Current activities and near-term focus
Rapid cash flow build and positioning for high impact growth
A European Focussed
Producer and Explorer
2
ASX:
ADX
Corporate Presentation | June 2026
DISCLAIMER
2
Cautionary Statement
IMPORTANT NOTICE:
This document has been prepared by ADX Energy Ltd (“ADX”) for the purpose of providing information to interested
analysts, investors and shareholders. Any statement, opinions, projections, forecasts or other materials contained in this
document do not constitute any commitments, representations or warranties by ADX or its directors, agents and employees.
Except as required by law, and only to the extent so required, directors, agents and employees of ADX shall in no way be
liable to any person or body for any loss, claim, demand, damages, costs or expenses of whatsoever nature arising in any
way out of, or in connection with, the information contained in this document. This document includes certain statements,
opinions, projections, forecasts and other material, which reflect various assumptions. The assumptions may or may not
prove to be correct. ADX recommends that potential investors consult their professional advisor(s) as investment in the
company is considered to be speculative in nature.
The information in this presentation is in summary form only and does not contain all the information necessary to fully
evaluate any transaction or investment. It should be read in conjunction with ADX’ other periodic and continuous disclosure
announcements lodged with the ASX. This document does not constitute an offer, invitation or recommendation to subscribe
for or purchase securities and does not form the basis of any contract or commitment.
Pursuant to the requirements of the ASX Listing Rule 5.41 and 5.43 the technical and Prospective Resources information
relating to Austria and Italy contained in this presentation has been reviewed by Paul Fink as part of the due diligence
process on behalf of ADX. Mr. Fink is Technical Director of ADX Energy Ltd is a qualified geophysicist with 30 years of
technical, commercial and management experience in exploration for, appraisal and development of oil and gas resources.
Mr. Fink is a member of the EAGE (European Association of Geoscientists & Engineers) and FIDIC (Federation of
Consulting Engineers). ADX confirms that it is not aware of any new information or data that may materially affect the
information included in the relevant market announcements for reserves or resources and that all material assumptions and
technical parameters underpinning the estimates in the relevant market announcements continue to apply and have not
materially changed.
Independent audit of developed reserves have been completed for ADX’ Zistersdorf and Gaiselberg fields (“Fields”) in the
Vienna basin and Anshof in Upper Austria (Austria) by RISC Advisory Pty Ltd (“RISC”). RISC conducted an independent
audit of ADX’ Fields evaluations, including production forecasts, cost estimates and project economics. Production from
existing wells is classified as Developed Producing. Production from planned recompletion of existing wells to new intervals
is classified as Developed Non-Producing. RISC is an independent advisory firm offering the highest level of technical and
commercial advice to a broad range of clients in the energy industries worldwide. RISC has offices in London, Perth,
Brisbane and South-East Asia and has completed assignments in more than 90 countries for over 500 clients and has
grown to become an international energy advisor of choice.
PRMS RESERVES CLASSIFICATIONS USED IN THIS PRESENTATION:
Developed Reserves are quantities expected to be recovered from existing wells and facilities.
Developed Producing Reserves are expected to be recovered from completion intervals that are open and producing at the
time of the estimate.
Developed Non-Producing Reserves include shut-in and behind-pipe reserves with minor costs to access.
Undeveloped Reserves are quantities expected to be recovered through future significant investments.
A. Proved Reserves (1P) are those quantities of Petroleum that by analysis of geoscience and engineering data, can be
estimated with reasonable certainty to be commercially recoverable from known reservoirs and under defined technical and
commercial conditions. If deterministic methods are used, the term “reasonable certainty” is intended to express a high degree
of confidence that the quantities will be recovered. If probabilistic methods are used, there should be at least a 90% probability
that the quantities actually recovered will be equal or exceed the estimate.
B. Probable Reserves are those additional Reserves which analysis of geoscience and engineering data indicate are less
likely to be recovered than Possible Reserves. It is equally likely that actual remaining quantities recovered will be greater than
or less than the sum of the estimated Proved plus Probable Reserves (2P). In this context, when probabilistic methods are
used, there should be at least a 50% probability that the actual quantities recovered will equal or exceed the 2P estimate.
C. Possible Reserves are those additional Reserves that analysis of geoscience and engineering data suggest are less likely
to be recoverable that Probable Reserves. The total quantities ultimately recovered from the project have a low probability to
exceed the sum of Proved plus Probable plus Possible (3P) Reserves, which is equivalent to the high-estimate scenario. When
probabilistic methods are used, there should be at least a 10% probability that the actual quantities recovered will equal or
exceed the 3P estimate. Possible Reserves that are located outside the 2P area (not upside quantities to the 2P scenario) may
exist only when the commercial and technical maturity criteria have been met (that incorporate the Possible development
scope). Standalone Possible Reserves must reference a commercial 2P project.
PROSPECTIVE RESOURCE CLASSIFICATIONS USED IN THIS PRESENTATION:
Prospective Resources are those estimated quantities of petroleum that may potentially be recovered by the application of a
future development project(s) relate to undiscovered accumulations. These estimates have both an associated risk of discovery
and a risk of development. Further explorations appraisal and evaluation is required to determine the existence of a significant
quantity of potentially moveable hydrocarbons.
P(90) Estimate or Low Estimate: means at least a 90% probability that the quantities actually recovered will equal or exceed
the estimate.
P(50) Estimate or Best Estimate: means At least a 50% probability that the quantities actually recovered will equal or exceed
the estimate.
P(10) Estimate or High Estimate: means At least a 10% probability that the quantities actually recovered will equal or exceed
the estimate.
OIL AND GAS CONVERSIONS
BOE means barrels of oil equivalent. Bcfe means billion of cubic feet of gas equivalent. Gas to oil conversion used in this
presentation: 6 Mcf of gas = 1 barrel of oil. Mcf means thousand cubic feet of gas
Corporate Presentation I 17 September 2026
Corporate Presentation I 18 November 2026
3
ASX:
ADX
Corporate Presentation | June 2026
HIGH VALUE EUROPEAN ENERGY PORTFOLIO
3
Increasing production base and transformational exploration in premium energy markets *
Key Asset and Market Attributes
High value hydrocarbons - Brent & CGH gas price 1
Excellent access to infrastructure
Seismic and well data base availability
Rapid licencing in pro-development jurisdictions
Increased focus on gas
Vienna Basin Oil Fields | Austria
Anshof Oil Field | Upper Austria
Upper Austria Exploration Assets
Sicily Channel Permit | Italy
Production Licence | Romania
* ADX operated production & exploration assets
1 Central European Gas Hub
Three new
applications
“Building production base to achieve critical mass and unlock value of high impact exploration”
Corporate Presentation I 18 November 2026
4
ASX:
ADX
Corporate Presentation | June 2026
COMPANY OVERVIEW
4
Increasing production, near term reserve growth and high-impact gas exploration
EXPLORATION PORTFOLIO RESOURCES
NET to ADX MMBOE – P(MEAN)
1 30 September 2026 Quarter Ended average,
2 Unaudited Reserves on 31 December 2025
3 Prospective Resources reporting date update 9.11.2026; see slide 21
4 Prospective Resources reporting date update 2.12.2025; see slide 21
5 Reporting date on 9.11 2026; see slide 21
Austrian Current Production (Sept 26 QTR)
242 BOEPD 1
Austrian Exploration Portfolio
579 BCF Gas & 59 MMBBL Oil 3
Sicily Channel Gas Permit
619 BCF Gas 4
Multiple Farmouts
Accelerate programs & reduce risk
Operating Capability
Generate, Explore & Develop
Austrian 2(P) Reserves
1.47 MMBOE 2
Vienna Basin Fields
High Equity Interests
Ability to control program and transact
EXPLORATION PORTFOLIO RESOURCES
NET to ADX MMBOE – P(MEAN)
Upper Austria – Gas
97 MMBOE
Sicily Channel – Gas
103 MMBOE
Upper Austria – Oil
59 MMBBL Total – 259 MMBOE5
Portfolio - 77% Gas / 23% Oil
Approx. 1.2 TCF P(Mean) GAS 5 in portfolio
Current gas price is US$183 per BOE
23 October 2026
CAUTIONARY STATEMENT:
Prospective Resources are those estimated quantities of petroleum that may potentially be
recovered by the application of a future development project(s) relate to undiscovered
accumulations. These estimates have both an associated risk of discovery and a risk of
development. Further explorations appraisal and evaluation is required to determine the
existence of a significant quantity of potentially moveable hydrocarbons.
Corporate Presentation I 18 November 2026
5
ASX:
ADX
Corporate Presentation | June 2026
BOARD, CAPITAL STRUCTURE AND CORPORATE OVERVIEW
5
Experienced leadership team with relevant experience and local relationships
Board & Senior Management Team
Ian Tchacos
B.Eng (Mech.) & Grad.Dip (Chem Eng)
Executive Chairman
Petroleum engineer with more than 30 years of international oil and gas experience spanning
corporate strategy, M&A, exploration, development, production operations and energy finance.
Former Managing Director of Nexus Energy, where he led its growth from a micro-cap explorer
to an ASX Top 200 producer and operator.
Paul Fink
Msc (Geophysics)
CEO & Executive Director
Petroleum industry executive and geophysicist with over 25 years of international exploration
and production experience across Europe, North Africa, Asia and Australia. Former senior
manager with OMV and Vice President of Focus Energy, where he helped deliver a major
exploration success and the IPO of Indus Gas on the London Stock Exchange.
Edouard Etienvre
MSc (Management)
Non-Executive Director
Energy and natural resources executive with over 20 years of experience across oil & gas,
mining, shipping and offshore sectors. Brings extensive expertise in commercial strategy,
business development, financing, M&A, project management and transaction structuring.
Dave Gilbert
MSc (Petroleum Geology)
Non-Executive Director
Highly experienced petroleum geologist with more than 35 years in exploration and production,
including senior roles with Petrofina, Apache and OMV. Extensive expertise in exploration
strategy, new ventures, project execution and managing international E&P operations across
Europe, North Africa and Asia-Pacific.
Alan Reingruber
MSc (Petroleum Engineering)
Managing Director,
ADX VIE GmbH
Petroleum engineer with 20 years of exploration and production experience in Austria. Former
senior executive with RAG Austria, where he managed oil assets and later led the company's
exploration and production business before joining ADX following the acquisition of RAG
assets.
Peter Ironside
Company Secretary
Chartered Accountant and corporate governance specialist with more than 40 years'
experience in the resources sector. Extensive expertise in financial management, compliance,
capital raisings and ASX-listed company administration, including involvement in several
successful corporate transactions.
Amanda Sparks
Company Secretary
Chartered Accountant and Fellow of FINSIA with over 30 years of resources industry financial
experience. Specialist in company secretarial services, financial management, capital raisings,
corporate transactions, governance and compliance for listed companies.
Corporate Overview
ASX listed oil & gas exploration and production company with
European focus
Board comprised of international experienced, energy specialists
Corporate HQ in Perth, Australia and European operating office in
Vienna, Austria
Capital Structure
Ticker
ASX: ADX
FRA: GHU
Share price (at 17 November 2026) A$0.011
Number of shares 1088m
Number of options 462m
Market capitalisation A$12.0M
Cash (unrestricted) at 30 September 2026 A$2.3M
Debt A$0.8M
Enterprise value A$10.5M
Number of shareholders 2,078
Corporate Presentation I 18 November 2026
6
ASX:
ADX
Corporate Presentation | June 2026
EUROPEAN GAS FUNDAMENTALS – Resulting from years of energy denial
6
Longterm supply vulnerability, pricing volatility and over dependence on US shale-gas LNG
Russia (piped)
Russia (LNG)
Norway (LNG)
Norway (piped)
U.S.A. (LNG)
Algeria (LNG)
Algeria (piped)
Other (LNG)
U.K.
Azerbaijan
Libya
90%
of supply
is
imported
EU gas supply mix1
1 Source: Bruegel; 2 Methane, Reporting and Verification of CH4 and CO2
10% of Europe’s gas is produced domestically
33% of supply imported from Norway
46% of supply imported as LNG from USA and
Middle East
Russia still makes up 12% of supply mix
High dependence on imported gas
Lack of investment in domestic gas exploration and dependence on Russian gas
Supply vulnerability and gas price volatility
European and Asian gas prices impacted long term by Qatar facilities destruction
Long term structural and policy trends
Russian gas banned from EU by November 2027 (by legislative decree)
EU methane regulation creates a structural premium for low methane intensity gas
(MRV2 compliance). Up to 43% of EU gas imports at non-compliance risk from 2027
European (TTF) Gas Price - EUR per MWh “One Month Forward Contract”
EUR 87.99
per MWh
TTF Dutch Futures EUR 88/MWh (~$165/boe)
UK NBP Futures 219p/therm (~$168/boe)
US Henry Hub Gas US$3.10/mmBtu (~$18/boe)
Corporate Presentation I 18 November 2026
7
ASX:
ADX
Corporate Presentation | June 2026
RECENT ACHIEVEMENTS and FOLLOW ON ACTIVITIES
Welchau-1 Oil Discovery Confirmed planning well deepening to gas target
18 MMBBL Pmean 1,2 up dip oil and 387 BCF Pmean 1,2 deeper gas condensate play
Well Deepening permitting and planning (approx. 700m) to access down dip gas play in 2027
7
Production growth, Austrian shallow gas appraisal, Sicily Channel gas play expansion and Welchau deepening
Sicily Channel resource confirmation and gas play expansion
Updated resource estimates 619 BCF Pmean 1,3 confirmed by Independent review
Three new permit applications to access further resource potential and play expansion
HOCH-1 shallow gas discovery gas zone testing program
4 zones tested - commingled gas flow 3.1 MMSCFPD at approx. 550 BOEPD
Further testing of deeper potentially extensive gas zone scheduled December 2026
Welchau -1 Up dip oil testing operations
1Refer to Cautionary Statement in slide 4 of presentation
2Prospective Resources reporting update 9.11.2026; see slide 21
3Prospective Resources reporting update 2.12.2025; see slide 21
4 30 September 2026 Quarter Ended Average Rate
Austrian production growth by 24% to 246 BOEPD4 new program commenced.
45 BOEPD increase in Vienna Basin Field production
Work program that commenced on 27 October 2026 is expected to deliver additional 100 BOEPD
GOLD-1 shallow gas well drilling program14 days drilling duration
Empyrean 2 for 1 earn in transaction completed – multiple party interest continues
Drill site preparation is near completion and rig contracted for 4 January 2027 mobilisation
HOCH -1 zone -1 gas testing operations
Vienna Basin well work operations
Corporate Presentation I 18 November 2026
8
ASX:
ADX
Corporate Presentation | June 2026
ASSET DEVELOPMENT ACTIVITIES IN 2026 / 27
8
Focus on production growth, low risk gas reserves development and high impact exploration
5.3 MMBBLS Reserves growth
and 1550 BOEPD Production
growth
Gas well drilling
in Permit
619 BCF 3
Up dip Oil Appraisal
18 MMBBL 1,2
Austrian near term production enhancement
Welchau gas appraisal – Upper Austria
Sicily Channel gas exploration trend
Vienna Basin Fields behind pipe and well work program
November and December 2026
Increase existing oil and gas production
by approx. 100 BOEPD to 350 BOEPD
Refer ASX Release 6 October 2026
1 Refer1 Cautionary Statement in slide 4 of presentation 2 P(MEAN) Prospective Resources - reporting date on 9.11.2026 – refer slide 21 3 P(MEAN) Prospective Resources - reporting date on 2.12.2025 – refer slide 21
Upper Austria shallow gas & near field oil
Drill low risk gas program – HOCH-1 , GOLD and SHOE
HOCH-1 tested gas at 3.1 MMCFPD equiv. to 550 BOEPD
Phase 2 deeper zone testing late December 2026
GOLD-1 well 4 January 2027 mobilisation and 14 days drilling
Pergen Near field Oil Prospect targeting Q3 2027 (subject to farmout)
(1,000 BOEPD potential)
Well Deepening to reach gas target updip of Molln-1 discovery
WELL-1 planning and permitting for deepening in Q4 2027
Reach gas duplex 600 to 700 m below well TD
Resource potential 387 BCF + 14 MMBBL 1,2
P(mean)
Mature existing gas prospects with 3D seismic for drilling
Continue to build acreage position in biogenic gas play
Confirmation of licence applications December 2026 & January 2027
619 BCF P(mean) 1,3 prospective resources
Three additional gas permit applications
Additional oil potential in Nilde Oil Field
Shallow gas program production
Key Targets
Corporate Presentation I 18 November 2026
9
ASX:
ADX
Corporate Presentation | June 2026
AUSTRIA NEAR TERM WORK PROGRAM
9
Focus on production growth, shallow gas commercialisation and near field oil exploration
01
HOCH-1 Gas Discovery
02 03 04
Vienna Basin Fields PERGEN-1 Oil
Near term
Operational
Sequence
Near term program to mid 2027
Vienna basin focus on production enhancement from
three existing wells commencing 27 October 2026
HOCH-1 testing and GOLD- 1 shallow gas prospects
drilling to follow;
• Testing of HOCH-1 to establish commerciality
• GOLD-1 a low-risk prospect 300m from pipeline,
partially farmout funded and further farmouts likely
PERGEN-1 near field oil prospect has been matured
for drilling. Permitting and land acquisition has
commenced.
• Timing of drilling will be subject to ongoing
farmout discussions.
1Refer to Cautionary Statement in slide 4; 2 Prospective Resources reporting update 9.11.2026; see slide 21; 3 Estimate includes oil and solution gas
Austrian Production and Exploration Portfolio
2
3
4
Anshof Oil Field
1
8.3 BCF P(mean) 1,2 4 at
100% economic interest
Phase 2 Production
testing at 50% economic
interest
Production enhancement
program 100 BOEPD at
100% economic interest
Near-field oil prospect
6.5 MMBOE P(mean) 1,2,3
at 100% economic interest
Welchau Oil Discovery & Deep Gas Target
GOLD-1 Shallow Gas
Vienna Basin Oil Fields
Oil and Gas production
enhancement program
GOLD-1 Well
PERG-1 Well
4 Refer ASX announcement 14 September 2026 – partner to earn 10% by funding 20%
Corporate Presentation I 18 November 2026
10
ASX:
ADX
Corporate Presentation | June 2026
ESTABLISHED PRODUCTION BASE IN AUSTRIA
10
Low-decline operated assets with development upside and infrastructure capacity
70% Economic Interest
Anshof Oil Field
Current rate – approx. 100 BOPD GROSS
100% Economic Interest
Vienna Basin Fields
Current rate – approx. 175 BOEPD GROSS
High value, low
royalty production
with development
upside
1.47 mmboe
2P developed
reserves 1
Land ownership, oil
piped to Vienna
refinery & access to
gas network
High value oil
from high quality
sandstone
reservoirs
3,000 bpd facility
and multiple near
field appraisal and
exploration targets
Oil transported
via truck and rail
to Vienna
refinery
1 Reserves Reporting Date & Valuation (Independently Audited) 04.11.2021 less production to 31 December 2025
Well work program in
Q4 2026 is expected
to deliver 100 BOEPD
Corporate Presentation I 18 November 2026
11
ASX:
ADX
Corporate Presentation | June 2026
VIENNA BASIN PRODUCTION WELL WORK AND HOCH-1 TEST PROGRAM
11
The Vienna Basin program commenced on 27 October 2026 targeting 100 BOEPD incremental production
Well work Program Update
Vienna Basin GA-093 gas zone well re-completion Week Commencing 9 November 1
Vienna Basin GA-072A oil well pump replacement Week Commencing 16 November
– GA-093 gas zone well rod pump installation to lift oil inflow into the well after GA-072A work
HOCH-1 Phase 2 gas testing Week Commencing 15 December
Vienna Basin well new oil zone completion Week Commencing 12 January 2027
The MB well services AW24 rig at the GA-93 well
at ADX’ Vienna Basin Fields
1 GA-093 Well performance
Following the gas inflow of 1.8
MMSCFPD reported for the GA-
093 well on 11 November 2026
oil inflow was recorded into the
well suppressing gas flow.
Provision has been made to
install a pump in the well that will
allow simultaneous gas and oil
production.
The production Performance
of GA-093 and GA-072A
wells is expected during week
commencing 30 November
2026
Rig and personnel sharing between Vienna Basin and Upper
Austria provides operational synergies and cost savings
Corporate Presentation I 18 November 2026
12
ASX:
ADX
Corporate Presentation | June 2026
HOCH-1 SHALLOW GAS DISCOVERY TESTING
12
Further testing of gas discovery (50% economic interest)
1Refer to Cautionary Statement in slide 4; 2 Prospective Resources reporting update 9.11.2026; see slide 21;
01
Phase 2 program will test
the largest net-pay & best
porosity reservoir in well
(ZONE #6)
Nearby gas wells,
producing fields and
newly processed 3D
PSDM indicate the largest
resources upside
potential which is in line
with pre-drill assessment
resources.
73 km2
GOLD-01
8 bcf Mean pre – drill resources
estimate 1, 2
3.1 MMSCF/D (550 BOEPD)
commingled rate tested from 4
zones (refer ASX release 28
August 2026)
Phase 2 production testing is
scheduled for mid December 2026
NEW 3D PSDM SEISMIC – provides further insights on sand distribution
02
Corporate Presentation I 18 November 2026
13
ASX:
ADX
Corporate Presentation | June 2026
GOLD-1 SHALLOW GAS PROSPECT – Rig Mobilisation 4th of January 2027
13
GOLD Prospect 8.3 BCF P(mean) 1,2,3
1Refer to Cautionary Statement in slide 4; 2 Prospective Resources reporting update 9.11.2026; see slide 21; 3 Refer ASX announcement 14 September 2026 – partner to earn 10% by funding 20%
Low risk gas prospect with well defined seismic
amplitudes diagnostic of gas
Seismic calibrated to nearby gas wells
Well site construction is near completion, drilling time
of 14 days.
300m from pipeline enabling low cost and rapid tie in
Exceptional economics - Net revenue for the project
is EUR 34.8 million for an investment of EUR 3.7 million
based on EUR 35 per MWh.
* Current gas price is EUR 88 per MWh.
GOLD prospect within the GOLD
Cluster Area
3D seismic line (SW-NE) through the GOLD-1 showing a
trajectory targeting two Hall basin floor gas sand “A” and “C”
Corporate Presentation I 18 November 2026
14
ASX:
ADX
Corporate Presentation | June 2026
PERGERN NEAR FIELD OIL PROSPECT
14
Material resource potential, low drilling costs and rapid development cycle time
PERGEN is a material, prospective short development cycle, oil exploration
prospect adjacent to producing fields that is matured for drilling
Large Resource Base of 6.5 MMBOE P(Mean) 1, 2, 3 with stacked pay and nearby
field analogues
Shallow, Low Cost Well approx. EUR 3.2 million
Rapid Commercialisation and robust economics due to infrastructure availability
Early Production possible from long term production testing
High value crude traded at Brent equivalent
Attractive farmout candidate due to size, low cost and low risk
1Refer to Cautionary Statement in slide 4 of presentation , 2 Prospective Resources reporting date update 9.11..2026 – refer slide page 21
3 Estimate includes oil and solution gas
Pergen Seismic Section Showing Well Path
Pergen Depth Map
Anshof Oil Field production facility with 3,000 BPD processing capacity
Corporate Presentation I 18 November 2026
15
ASX:
ADX
Corporate Presentation | June 2026
WELCHAU-1 GAS APPRAISAL ASSET – UPPER AUSTRIA
15
Deepen Welchau to test large deeper gas-condensate target not tested – approximately 700m below total depth
Original gas condensate target remains
undrilled – Well deepening Q4 2027
Gas target in pressure communication with
Molln-1
387 BCF gas + 14 MMBBL condensate 1,2
P(mean) Duplex 1 and 2 prospective
resources
1Refer to Cautionary Statement in slide 4 of presentation, 2 Prospective Resources reporting date update 9.11..2026 – refer slide page 21
Corporate Presentation I 18 November 2026
16
ASX:
ADX
Corporate Presentation | June 2026
STRATEGIC IMPORTANCE OF OFFSHORE SICILY
The Sicily Channel is the best
near-term option for getting Med
gas into Europe
Direct pipeline route available to
European markets via the
TransMed pipeline
Direct open access to Italian
pipeline system owned by SNAM
at Mazara del Vallo
Stable politics, shallow water and
clean biogenic gas (99% methane)
The Eastern Med is the most
proven gas play BUT currently
relies on LNG to access European
markets
Big push from super majors in
deep water frontier areas -
Offshore Greece and Malta
New areas require long
development cycle and pipeline
infrastructure
16
The Mediterranean Sea has become the new gateway for gas into Europe
ADX existing
permit plus three
new applications
TransMed
pipeline
Corporate Presentation I 18 November 2026
17
ASX:
ADX
Corporate Presentation | June 2026
SICILY CHANNEL GAS PLAY - C.R 150.AU PERMIT AND THREE APPLICATIONS
17
High impact gas resource potential in an emerging gas province with running room
RecentADX Permit
August 2025
ENI Gas Project
August 2024
and new applications
An emerging and newly producing offshore gas
province
Shallow water (<100 m), drill depths (700-1600 m)
Gas shows in wells and good quality legacy 2D
seismic
Proximity to tie in point onshore at Mazara (less
than 50 km from permit)
Stacked pay and productive sands
Sweet biogenic gas (99% methane)
Favourable fiscal terms with 10% royalty and
28% corporate tax
Applications for three additional gas permits
approx.,1650 km2 in highly prospective gas play
619 BCF P(mean)
prospective resources1,2
from 9 high-graded prospects in the permit
using historic data and new field data *
1 Refer to Cautionary Statement: see slide 4 2Prospective Resources reporting update 2.12.2025 – refer slide page 21
* Independent Review confirms play and ADX
resources estimates
Highly prospective permit for gas proven by
historic data from deeper oil exploration
Sicily Channel ADX’ C.R 150.AU Permit plus three additional applications
ADX Existing Permit
ADX New Applications
Corporate Presentation I 18 November 2026
18
ASX:
ADX
Corporate Presentation | June 2026
LARGE-SCALE GAS FAIRWAY WITH COMPELLING ECONOMICS
18
Extensive technical dataset underpins resource growth and future acreage opportunities
A biogenic gas play fairway identified from extensive data and past ADX
experience
Map shows distribution of the Pliocene-Quaternary (yellow) and Tortonian-
Messinian siliciclastic (orange) foredeeps
The Lippone-Mazara gas field (ENI 100%) and strong gas shows from the
Tortonian - Terravecchia Fm. sandstone reservoirs in historical wells
ADX has extensive knowledge of the play from exploration in nearby
Tunisian acreage including 3D seismic and drilling
Economics are compelling due to shallow water depths, shallow drill
depths, low royalty rates and high reservoir productivity.
Nilde Oil Field – remaining oil potential
Nilde Oil Field Potential - historic oil field in C.R.150.AU licence
The Italian Ministry of Environment and Energy Security (MASE) with
its Hydrocarbon and Georesources department (UNMIG) published a
note regarding the Nilde oil fields potential as a CO2 storage project
In conjunction with a Carbon Capture Storage project, the remaining
Nilde oil could potentially be recovered
C.R 150.AU
ADX historic acreage in Tunisia
Nilde oil field
New Legislation allowing oil
development being proposed
by PM Meloni
Indicative Revenue Split in US$ for 300 BCF case 1
Assumed gas price of EUR 35 MWh
1 Refer to Cautionary Statement: see slide 4
Corporate Presentation I 18 November 2026
19
ASX:
ADX
Corporate Presentation | June 2026
SICILY CHANNEL NEAR TERM ACTIVITIES
1 Permit applications subject to EU competition process
d 368 C.R-.AU Application - End of EU competition period 22.12.2026
d 369 C.R-.AU Application - End of EU competition period 30.01.2027
d 370 C.R-.AU Application - End of competition period 30.01.2027
19
Confirmation of permit applications and prospective resource review
d 368 C.R-.AU
d 369 C.R-.AU
d 370 C.R-.AU
Permit Applications 1
Three permit applications proximal to ADX’ existing C.R 150.AU Exploration Permit (346 km2)
The total area of the new applications as well as the C.R 150.AU Permit is approximately
1650 km2
Independent Review by RISC Advisory Pty Ltd (RISC), refer to ASX Release dated 6 July
2026, recognised that the Miocene aged, Terravecchia Formation is a valid biogenic gas play
in the Sicily Channel based on the analysis of the regional geology, offset wells with gas
shows and analogous discoveries at the nearby onshore Lippone-Mazara Terravecchia gas
field and the offshore gas developments at the Pliocene Argo-Cassiopea fields.
Resource Review
RISC found that ADX resource assessment for ADX’ existing C.R 150.AU Exploration Permit