European Energy Producer and Explorer Presentation
Released
Released
Announcement PDF
An ASX listed European Energy
Producer and Explorer
Ian Tchacos | Executive Chairman
“Reliable energy doesn’t need to cost the earth”
I n v eASX:
s t oADX
r Update
adx-energy.com
|
9 October 2023
ASX:ADX
2
Disclaimer Statement
Important notice:
This document has been prepared by ADX Energy Ltd (“ADX”) for the purpose of providing information to interested analysts, investors and shareholders. Any statement, opinions, projections, forecasts or other materials contained in this document do not constitute any commitments, representations or
warranties by ADX or its directors, agents and employees.
Except as required by law, and only to the extent so required, directors, agents and employees of ADX shall in no way be liable to any person or body for any loss, claim, demand, damages, costs or expenses of whatsoever nature arising in any way out of, or in connection with, the information
contained in this document. This document includes certain statements, opinions, projections, forecasts and other material, which reflect various assumptions. The assumptions may or may not prove to be correct. ADX recommends that potential investors consult their professional advisor(s) as
investment in the company is considered to be speculative in nature.
The information in this presentation is in summary form only and does not contain all the information necessary to fully evaluate any transaction or investment. It should be read in conjunction with ADX’ other periodic and continuous disclosure announcements lodged with the ASX. This document does
not constitute an offer, invitation or recommendation to subscribe for or purchase securities and does not form the basis of any contract or commitment.
Persons compiling information about hydrocarbons. Pursuant to the requirements of the ASX Listing Rule 5.31, 5.41 and 5.42 , the unaudited resources and reserves information contained in this presentation has been prepared under the supervision of Mr Paul Fink. Mr Fink is Technical Director of ADX
and a qualified geophysicist with 30 years of technical, commercial and management experience in exploration for, appraisal and development of oil and gas resources. Mr Fink has consented to the inclusion of this information in the form and context in which it appears. Mr Fink is a member of the
EAGE (European Association of Geoscientists & Engineers) and FIDIC (Federation of Consulting Engineers).
Independent audit of developed reserves have been completed for ADX’ Zistersdorf and Gaiselberg fields (“Fields”) in the Vienna basin and Anshof in Upper Austria (Austria) by RISC Advisory Pty Ltd (“RISC”). RISC conducted an independent audit of ADX’ Fields evaluations, including production forecasts,
cost estimates and project economics. Production from existing wells is classified as Developed Producing. Production from planned recompletion of existing wells to new intervals is classified as Developed Non-Producing. RISC is an independent advisory firm offering the highest level of technical and
commercial advice to a broad range of clients in the energy industries worldwide. RISC has offices in London, Perth, Brisbane and South-East Asia and has completed assignments in more than 90 countries for over 500 clients and has grown to become an international energy advisor of choice.
PRMS Reserves Classifications used in this presentation:
Developed Reserves are quantities expected to be recovered from existing wells and facilities.
Developed Producing Reserves are expected to be recovered from completion intervals that are open and producing at the time of the estimate.
Developed Non-Producing Reserves include shut-in and behind-pipe reserves with minor costs to access.
Undeveloped Reserves are quantities expected to be recovered through future significant investments.
A. Proved Reserves (1P) are those quantities of Petroleum that by analysis of geoscience and engineering data, can be estimated with reasonable certainty to be commercially recoverable from known reservoirs and under defined technical and commercial conditions. If deterministic methods are used,
the term “reasonable certainty” is intended to express a high degree of confidence that the quantities will be recovered. If probabilistic methods are used, there should be at least a 90% probability that the quantities actually recovered will be equal or exceed the estimate.
B. Probable Reserves are those additional Reserves which analysis of geoscience and engineering data indicate are less likely to be recovered than Possible Reserves. It is equally likely that actual remaining quantities recovered will be greater than or less than the sum of the estimated Proved plus
Probable Reserves (2P). In this context, when probabilistic methods are used, there should be at least a 50% probability that the actual quantities recovered will equal or exceed the 2P estimate.
C. Possible Reserves are those additional Reserves that analysis of geoscience and engineering data suggest are less likely to be recoverable that Probable Reserves. The total quantities ultimately recovered from the project have a low probability to exceed the sum of Proved plus Probable plus Possible
(3P) Reserves, which is equivalent to the high-estimate scenario. When probabilistic methods are used, there should be at least a 10% probability that the actual quantities recovered will equal or exceed the 3P estimate. Possible Reserves that are located outside the 2P area (not upside quantities to
the 2P scenario) may exist only when the commercial and technical maturity criteria have been met (that incorporate the Possible development scope). Standalone Possible Reserves must reference a commercial 2P project.
Prospective Resource Classifications used in this presentation:
Prospective Resources are those estimated quantities of petroleum that may potentially be recovered by the application of a future development project(s) related to undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development. Further explorations
appraisal and evaluation is required to determine the existence of a significant quantity of potentially moveable hydrocarbons.
P(90) Estimate: means at least a 90% probability that the quantities actually recovered will equal or exceed the estimate.
P(50) Estimate: means At least a 50% probability that the quantities actually recovered will equal or exceed the estimate.
P(10) Estimate: means At least a 10% probability that the quantities actually recovered will equal or exceed the estimate.
Oil and Gas Conversions
BOE means barrels of oil equivalent. Bcfe means billion of cubic feet of gas equivalent. Gas to oil conversion used in this presentation: 6 mcf of gas = 1 barrel of oil. Mcf means thousand cubic feet of gas
Investor Presentation – 9 October 2023
A Compelling Investment Proposition
for European Energy Security
Strong
Underlying
and Increasing
Cashflow
Meaningful
Reserves and
production
Growth from
New Discovery
336 boepd
oil & gas production1
World-class
Exploration
Portfolio in the
heart of Europe
3
▪ Enterprise Value (EV) = US$ 17.5 m
Value Adding,
Complementary ▪ EV per 2P reserves = US$ 4.05/boe
Renewable
Projects
▪ EV per resources = US$ 0.08/boe
- Best Estimate Prospective Resources
▪ EV per flowing boe = US$ 52,125
- Oil and gas equivalent
4.3 mmbbl 2P
213 mmbboe
reserves2
prospective resources
3
47 MW combined
renewable energy
potential
Prospective Resources are those estimated quantities of petroleum that may potentially be recovered by the application of a
future development project(s) related to undiscovered accumulations. These estimates have both an associated risk of discovery and a risk
of development. Further explorations appraisal and evaluation is required to determine the existence of a significant quantity of
potentially moveable hydrocarbons
1 March 2023 average production from the Zistersdorf & Gaiselberg fields and Anshof field. 2 ref. ASX release dated 31 October 2022 varied for MND transaction dated 18 September 2023, 3 Best
technical prospective resources for Upper Austria only. Prospective resources reporting date update 22.06.2023
Investor Presentation – 9 October 2023
4
Corporate and Asset Summary
Positioned for a smarter, cleaner future for Europe
Austria Oil & Gas Assets
Austria Clean Energy Projects
Financial information
Vienna Basin fields – 100% (production)
Anshof oil discovery – 80% (production & development)
ADX-AT-I & ADX AT-II – 100% (exploration & appraisal)
Vienna Basin Green Hydrogen project – 100%
Gmunden geothermal project – 100%
Vienna Basin solar project – 100%
Share price as at 04.10.2023
A$ 0.089
Number of shares
363.1 m
Number of options
42.2 m
Market capitalisation
A$ 32.3 m
Cash (unrestricted) as at 30.06.2023
Plus subsequent loan note funds; &
Anshof Development funding and participation.
A$ 6.7 m
Debt (net of restricted cash for debt)
A$ 2.2 m
Enterprise value
A$ 27.8 m
Number of shareholders
2,112
Political & Strategic position
Stable jurisdictions with unmet energy demand
d363C.R-.AX permit (Italy)
Romania Oil & Gas Assets
Excellent access to infrastructure
Shallow waters offshore exploration permit – 100%
369 Bcf prospective resources1 (5 prospects)
Subject to ratification by the Italian authorities
49.2% shareholding in Danube Petroleum which holds:
- Parta exploration licence – 100%
- Iecea Mare production licence – 100%
Strong focus on energy security since Ukraine war
Operatorship capability & boots on the ground
Refer to Cautionary Statement in relation to Prospective Resources on Page 3 of
this presentation
Investor Presentation – 9 October 2023
1 The original resources reporting date was on 30 August 2022
Our focus is on Austria
5
A hidden energy gem with a rapid pathway from exploration
to production and lots of running room
A significant oil and gas industry
1 billion bbl oil & 2.7 Tcf gas
produced to date
75 Years oil & gas duopoly
before ADX becoming the third
operator in country
Energy Demand is unmet by
local supply resulting in High
Value Markets
Upper Austria Assets
Production, Exploration &
Geothermal
50% exploration success rate,
infrastructure access, 3D seismic data set
& extensive portfolio
Investor Presentation – 9 October 2023
ADX Vienna Basin Fields
Oil and gas production,
H2 production & storage, Solar Park
Stable long life production, depleted
reservoirs for storage & connected to power
as well as oil & gas pipeline grid
Excellent Infrastructure that is
highly accessible and Regulatory
Processes are favourable & fast
¹ In Upper Austria since 2000 (11 discoveries out of 22 wells )
6
Recent highlights
Welchau Gas Prospect Anticline
Last twelve months of activities
Financial
Showing Mapping based on Surface Geology
Surface expression of Welchau gas
prospect 100 km2 area anticline
➢ Increasing Revenues 2022 Sales up to $14.4 million (+59%)
➢ Increasing Cash Flow 2022 Operating Revenue up to A$7.7 million (+85%)
➢ Deleveraging Loan Repayment A$3.3 million (Vienna basin field)
➢ Welchau Well farmout MCF Energy 50% well funding for 20% interest
➢ Anshof Investment Agreement A$19 million MND funding for 30% interest
Asset
Production operations at Anshof -3 well
➢ Anshof Independent Reserves 2P Reserves 5.9 MMBOE 1(50% net to ADX) The Welchau Prospect has 23 km lateral extension,
site100 km² area and vertical relief of 2140 m (max.)
➢ Anshof-3 Commercial production approx. 150 bopd (50% net to ADX)
➢ Upper Austria Portfolio Best case prospective resources of 213 MMBOE 2
➢ Anshof-2 drill ready November 2023 drilling commencement
➢ Welchau-1 permitting December 2023 drilling commencement
➢ Endorsed Partnership framework for multiple exploration investments
Refer to Cautionary Statement in relation to Prospective Resources on Page 3
of this presentation.
Investor Presentation – 9 October 2023
¹ Reserves reporting date 31.10.2022. 2 Prospective resources reporting date update 22.06.2023
7
Forecast Activities
Exceptional potential growth period funded by farmouts
An exceptional period of drilling activity
• 2 Appraisal & development wells
• 2 High impact gas exploration wells
Entire program almost entirely funded by farmouts
Production and cash flow growth
• Three Anshof wells expected to produce at approx 1000 bopd
• Upgraded production facilities with up to 4000 bopd capacity
Ability to further increase field production and reserves
Further appraisal and exploration partnership formation
• Low risk, high reward Anshof oil follow up
• Recently matured, low risk, shallow gas play exploration
Further growth potential funded by farmouts
Progress feasibility of renewable energy projects
• Vienna Basin Solar Project and Hydrogen Production and Storage
• Upper Austria Combined Geothermal and Hydrocarbon Project
Complementary value adding projects
Investor Presentation – 9 October 2023
RED drilling rig at the Anshof -3 well in
Upper Austria license
Vienna Basin and
Upper Austria
Production and
Development provides a
a solid and rapidly growing cash
flow base
8
9
Austrian Production and Development Assets
Stable, high value production with high growth potential
Vienna Basin Fields (100% interest)
Anshof Oil Project (50% interest)
✓ Low emission, low decline production delivering
long term cash flow (approx. 250 boepd)
✓ Anshof-3 well in production 6 months after testing
performance confirms field potential
✓ Ownership of 13.7 hectares of land suitable for
Solar Park - 65 Km from Vienna
✓ Independently reviewed reserves NPV8 EUR 42.3
million 2, 3 High quality crude (Brent equivalent)
✓ High value sweet crude oil (no royalties)
✓ Two development wells funded by MND transaction
can deliver large oil rate increase (600 bopd/well est)
120 bopd
oil production
“currently
curtailed”
Wind park adjacent to ADX Vienna Basin Fields
5.2 mmbbl
gross 2P
reserves2
Production operations at ADX Vienna Basin Fields
Multilayer field
suitable for H2
storage
1.72 mmbbl
2P developed
reserves Note 1
Investor Presentation – 9 October 2023
Pipeline to
Vienna refinery
& gas pipeline
26 mmbbl
3P reserves &
3C resources2
Note 1: Reserves Reporting Date & Valuation (Independently Audited) 4/11/2021
less production to 31 December 2022
Anshof-3 production well and Early Production
Unit, Anshof-2 and 1 drilling locations
2 Independently Reviewed ref. ASX release dated 31 October 2022 3 Estimated Net Present Value
discounted at 8% real. (NPV8) of the 2P gross reserves
10
Long-term Future for Vienna Basin Fields
With addition of Solar Park, Hydrogen generation and Hydrogen Storage
Vienna Basin Green Hydrogen
Project Concept Schematic
ADX owned land for Solar Park
1.5 MWp plus being considered for self consumption,
Hydrogen generation and possible sales to the grid
Power grid and renewable electricity access
On-going discussions with power grid operator. High voltage
power line located within a 10-km radius
Underground gas reservoirs capacity
Capacity of 75-100+ GWh. 500 times the capacity of Tesla
Mega pack battery & 1-2,000 times cheaper
Availability of fresh water
Groundwater is plentiful in the area for use as feedstock
for electrolysis
Infrastructure to deliver H2 to market
Network of ADX owned pipelines connected to local &
regional gas grid. Plan for “Hydrogen Backbone” in area
Investor Presentation – 9 October 2023
Windfarms surrounding ADX
Vienna Basin Fields
¹ on an energy equivalent basis (per MWh)
11
Anshof Field Development
Near Term Appraisal & Development Program
Summary of Near-term Activities
Fast track development
wells targeting high
productivity thick Eocene
reservoir areas
•
Continue production from successful Anshof-3 well
•
Drill and complete Anshof-2 targeting thicker sands with high angle well
(approx. 100m net reservoir intersection) and test 2(P) oil water contact
•
Install permanent production facility at Anshof-3 well location capable of
producing up to 4000 BOPD
•
Drill and complete Anshof-1 targeting thicker sands with high angle well
(approx. 90m net reservoir intersection) at crestal location
Increased production & reserves with capacity for further growth
Crestal Anshof-3
discovery well
25 km2 field area
Anshof -3 Area Top Eocene Oil Reservoir Map
ANS-2
BOPD
ANS-1
Existing
Anshof-3
Production
Drill
Anshof-2
Well
Drill
Anshof-1
well
Commence
Production
Anshof- 3&2
Install
permanent
production
facility
ANS-3
Q4 2024
Q3 2024
Q2 2024
Q1 2024
Q4 2023
Investor Presentation – 9 October 2023
Q3 2023
ANS-1,2 & 3
Surface
Location
Upper Austria Exploration
Portfolio is a pathway to exceptional
growth
12
Upper Austria Exploration
High impact, drill ready portfolio in the heart of Europe
1
2
3
4
1020 km2
807 bcfe1 World-class Welchau
acreage
gas prospect to be drilled in 2023.
20
Adjacent to tested gas discovery at Molln
2
Anshof near field, low risk follow
up oil prospect at GRB 9.5 mmbbl1
provides rapid pathway to further reserves
and cash flow
Multiple High Impact Gas
Prospects
3
3500 km2
4
3D Seismic
Infrastructure
Access
Prospects and new High Value
Shallow gas play identified with state of
the art AI seismic processing
ANSHOF
18 MW Geothermal low risk, long
1
term potential with shallow oil and gas
targets provides new opportunity
191 mmboe 1
1 3 to Cautionary Statement in relation to Prospective Resources on Page 3 of this presentation.
Refer
Investor Presentation – 9 October 2023
¹ Best Technical Prospective Resources Prospective resources reporting date update 22.06.2023
.
13
14
Upper Austria Exploration Value Offering
Proven basin with exceptional growth potential
ADX approaching the top of the value
pyramid for oil and gas in Upper Austria
Value realization at Anshof
✓
✓
2 new high productivity development wells to develop 5.2 1 mmbbls 2P gross reserves
Installation of permanent processing facility with 4000 bopd capacity
Value creation
Multi well exploration drilling program
✓
✓
At least 2 gas exploration wells will be drilled in the next 12 months funded by farmins
Follow up oil targets to Anshof and new shallow gas play identified with AI techniques
Value proposition
Large drill ready portfolio of oil and gas exploration prospects
✓
✓
Risk Reduction
Increasing value
Development drilling, increasing production and Reserves
213 2 MMBOE best estimate prospective resources
Funding and risk reduction via industry farmouts enabled by development of partnership structure
Identified Upper Austria as a Core Area
High exploration success rate, large 3D data set & infrastructure, high value hydrocarbons
✓
✓
Portfolio of exploration prospects proximal to strong markets for oil and gas
Knowledgeable, experienced local exploration team
Refer to Cautionary Statement in relation to Prospective Resources on Page 3 of this presentation.
Investor Presentation – 9 October 2023
1 ref. ASX release dated 31 October 2022, 2 Best technical prospective resources for Upper Austria only. Prospective resources reporting date update 22.06.2023
15
Welchau-1 Giant Gas Prospect
Preparation for drilling and multiple follow ups if successful
•
Drilling permit for Welchau-1 well has been secured with
commencement of drilling expected in Q4 2023
•
Research funding provided to University of Vienna for
collaborative assessment of Welchau area potential
•
Four Welchau follow up prospects generated in same
structural
setting
Welchau
Gas Prospect Anticline
Showing Mapping based on Surface Geology
World-class Welchau gas prospect
Adjacent to the Molln-1 gas discovery that tested condensate
rich gas in 1989. Shallow drill depth & 19 km from national
pipelines
The Welchau
Prospect
has 23 km lateral
extension,
Investor
Presentation
– 9 October
2023100 km² area and vertical relief of 2140 m (max.)
Welchau Gas Prospect
Prospective Recoverable Resources Estimates
Gas
Oil equivalent
Condensate
Total Oil Equivalent
Total Gas Equivalent
Mcf per BBl conversion used
Minimum
171
29
6.8
35
212
BCF
BOE
BBls
BOE
BCFE
6
Best Technical
651
108
26
134
807
Maximum
1315
219
52.6
272
1631
ASX Prospective Resources reporting date 22.06.2023
Refer to Cautionary Statement in relation to Prospective
Resources on Page 3 of this presentation.
Follow Up
1
Follow Up 24
WELCHAU-1
400 m gas column proven, 900m from
RFT, that flowed 3.8 mmscf/d for 16
days
Gas presence (proven or expected)
16
IRR–1 Gas Prospect
New work results in (+110%) resources increase
New technical interpretation using seismic responses indicative of
gas and nearby well data
IRR Prospect
Min
(P90)
Best Technical
Max
(P10)
Mmboe
1.6
6.3
13.1
Analysis of analogous gas reservoirs in nearby gas field has led to a
significant upward revision of expected possible gas net pay thickness
Bscf
10
38
79
•
•
3D seismic response similar to adjacent gas field which has produced
~155 bscf of gas
Expected Miocene deep water turbidite reservoirs have a proven flow
capacity of up to 45 mmscf/day
155 Bscf
gas field
155 Bscf existing field
IRR-1
IRR Prospect
IRR-1
Refer to Cautionary Statement in relation to Prospective Resources on Page 3 of this presentation.
Investor Presentation – 9 October 2023
17
Anshof Oil Field Satellite Prospects
De-risked with new work and Anshof success
GRB is now a low-risk, high reward oil appraisal project
ADX AT-II
•
Historic ASCH-1 well on structure proved oil flow to surface
•
Modern 3D seismic data and ADX structural interpretation that was tested on
Anshof demonstrates the old well has proven an oil leg of a large up dip
structure at GRB.
➢ The best technical prospective resource for GRB is 9.5 mmboe1
ANSHOF OIL
FIELD
ASCH-1
OIL
FLOW
GRB Prospect
Anshof-3 production operations
adjacent to GRB prospect
Top Eocene Sandstone
Oil Reservoir Depth
Refer to Cautionary Statement in relation to Prospective Resources on Page 3 of this presentation.
Investor Presentation – 9 October 2023
¹ Change relative to Best technical prospective resources from 21 April 2022 at 8.8 mmboe is mainly due to revised net thickness reservoir prediction mapping
18
New Trend of Low Risk, Shallow Gas Prospects
Portfolio addition from new ideas and state of the art techniques
New gas prospects have been matured
Combination of AI Software, an international team of
stratigraphic trap experts and local knowledge leading to
deep understanding of unexplored gas potential
• Large stratigraphic upside potential
• Proven high permeability reservoirs (10 mscfpd/well)
• Multiple additional prospects being generated
Prospect
Fluid
(Expected)
Best Technical
Recoverable
(MMboe)
Best Technical
Recoverable
(BScf if gas)
SCHOE
GAS
1.1
6.6
HOCH
GAS
0.8
4.8
GAST
GAS
0.6
3.6
ADX AT-I license
A.I. software on 3D seismic detects channels
and rivers as they flowed 22 Mio years ago
Investor Presentation – 9 October 2023
Refer to Cautionary Statement in relation to Prospective Resources on Page 3 of this presentation.
19
Geothermal Prospect with Oil and Gas Targets
The GMU prospect combines geothermal opportunity with multiple
overlying oil and gas targets defined on 3D seismic
Jurassic fractured
Geothermal opportunity (fractured Jurassic limestone) is a proven play in
proven limestone
the Molasse basin. 3D seismic attributes analysis indicating oil and gas
geothermal reservoir @
potential in stacked targets which can be accessed by a single well
110 deg C
• High productivity reservoirs with best technical resource 3.9 mmboe
•
Geothermal potential of 18 MW thermal power
•
Market opportunity for district heating and power generation
Top Malmian
depth structure
Map showing large many geothermal projects (blue
symbols) in Bavaria in same reservoir as GMU Project
GMU project
Source: Bavarian Ministry for Environment
3D Seismic attributes indicate gas in Miocene Sand
Stone Reservoirs with flow rate potential up to 45
mmscf/d
Molasse basin geothermal plant
in nearby Bavaria, Germany
Investor Presentation – 9 October 2023
Proven Jurassic fractured limestone
geothermal reservoir @ 110 deg C
Refer to Cautionary Statement in relation to Prospective Resources on Page 3 of this presentation.
ADX role in European Energy Transition
Well positioned in the near term as well as long term
Growth in Global Energy Demand
➢ Oil & gas demand continues to
increase
Pace of Transition to Date
The transition to renewables is taking
longer than expected
➢ Gas is a transition fuel in the EU
Financial and greenhouse reduction
benefits but gas supply is tight
➢ Oil and gas industry can make a
significant transition contribution
Geothermal, hydrogen & CO2 storage are
needed to achieve net zero goals
20
84% of global energy supplied by coal, oil and gas
“ADX Vienna Basin oil and gas fields are the potential site for a Green Hydrogen Production and
Storage Project and a Solar Park for self consumption and sales into power the grid”
InvestorPresentation
Presentation– –20
9 July
October
Investor
20232023
12
21
Complementary Renewable Energy Projects
Maximum potential with minimum fuss
Green H2 project
pilot phase
(Vienna Basin)
Green H2 project
scaleup phase
(Vienna Basin)
Solar power
project
(Vienna Basin)
Gmunden
geothermal project
(Upper Austria)
Production & storage of green
H2 at the Zistersdorf field
Production & storage of green H2
at the Zistersdorf field
Generation of renewable
electricity with PV plants
Geothermal as well as
oil & gas targets
2.5 MW electrolyser
30 MW electrolyser
1 or 2 PV plants considered
15 MW plant capacity potential
370 MT p.a. (green H2)
5,200 MT p.a. (green H2)
1.5 MWp initial capacity with
90% success rate for
possibility to ramp-up
geothermal wells in the area
Grid feed-in (additional
revenues) & self-consumption
Strong interest by local offtakers
75 GWh of storage capacity
100+ GWh of storage capacity
already identified
already identified
“Value add to Vienna Basin Fields using depleted reservoirs to store hydrogen,
facilities for production and land to install PV plants”
Investor Presentation – 9 October 2023
“Drill wells with multi
target potential”
22
The ADX Team
Our Team
Experience of our Board and Management Team
Mr Ian Tchacos
Executive Chairman
35 years oil and gas professional - Petroleum
Engineer, Operations & Corporate Development
Mr Paul Fink
CEO and Executive Director
30 years oil & gas professional - Geohysicist, New
Ventures & Exploration Management
Mr Andrew Childs
Non-Executive Director
35 years oil and gas professional - Geoscientist,
Corporate Development
Mr Edouard Etienvre
Non-Executive Director
20 years oil and gas professional - Finance &
Corporate Development
Ms Amanda Sparks
Finance Manager & Co Company
Secretary
20 years oil and gas professional - Finance &
Company Secretarial, Chartered Accountant
Mr Peter Ironside
Co Company Secretary
35 years resources professional - Finance,
Chartered Accountant & Corporate Development
Mr Alan Reingruber
Managing Director ADX VIE
20 years oil and gas professional - Reservoir
Engineer, Operations and Corporate
Investor Presentation – 9 October 2023
A highly experienced management team with a proven track
record of initiating, operating and developing international
energy projects.
23
Near Term Activities
01
03
05
Anshof-2 and
Anshof-1 appraisal
and development
Wells
Further Farm in
Transactions
Additional Gas
Prospect drilling
Strong industry interest to
fund additional drilling
activity in Upper Austria
High impact gas prospects
and shallow high value
targets proximal to
infrastructure
Increase production rate by
300 bopd per well
02
Drill the Giant
Welchau-1 Gas
Prospect
807 Bcfe 1 potential
adjacent to the Molln-1 gas
discovery that tested
condensate rich gas in 1989
04
Renewable
Energy Project
Feasibility
Progress technical
definition for value
adding complementary
projects
Refer to Cautionary Statement in relation to Prospective Resources on Page 3 of this presentation.
Investor Presentation – 9 October 2023
¹ Best Technical Prospective Resources Prospective resources reporting date update 22.06.2023
Thank you for your
attendance
For further information contact:
ASX: ADX
Ian Tchacos
Executive Chairman
ian.tchacos@adxenergy.com.au
adx-energy.com
Paul Fink
Chief Executive Officer
paul.fink@adx-energy.com
Amanda Sparks
Finance Manager & Company Secretary
amanda.sparks@adxenergy.com.au
24
Connect with Us
Better energy
A cleaner smarter future for Europe
Share your feedback
Discover