Essential Energy Conference
AN ASX LISTED EUROPEAN ENERGY
PRODUCER AND EXPLORER
18 September 2024
I n v e s t o r
P r e s e n t a t i o n
ASX:ADX
adxenergy.com.au
DISCLAIMER (CAUTIONARY) STATEMENT
IMPORTANT NOTICE:
This document has been prepared by ADX Energy Ltd (“ADX”) for the purpose of providing information to
interested analysts, investors and shareholders. Any statement, opinions, projections, forecasts or other
materials contained in this document do not constitute any commitments, representations or warranties
by ADX or its directors, agents and employees.
Except as required by law, and only to the extent so required, directors, agents and employees of ADX
shall in no way be liable to any person or body for any loss, claim, demand, damages, costs or expenses
of whatsoever nature arising in any way out of, or in connection with, the information contained in this
document. This document includes certain statements, opinions, projections, forecasts and other
material, which reflect various assumptions. The assumptions may or may not prove to be correct. ADX
recommends that potential investors consult their professional advisor(s) as investment in the company is
considered to be speculative in nature.
The information in this presentation is in summary form only and does not contain all the information
necessary to fully evaluate any transaction or investment. It should be read in conjunction with ADX’
other periodic and continuous disclosure announcements lodged with the ASX. This document does not
constitute an offer, invitation or recommendation to subscribe for or purchase securities and does not
form the basis of any contract or commitment.
Pursuant to the requirements of the ASX Listing Rule 5.41 and 5.43 the technical and Prospective
Resources information relating to Austria and Italy contained in this presentation has been reviewed by
Paul Fink as part of the due diligence process on behalf of ADX. Mr. Fink is Technical Director of ADX
Energy Ltd is a qualified geophysicist with 30 years of technical, commercial and management
experience in exploration for, appraisal and development of oil and gas resources. Mr. Fink is a member
of the EAGE (European Association of Geoscientists & Engineers) and FIDIC (Federation of Consulting
Engineers). ADX confirms that it is not aware of any new information or data that may materially affect
the information included in the relevant market announcements for reserves or resources and that all
material assumptions and technical parameters underpinning the estimates in the relevant market
announcements continue to apply and have not materially changed. As noted on slide 3, the Prospective
Resources include the Welchau Gas Liquids Discovery which are currently under review. The Company’s
Prospective Resources estimates will be revised following the update of Welchau Prospective Resources
estimates and the update of other prospects in ADX’ Austrian exploration portfolio.
Independent audit of developed reserves have been completed for ADX’ Zistersdorf and Gaiselberg fields
(“Fields”) in the Vienna basin and Anshof in Upper Austria (Austria) by RISC Advisory Pty Ltd (“RISC”).
RISC conducted an independent audit of ADX’ Fields evaluations, including production forecasts, cost
estimates and project economics. Production from existing wells is classified as Developed Producing.
Production from planned recompletion of existing wells to new intervals is classified as Developed NonProducing. RISC is an independent advisory firm offering the highest level of technical and commercial
advice to a broad range of clients in the energy industries worldwide. RISC has offices in London, Perth,
Brisbane and South-East Asia and has completed assignments in more than 90 countries for over 500
clients and has grown to become an international energy advisor of choice.
PRMS RESERVES CLASSIFICATIONS USED IN THIS PRESENTATION:
Developed Reserves are quantities expected to be recovered from existing wells and facilities.
Developed Producing Reserves are expected to be recovered from completion intervals that are open and
producing at the time of the estimate.
Developed Non-Producing Reserves include shut-in and behind-pipe reserves with minor costs to access.
Undeveloped Reserves are quantities expected to be recovered through future significant investments.
A. Proved Reserves (1P) are those quantities of Petroleum that by analysis of geoscience and engineering data,
can be estimated with reasonable certainty to be commercially recoverable from known reservoirs and under
defined technical and commercial conditions. If deterministic methods are used, the term “reasonable certainty”
is intended to express a high degree of confidence that the quantities will be recovered. If probabilistic methods
are used, there should be at least a 90% probability that the quantities actually recovered will be equal or
exceed the estimate.
B. Probable Reserves are those additional Reserves which analysis of geoscience and engineering data indicate
are less likely to be recovered than Possible Reserves. It is equally likely that actual remaining quantities
recovered will be greater than or less than the sum of the estimated Proved plus Probable Reserves (2P). In this
context, when probabilistic methods are used, there should be at least a 50% probability that the actual
quantities recovered will equal or exceed the 2P estimate.
C. Possible Reserves are those additional Reserves that analysis of geoscience and engineering data suggest are
less likely to be recoverable that Probable Reserves. The total quantities ultimately recovered from the project
have a low probability to exceed the sum of Proved plus Probable plus Possible (3P) Reserves, which is equivalent
to the high-estimate scenario. When probabilistic methods are used, there should be at least a 10% probability
that the actual quantities recovered will equal or exceed the 3P estimate. Possible Reserves that are located
outside the 2P area (not upside quantities to the 2P scenario) may exist only when the commercial and technical
maturity criteria have been met (that incorporate the Possible development scope). Standalone Possible Reserves
must reference a commercial 2P project.
PROSPECTIVE RESOURCE CLASSIFICATIONS USED IN THIS PRESENTATION:
Prospective Resources are those estimated quantities of petroleum that may potentially be recovered by the
application of a future development project(s) related to undiscovered accumulations. These estimates have
both an associated risk of discovery and a risk of development. Further explorations appraisal and evaluation is
required to determine the existence of a significant quantity of potentially moveable hydrocarbons.
P(90) Estimate or Low Estimate: means at least a 90% probability that the quantities actually recovered will
equal or exceed the estimate.
P(50) Estimate or Best Estimate: means At least a 50% probability that the quantities actually recovered will
equal or exceed the estimate.
P(10) Estimate or High Estimate: means At least a 10% probability that the quantities actually recovered will
equal or exceed the estimate.
OIL AND GAS CONVERSIONS
BOE means barrels of oil equivalent. Bcfe means billion of cubic feet of gas equivalent. Gas to oil conversion used
in this presentation: 6 mcf of gas = 1 barrel of oil. Mcf means thousand cubic feet of gas
ADX Energy (ASX: ADX) | Investor Presentation | September 2024
2
INVESTMENT PROPOSITION AND OPERATING STRATEGY
Increasing
Operating
Cashflow
231 boepd net
oil & gas production1
Reserves and
Production
Growth from
New Discovery
Value Adding,
World-class
Complementary
Exploration
Renewable
Portfolio in the
Projects
heart of Europe
1.64 mmbbl 2P Reserves @
Vienna Basin Fields only. Anshof
Field subject to review 2
Operating
Capability
Fully Funded
Work Program
Ability to
generate and
operate
projects
Funded by
Farmouts
213 mmboe
3
Prospective Resources
A$13.5M
placement
47 MW combined
renewable energy
potential
Prospective Resources are those estimated quantities of petroleum that may potentially be recovered by the application of a future development project(s)
related to undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development. Further explorations appraisal and
evaluation is required to determine the existence of a significant quantity of potentially moveable hydrocarbons.
The Prospective Resources include the Welchau Gas Liquids Discovery which are currently under review. The Company’s Prospective Resources estimates will be
revised following the update of Welchau Prospective Resources estimates and the update of other prospects in ADX’ Austrian exploration portfolio.
1 Q2
2024 average production from the Zistersdorf & Gaiselberg fields and Anshof field. 2 ref. Reserves Reporting Date & Valuation (Independently Audited) 04.11.2021 less production to 31 December 2023, 3 Best technical
Prospective Resources for Upper Austria only. Prospective Resources reporting date update 22.06.2023
ADX Energy (ASX:ADX) | Investor Presentation | September 2024
3
OPERATING AND FINANCIAL HIGHLIGHTS
OPERATING AND FINANCIAL HIGHLIGHTS
Operationally ready and fully
funded for appraisal, exploration
and testing program
2024 Operations Program
Capital Structure
ASX: ADX
FRA: GHU
Number of Shares on Issue
568.7M
Options
115.7M
Market Capitalisation (@ 11 cents on 16-09-24)
A$62.6M
Cash at Bank (unrestricted 30 June 2024)
A$12.6M
Debt (net of restricted cash for debt)
A$1.6 M
Enterprise Value
A$51.6M
1
2
Drill Anshof-2A Oil Appraisal Well
Targeting thicker and high porosity Eocene reservoirs in extension of closure
proven by Anshof-3 producing well. Successful well just drilled that will lead
to increased production in a few weeks. - September 2024
Drill LICHT-1 Gas Exploration Well
High impact, rapid tie-in play opening well in ADX-AT-I licence – Funded
by MND co-investment
October 2024
3
Test Welchau-1 Discovery
Extended production testing of potentially large liquids- rich gas discovery
October 2024 to March 2025
ADX Energy (ASX: ADX) | Investor Presentation | September 2024
4
HIGH IMPACT OPERATIONS PROGRAM FOCUSSED ON UPPER AUSTRIA
1
2
3
Oil appraisal well with
large potential
production impact into
new onsite 3,000 BPD
processing facility.
ADX-AT-I gas
exploration well, with
play opening potential
funded by recent
farmout.
Test gas & liquids
production potential
from 450 m of
hydrocarbon shows in
multiple, carbonate
reservoirs.
1022 km2
licence area with
50% historical
success rate
Successful well now being
prepared for production.
Mostly produced Oil and Gas Field province
2 LICHT-1
1 ANS-2A
ANSHOF
3 WEL-1
Additional Prospect detailing underway
using 3D seismic. More announcements
as we progress.
ADX Energy (ASX: ADX) | Investor Presentation | September 2024
5
ANSHOF-2A SIDETRACK OIL APPRAISAL WELL
WELL SPUDDED IN EARLY SEPTEMBER 2024 WITH 6.5 M OIL COLUMN INTERSECTED – PARTLY FUNDED BY MND FARMOUT
ADX economic interest (EI) in Anshof-2A is
60%, MND EI is 40%.
ANS-2A up-dip
location
The Anshof-2A sidetrack will target high
quality reservoir up dip of Anshof-2.
Well cost minimised by using existing ANS-2
well bore to side track below 9 5/8” casing.
3,000 bpd permanent production unit
installed & commissioned onsite in Apr-24.
ANS-3 production recommenced during the
June-24 quarter (~110 bopd).
Log Cross Section
ADX believes that all valid closures in the
area are filled to spill with oil.
ANS-3 vs ANS-2 Wells
Comparison
Net thickness: 2m vs 12m
Average porosity: 12% vs 15%
Anshof Permanent Production Facility at ADX’s Anshof-3 location
Potential for a muchenhanced oil productivity
for ANS-2A vs ANS-3
ADX Energy (ASX: ADX) | Investor Presentation | September 2024
6
ANSHOF-2A SIDETRACK OIL APPRAISAL WELL – THE RESULT
6.5 m oil column intersected by the Anshof -2A Oilfield Appraisal well.
Long term well production test in preparation.
Remapping of the field also commencing with benefit of extra data point.
A-3
A-2A
A-2
OWC
Existing
producer
Shows connection with
producer Anshof -3 area,
enhanced reservoir with
6.5m oil column (vs 2m
in A-3).
To be
completed
as 2nd
Producer
Shows a comparison of the Eocene sand thickness (shown in yellow) encountered in the Anshof-3 well
Anshof Permanent Production Facility at ADX’s Anshof-3 location
(LHS), the ANS-2A well (Middle) and the Anshof-2 well (RHS)
ADX Energy (ASX: ADX) | Investor Presentation | Operations Update | August 2024
7
LICHT-1 EXPLORATION WELL (ADX MINIMUM 50% INTEREST)
DRILLING OF LICHT-1 TO COMMENCE IN OCTOBER 2024 WITH EXTENSIVE FOLLOW UP POTENTIAL
Prospect already permitted and rig being contracted
to drill LICHT-1.
LICHT’s resource estimate upgraded based on
updated mapping from 3D reprocessing and a review
of reservoir distribution. and quality. Best Estimate
Prospective Resources of 21.1 Bcf*¹ with the
discovery of hydrocarbons assessed as low risk.
ADX economic interest (EI) in LICHT-1 is 50%, MND
EI is 50%.
Anticlinal P90 closure with a seismic anomaly that
may represent direct evidence of gas fill
Positioned along a mapped, sand delivery trend.
Further targets deeper.
Target depth of 2,295 m TVD costed at A$8.5 MM
(EURO 5.1 MM) dry hole & also subject to MND’s EIA
funding.
With success at LICHT-1 there are 3 low risk followup prospects nearby to LICHT and near existing
facilities.
LICHT Prospective Resource
LICHT-001
Uplifted with high
amplitude
character
Follow-up
prospect
Proven
reservoir
Interpreted
sand-prone
trend
LICHT-001
Estimates (EUR Bcf)
*Refer to Cautionary Statement in Slide 2 and 3 of this presentation. ¹
Original Prospective Resources reporting date 22.06.2023, updated
20.08.2024.
LOW
7.6
BEST
21.1
HIGH
56
ADX Energy (ASX: ADX) | Investor Presentation | September 2024
8
TESTING OF WELCHAU-1 GAS LIQUIDS DISCOVERY
MULTI - ZONE PRODUCTION TEST PROGRAM COMMENCING IN OCTOBER 2024
ADX economic interest (EI) in Welchau
is 75%, MCF Energy EI is 25%.
Testing program design is intended to
determine hydrocarbon type,
productivity and resource potential.
Multiple tests expected across 450 m of
hydrocarbon shows intersected over
three carbonate formations.
Permitting submitted for testing
operations between 1 October 2024 to
31 March 2025.
Forward work program prior to testing
includes:
Finalisation of testing program
Welchau resource update
Resource potential of Welchau
deeper reservoirs and follow-up
prospects
Austrian Alps:
Giant Welchau 100 km2
Triassic Reservoir anticline
Welchau-1
Molln-1
(1989 Gas Discovery
flowed - 4.0 MMCFD)
Welchau anticline structure, including a 2D seismic line and the
geology draped over the digital elevation model
ADX Energy (ASX: ADX) | Investor Presentation | September 2024
9
KEY VALUE DRIVERS
Large gas and liquid resource potential at an
onshore location in premium energy market.
Excellent availability of infrastructure for gas
(18 km) and liquids (40 km).
Shallow and relatively low drilling costs.
Relatively short development time frames
especially in the case of liquids.
Excellent demand and pricing for gas (Dutch
TTF) & liquids (Brent).
Deeper exploration potential in Welchau well.
Play opening discovery with multiple follow up
targets.
Welchau Profitability Index Ratio¹ vs other
gas projects in Europe
4.00
Profitability Index Ratio based on
NPV10
WELCHAU ECONOMIC CHARACTERISTICS
3.50
Welchau generates superior
3.00
economics to other gas projects in
Europe
2.50
2.00
3.92
5.5 times higher PIR2
1.50
1.00
0.79
0.50
0.00
Welchau (Austria)
0.65
Pensacola (U.K. North Sea)
Colle Santo (Italy)
Welchau
Pensacola3
Colle Santo4
Location
Austria (onshore)
U.K. (offshore)
Italy (onshore)
Gross resources
55 mmboe (1U)
51 mmboe (2C)
11 mmboe (2P)
Gross CAPEX
USD 177 mil.
US$ 884 mil.
US$ 95 mil.
Gross NPV10
USD 694 mil.
US$ 663 mil.
US$ 62 mil.
Refer to Cautionary Statement in relation to Prospective Resources on Page 2 of this presentation
European Gas Market Trends
Piped gas supplies from Russia
increasingly unreliable and
politically undesirable
Imported LNG or increased
domestic supply only credible
alternatives to Russian gas
Current European gas price
(US$17.50 per mcf equiv.)
8 times higher than in the USA*
* Based on Dutch TTF & US pricing on 16 Aug 2024
87% of Austria’s gas is
imported and 65% sourced
from Russia in 2023
Supplied via Ukraine
¹ Profitability Index (or PIR) calculated as project NPV10 divided by project CAPEX. 2 PIR based on NPV10 at EUR 40 per MWh or equivalent.3 Source: Deltic Energy Plc. 4 Source: Reabold Resources Plc
ADX Energy (ASX:ADX) | Investor Presentation | September 2024
10
MULTIPLE LOW TO MEDIUM RISK GAS TARGETS IN ADX’ WESTERN, AT-I ACREAGE
(ADX MINIMUM 50% INTEREST – IT’S NOT JUST ABOUT THE IMPENDING LICHT-1!)
ADX has mapped > 10, shallow and deeper drill, gas Leads and Prospects in the ADX-AT-I licence area.
A large portion of the ADX-AT-I area is subject to a partnership with MND which will largely fund the next well, earning a
50% EI with the remainder of the ADX-AT-I area held by ADX 100%.
ADX-AT-I area is mostly covered by 3D seismic that is being reprocessed by ADX.
Using the 3D data, resource estimates are being re-evaluated for all the currently mapped Leads and Prospects.
Drilling of the first well targeting this prospectivity, LICHT-1, will commence in October 2024.
As the Company’s work progresses in 2024 there will be further data releases updating the status of each drill target.
Multiple
Attractive Gas
Prospects
already
mapped
Updates Coming
LICHT-1
Commencement of
drilling October 2024
Results expected
~2 weeks after spud
Mapping
trends with
reprocessed 3D
seismic
Results announced as
work completed
Many of the Prospects
mapped by ADX are lookalikes to existing gas
fields in the area and
display seismic amplitude
anomalies that are
interpreted as gas
charged
ADX Energy (ASX: ADX) | Investor Presentation | September 2024
11
ADX-AT-I PROSPECTIVITY (ADX MINIMUM 50% INTEREST)
DRILLING OF LICHT-1 TO COMMENCE IN OCTOBER 2024 WITH EXTENSIVE FOLLOW UP POTENTIAL
Prospect already permitted and rig being contracted to drill LICHT-1.
An upgrade to LICHT’s estimated resources has resulted from updated mapping with the benefit of the 3D.
reprocessing and a review of reservoir distribution and quality¹.
Plus, other 3D- covered,
High POS Prospects
Mature Gas Field province
ADX-AT-I
LICHT
- 2024 DRILL PROSPECT
Resource Estimates
EUR Bcf
LOW
BEST
HIGH
7.6
21.1
56
STOET, HERR & GOLL
– 3 LICHT FOLLOW-UP PROSPECTS
Resource estimates to be updated. The 3 prospects
combined are estimated on a preliminary basis to have
resource potential double the size of the LICHT
prospect.
*Refer to Cautionary Statement in Slide 2 and 3 of this presentation. ¹ Original Prospective Resources reporting date 22.06.2023, updated 20.08.2024.
ADX Energy (ASX: ADX) | Investor Presentation | September 2024
12
FOLLOW UP PROSPECTS TO A LICHT-1 DISCOVERY
N
A
S
A
A
LICHT Prospect
HERR Prospect
B
IRR
LICHT Prospect
A
A
BB LICHTENBERG
HERR
STOET
HERR
Proven reservoir
W
BB
LICHT
LICHT-001 Prospect
(prosp.)
STOET-001 (prosp.)
STOET Prospect
Flysch & Helvetic imbricates
E
Two leads (STOET, HERR) are mapped on the same
seismic reflector as that of the LICHT prospect as
structural highs.
A LICHT-1 discovery would significantly upgrade
these Leads to Prospects together with GOLL (Refer
Slide 11).
Lower Puchkirchen Fm.
A preliminary Best Estimate Prospective Resource
for the total of the 3 prospects could be more than
double that of LICHT.
Seismic reprocessing (PSTM & PSDM) is currently being
undertaken to further de-risk these leads.
PSTM seismic
*Refer to Cautionary Statement in Slide 2 and 3 of this presentation.
ADX Energy (ASX: ADX) | Investor Presentation | September 2024
13
ACTIVE WORK PROGRAM IN UPPER
AUSTRIA
RED drilling rig at the Anshof-3
well in ADX’s Upper Austria
licence
Overview of Near-Term
News flow
WELCHAU
ANSHOF 2A
Welchau well testing
planning and
resources update
Completion and tie-in
of well, ahead of new
commercial
production
Late September
2024
October 2024
LICHT-1 GAS
EXPLORATION
WELL
Commencement of
drilling LICHT-1 gas
exploration well
Early October 2024
Results expected
~4 weeks after
WELCHAU
Commencement of
Welchau well testing
program
Early October
2024
Ongoing results
across multiple zone
testing program
ADX Energy (ASX: ADX) | Investor Presentation | September 2024
14
PLEASE ALSO
CONSIDER
THIS ABOUT
ADX…..
ADX Energy (ASX: ADX) | Investor Presentation | September 2024
15
Austria is a Tier 1 jurisdiction –
a significant hydrocarbon
province with excellent
infrastructure & HIGH market
values
Gas currently US$17.50/Mcf
meaning highly profitable reserves
ADX already has cash flow
and is in a Basin Master position
with access to:
•
Valuable 3D seismic, access to
infrastructure; and
• Well trained “Boots On The
Ground”
ADX is only the third
Hydrocarbon Production and
Exploration Company to Operate
in Austria in some 75 years
Austria is highly dependent on
imports and vulnerable to supply
interruptions to Russian gas
Austrian Government Support
• Discoveries can become producers
quickly by comparison with anywhere
but a few parts of the USA
• Domestically sourced, responsibly
produced oil and gas to reduce
foreign reliance with over 70% of the
Country’s energy being imported
All ADX’s predecessors have
been very large Companies,
thus creating an ideal
environment for a smaller,
flexible and ambitious Company
to enter
ADX has so far, already
drilled 3 out of 4 new field
discovery and field appraisal
wells
Additional exploration drilling is
set to begin in October 2024
Our dependence on Russian natural gas threatens the prosperity, security and future of our country. Our goal is to get out
of Russian natural gas. As a sovereign country, we cannot simply accept that the share of Russian gas increases instead of
decreases. That is why we will now present the next measures” Leonore Gewessler, Climate Protection & Energy Minister
ADX Energy (ASX: ADX) | Investor Presentation | September 2024
16
Thank You
For further information:
Ian Tchacos
Executive Chairman
ian.tchacos@adxenergy.com.au
Paul Fink
Chief Executive Officer
paul.fink@adx-energy.com
Amanda Sparks
Finance Manager & Company Secretary
amanda.sparks@adxenergy.com.au
17
ASX: ADX
adxenergy.com.au
Connect with Us
Share your feedback
Discover