratigraphic horizon interpretation and
identifying tectonic events of each prospect. The third party study will focus on establishing a
kinematically consistent 3D structural model which is expected to significantly de-risked the large
resource potential of the prospects in readiness for drilling and potential co-investment.
Seismic reprocessing of the ADX-AT-I area is in progress with DMT, Germany. Several additional leads
with approx.. 50 MMBOE prospective resources potential have been identified (mainly below the
imbricated section that effects seismic imaging in deeper structures) which would be de-risked
substantially by state-of-the-art PSDM. The work is expected to be finalized by the end of the year. (Refer
to Prospective Resources cautionary statement on the previous page).
Summary for Second Half of the Year Activities
A summary of planned Exploration activities during second half of the year includes the following:
1. Operations planning and permitting for drilling and testing program;
2. The drilling of the LICHT or IRR gas exploration prospects in ADX-AT-I;
3. Revision of the Welchau-1 prospective resource estimates;
4. Testing the 450m of hydrocarbons shows in a giant Welchau structure; and
5. Ongoing prospect maturation and portfolio development in ADX-AT-I and ADX-AT-II licenses.
Page | 14
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
Map showing location of planned Portfolio Development activities in Upper Austria
ADX has suspended farmout activities in Upper Austria, concentrating the Company’s efforts on the oil
appraisal drilling programme at Anshof, the ADX-AT-I gas exploration programme, the testing of the
Welchau gas condensate discovery during the fourth quarter as well as ongoing oil and gas prospect
maturation.
ADX expects to update its prospect inventory during the fourth quarter of 2024 with a view to
recommencing farmout activities early in 2025.
The combination of drill ready prospects, strong demand for hydrocarbons, a favourable regulatory
framework in Austria and a proven Participation Framework developed by ADX and approved by the
Austrian ministry (for the Anshof and MND transactions) is expected to provide a favourable
environment for ongoing co-investment transactions.
PARTA EXPLORATION PERMIT AND IECEA MARE PRODUCTION LICENSE – Romania
ADX holds a 49.2% shareholding in Danube Petroleum Limited (Danube). The remaining shareholding
in Danube is held by Reabold Resources Plc. Danube via its wholly owned subsidiary, ADX Energy
Panonia S.R.L., holds a 100% interest in the Parta Exploration license (including a 100% interest in the
Parta Appraisal Sole Risk Project) and a 100% interest in the Iecea Mare Production license. ADX is the
operator of the permit pursuant to a services agreement with Danube.
Nothing further to report since the previous quarterly report, as summarised below.
Page | 15
ADX Energy Ltd (ASX:ADX)
ASX RELEASE
ADX is engaged in ongoing discussions with the Regulatory Authorities in relation to options for the
Parta exploration license extension. ADX has delivered a number of requested reports in support of
the extension discussions. The Iecea Mare production license which has a validity (or term) of 20 years
and is not affected. Options to exploit the geothermal potential of the Romanian part of the Pannonian
Basin are under investigation with the authorities in combination with a subsurface review of the likely
prospectivity.
The legislation for the use of Geothermal energy is under construction, the regulator stated that a
petroleum license needs to be transferred into a geothermal license, before any non-petroleum
operations can be performed, after finalising all petroleum operations as defined in the license
agreement.
Permit d 363C.R-.AX – Offshore Italy
ADX is operator and upon grant, will hold a 100% interest in the d 363C.R-.AX Exploration Permit
The d 363 C.R-.AX ’Nilde’ permit in the Sicily Channel, offshore Italy (below) is located in a water depth
of 90-100 metres just over 60 km from the shore of the island of Sicily and comprises the Nilde Oil
Field, which previously produced 20.5 million barrels of 39° API oil in the 1980s, two further oil
discoveries Norma-1 and Naila-1, as well as an exploration inventory of 5 oil leads. Across the permit
there are Contingent Resources of 19.2 to 65.6 million1 barrels of remaining oil and Prospective
Resources of 40 to 201 million barrels oil (arithmetically added)2.
The total best technical prospective resource potential of five high graded gas prospects is 369 BCF (refer
ASX announcement 30 August 2022). The five high graded prospects are considered as relatively low
risk since they are simple 4-way dip anticline closures featuring a seismic amplitude response commonly
known as Direct Hydrocarbon Indicators (DHI’s).
Note 1: Contingent Resources Reporting Date for Nilde was 29.03.2018 and Prospective Resources
Reporting Date in d 363 C.R-.AX 21.04.2016 (oil) and 30.08.2022 (gas).
Note 2: Refer to Cautionary Statement in relation to Prospective Resources below.
Prospective Resources are those estimated quantities of petroleum that may potentially be recovered by
the application of a future development project(s) related to undiscovered accumulations. These
estimates have
Share your feedback
Discover