Investor Webinar Presentation
Released
Released
Announcement PDF
An ASX listed European Energy
Producer and Explorer
Ian Tchacos - Executive Chairman
Paul Fink - Chief Executive
Dr Ulrike Exner - Chief Geologist
“Reliable energy doesn’t need to cost the earth”
I n v e ASX:
s t o rADX
Update
adx-energy.com
|
1 6 N o v e m b e r 2 0 2 3 | We b i n a r P r e s e n t a t i o n
ASX:ADX
2
Disclaimer Statement
Important notice:
This document has been prepared by ADX Energy Ltd (“ADX”) for the purpose of providing information to interested analysts, investors and shareholders. Any statement, opinions, projections, forecasts or other materials contained in this document do not constitute any commitments, representations or
warranties by ADX or its directors, agents and employees.
Except as required by law, and only to the extent so required, directors, agents and employees of ADX shall in no way be liable to any person or body for any loss, claim, demand, damages, costs or expenses of whatsoever nature arising in any way out of, or in connection with, the information
contained in this document. This document includes certain statements, opinions, projections, forecasts and other material, which reflect various assumptions. The assumptions may or may not prove to be correct. ADX recommends that potential investors consult their professional advisor(s) as
investment in the company is considered to be speculative in nature.
The information in this presentation is in summary form only and does not contain all the information necessary to fully evaluate any transaction or investment. It should be read in conjunction with ADX’ other periodic and continuous disclosure announcements lodged with the ASX. This document does
not constitute an offer, invitation or recommendation to subscribe for or purchase securities and does not form the basis of any contract or commitment.
Persons compiling information about hydrocarbons. Pursuant to the requirements of the ASX Listing Rule 5.31, 5.41 and 5.42 , the unaudited resources and reserves information contained in this presentation has been prepared under the supervision of Mr Paul Fink. Mr Fink is Technical Director of ADX
and a qualified geophysicist with 30 years of technical, commercial and management experience in exploration for, appraisal and development of oil and gas resources. Mr Fink has consented to the inclusion of this information in the form and context in which it appears. Mr Fink is a member of the
EAGE (European Association of Geoscientists & Engineers) and FIDIC (Federation of Consulting Engineers).
Independent audit of developed reserves have been completed for ADX’ Zistersdorf and Gaiselberg fields (“Fields”) in the Vienna basin and Anshof in Upper Austria (Austria) by RISC Advisory Pty Ltd (“RISC”). RISC conducted an independent audit of ADX’ Fields evaluations, including production forecasts,
cost estimates and project economics. Production from existing wells is classified as Developed Producing. Production from planned recompletion of existing wells to new intervals is classified as Developed Non-Producing. RISC is an independent advisory firm offering the highest level of technical and
commercial advice to a broad range of clients in the energy industries worldwide. RISC has offices in London, Perth, Brisbane and South-East Asia and has completed assignments in more than 90 countries for over 500 clients and has grown to become an international energy advisor of choice.
PRMS Reserves Classifications used in this presentation:
Developed Reserves are quantities expected to be recovered from existing wells and facilities.
Developed Producing Reserves are expected to be recovered from completion intervals that are open and producing at the time of the estimate.
Developed Non-Producing Reserves include shut-in and behind-pipe reserves with minor costs to access.
Undeveloped Reserves are quantities expected to be recovered through future significant investments.
A. Proved Reserves (1P) are those quantities of Petroleum that by analysis of geoscience and engineering data, can be estimated with reasonable certainty to be commercially recoverable from known reservoirs and under defined technical and commercial conditions. If deterministic methods are used,
the term “reasonable certainty” is intended to express a high degree of confidence that the quantities will be recovered. If probabilistic methods are used, there should be at least a 90% probability that the quantities actually recovered will be equal or exceed the estimate.
B. Probable Reserves are those additional Reserves which analysis of geoscience and engineering data indicate are less likely to be recovered than Possible Reserves. It is equally likely that actual remaining quantities recovered will be greater than or less than the sum of the estimated Proved plus
Probable Reserves (2P). In this context, when probabilistic methods are used, there should be at least a 50% probability that the actual quantities recovered will equal or exceed the 2P estimate.
C. Possible Reserves are those additional Reserves that analysis of geoscience and engineering data suggest are less likely to be recoverable that Probable Reserves. The total quantities ultimately recovered from the project have a low probability to exceed the sum of Proved plus Probable plus Possible
(3P) Reserves, which is equivalent to the high-estimate scenario. When probabilistic methods are used, there should be at least a 10% probability that the actual quantities recovered will equal or exceed the 3P estimate. Possible Reserves that are located outside the 2P area (not upside quantities to
the 2P scenario) may exist only when the commercial and technical maturity criteria have been met (that incorporate the Possible development scope). Standalone Possible Reserves must reference a commercial 2P project.
Prospective Resource Classifications used in this presentation:
Prospective Resources are those estimated quantities of petroleum that may potentially be recovered by the application of a future development project(s) related to undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development. Further explorations
appraisal and evaluation is required to determine the existence of a significant quantity of potentially moveable hydrocarbons.
P(90) Estimate: means at least a 90% probability that the quantities actually recovered will equal or exceed the estimate.
P(50) Estimate: means At least a 50% probability that the quantities actually recovered will equal or exceed the estimate.
P(10) Estimate: means At least a 10% probability that the quantities actually recovered will equal or exceed the estimate.
Oil and Gas Conversions
BOE means barrels of oil equivalent. Bcfe means billion of cubic feet of gas equivalent. Gas to oil conversion used in this presentation: 6 mcf of gas = 1 barrel of oil. Mcf means thousand cubic feet of gas
Investor Presentation – 16 November 2023
A Compelling Investment
Proposition and Operating Strategy
Strong
Underlying
and Increasing
Cashflow
Meaningful
Reserves and
production
Growth from
New Discovery
336 boepd
oil & gas production1
World-class
Exploration
Portfolio in the
heart of Europe
3
Value Adding,
Complementary
Renewable
Projects
Capability
• Ability to
evaluate,
generate
and
operate
projects
4.3 mmbbl 2P
213 mmbboe
reserves2
prospective resources
3
Farmouts
• Industry
funding
provides
validation &
risk
reduction
47 MW combined
renewable energy
potential
Prospective Resources are those estimated quantities of petroleum that may potentially be recovered by the application of a
future development project(s) related to undiscovered accumulations. These estimates have both an associated risk of discovery and a risk
of development. Further explorations appraisal and evaluation is required to determine the existence of a significant quantity of
potentially moveable hydrocarbons
1 August 2023 average production from the Zistersdorf & Gaiselberg fields and Anshof field. 2 ref. ASX release dated 31 October 2022 varied for MND transaction dated 18 September 2023, 3 Best
technical prospective resources for Upper Austria only. Prospective resources reporting date update 22.06.2023
Investor Presentation – 16 November 2023
4
Corporate and Asset Summary
Positioned for a smarter, cleaner future for Europe
Austria Oil & Gas Assets
Austria Clean Energy Projects
Vienna Basin fields – 100% (production)
Anshof oil discovery – 50% (production & development)
ADX-AT-I & ADX-AT-II – 100% (exploration & appraisal)
Vienna Basin Green Hydrogen project – 100%
GMU geothermal project – 100%
Vienna Basin solar project – 100%
Financial information
Share price as at 15.11.2023
A$ 0.12
Number of shares
363.1 m
Number of options
42.2 m
Market capitalisation
A$ 43.6 m
Cash (unrestricted) as at 30.09.2023
A$ 5.7 m
Debt (net of restricted cash for debt)
A$ 2.2 m
Enterprise value
A$ 40.1 m
Number of shareholders
2,071
Political & Strategic position
Stable jurisdictions with unmet energy demand
d363C.R-.AX permit (Italy)
Romania Oil & Gas Assets
Excellent access to infrastructure
Shallow waters offshore exploration permit – 100%
369 Bcf prospective resources1 (5 prospects)
Subject to ratification by the Italian authorities
49.2% shareholding in Danube Petroleum which holds:
- Parta exploration licence – 100%
- Iecea Mare production licence – 100%
Strong focus on energy security since Ukraine war
Refer to Cautionary Statement in relation to Prospective Resources on Page 3 of
this presentation
Investor Presentation – 16 November 2023
1 The original resources reporting date was on 30.08.2022
Operatorship capability & boots on the ground
Our focus is on Austria
5
A great place to build an energy business rapid pathway to cashflow >> lots of
running room >> high value hydrocarbons >> stable & transparent jurisdiction
A significant oil and gas industry
1 billion bbl oil & 2.7 Tcf gas
produced to date
75 Years oil & gas duopoly
before ADX become the third operator
in country
Energy Demand is unmet by
local supply resulting in High
Value Markets
Upper Austria Assets
Production, Exploration &
Geothermal
50% exploration success rate,
infrastructure access, 3D seismic data set
& extensive portfolio
Investor Presentation – 16 November 2023
ADX Vienna Basin Fields
Oil and gas production,
H2 production & storage, Solar Park
Stable long life production, depleted
reservoirs for storage & connected to power
grid as well as oil gas pipelines
Excellent Infrastructure that is
highly accessible and Regulatory
Processes are favourable & fast
¹ In Upper Austria since 2000 -11 discoveries out of 22 wells
6
Recent highlights
Welchau Gas Prospect Anticline
Last twelve months of activities
Showing Mapping based on Surface Geology
Surface expression of Welchau gas
prospect 100 km2 area anticline
Financial
Increasing revenues, cashflow and deleveraging in 2022
•
Sales up to A$14.4 million (+59%) / Operating Revenue up to A$7.7 million
(+85%) / Loan Repayment A$3.3 million (Vienna basin field acquisition)
Transactions
•
Welchau farmout MCF Energy transaction 50% well funding for 20% interest
•
Anshof investment agreement A$19 million MND funding for 30% interest
•
Endorsed partnership framework enabling multiple exploration investments
Production operations at Anshof-3 well
site
The Welchau Prospect has 23 km lateral extension, 100 km² area and vertical relief of 2140 m (max.)
Asset Development
•
Anshof independent reserves review 2P Reserves 5.2 MMBOE 1(50% net to ADX)
•
Anshof-3 commercial production approx. 140 bopd (50% net to ADX)
•
Austria portfolio development Best case prospective resources of 213 MMBOE 2
•
Operational readiness to drill Anshof-2 (spudded in Nov-23) and Welchau-1
Refer to Cautionary Statement in relation to Prospective Resources on Page 3
of this presentation.
Investor Presentation – 16 November 2023
¹ Reserves reporting date 31.10.2022. 2 Prospective resources reporting date update 22.06.2023
7
Planned Activities
A period of high activity funded by farmouts and cashflow
Appraisal well
Anshof field development drilling &
production capacity enhancement
Welchau- 1
2 new production wells (120 to 750 bopd)
Production capacity increase to 3,000 bopd
Anshof-2
Exploration well
Anshof
permanent
production
facility
Anshof-1
Production well
IRR-1
Exploration well
GRB-1
Anshof follow up
Shallow Gas Play
Multi well program
Investor Presentation – 16 November 2023
Gas exploration drilling
Sep
Welchau-1 drilling and play expansion
Near field gas exploration
New rapid gas commercialisation play
Sept-22
Anshof reserves development & near
field oil exploration
Reserves growth and tie-in opportunities
Further farm-in transactions
Funding for additional exploration activity
Portfolio development
Ongoing expansion of portfolio
Complementary renewable projects
7
Vienna Basin Production
provides a
a solid, stable cash flow base and a renewable
energy hub
8
9
Austrian Production and Development Assets
Stable, high value production with long term potential
A long-term future for Vienna Basin Fields
Vienna Basin Fields (100% interest)
✓ Low emission, low decline production delivering
long term cash flow (approx. 250 boepd)
✓ Ownership of 13.7 hectares of land suitable for
Solar Park - 65 Km from Vienna
•
•
A unique position – own the land + storage reservoirs + green
power + connected to pipelines + availability of fresh water
Addition of Solar Park, Hydrogen generation and Hydrogen
Storage for planned hydrogen back bone
✓ High value sweet crude oil (no royalties)
Wind park adjacent to ADX Vienna Basin Fields
Production operations at ADX Vienna Basin Fields
Multilayer field
suitable for H2
storage
1.72 mmbbl
2P developed
reserves Note 1
Investor Presentation – 16 November 2023
Pipeline to
Vienna refinery
& gas pipeline
Note 1: Reserves Reporting Date & Valuation (Independently Audited)
04.11.2021 less production to 31 December 2022
Anshof-3 production well and Early Production
Unit, Anshof-2 and 1 drilling locations
2 Independently Reviewed ref. ASX release dated 31 October 2022 3 Estimated Net Present Value
discounted at 8% real. (NPV8) of the 2P gross reserves
Anshof oil field – Strategic summary
Learnings to date
Relevance for ADX?
✓ Ability to get on the ground to
drill in less than 6 months
▪
Secure industry funding to
accelerate project
✓ Discovery well has proved up a
new structural model with
positive implications for Anshof
& follow up prospects
▪
Anshof-2 and Anshof-1 wells
have large production rate
potential thereby enhancing
economics
✓ Anshof-3 well performance above
expectation supporting upside
potential
▪
✓ High value product (Brent – 2%)
delivered to refinery gate
▪
✓ Access agreements and
availability of infrastructure has
enabled immediate
commercialisation
▪
Large upside exists at relatively
low risk 5 times multiple to 2P
reserves
Ability to scale up quicky and
cheaply due to installation of
permanent facility
3,000 BOPD capacity
Substantial, adjacent follow up
prospects held at 100% interest
Transactions,
valuations and
Independent Audits
▪
Independent Audit by
Risc - A$ 71 million 1
▪
MND transaction
implied – A$ 19 million
for 30% interest 2
▪
Auctus Advisors UK –
A$ 77 million 3
1 Independently Reviewed ref. ASX release
dated 31 October 2022 - Estimated Net
Present Value
2 Ref. ASX release dated 5 September 2023
3 Auctus Advisors LLP valuation report
dated 16 October 2023
The best place to find more oil is where you have already found it!
10
ANSHOF Update
Anshof-2 appraisal well opportunity
to build production, cashflow and reserves
11
12
Anshof-2 Drilling Update
Current Status of Operations
•
•
13 November 2023: Spud Date
15 November 2023 (06:00hrs CET): Drill depth @ 108m
Permit:
ADX AT-II
Well scheme
Success case
Well name: ANSHOF 2
UWI: ANS-002
Directional waypoints:
Spud-in point :
E 67587.81
N E; N; TVDSS [m]
5319705.08
Elevation
Target 1: 68351.7; 5319577.8; -1661.8
(MSL): 406.6 m
Target 2: 68600; 5319515; -1711.2
RT above GL: 6,23 m
Target shape:
Polygon
Wellpath: high angle slanted
Scheme not scaled. All depth on this page count from Ground Level.
Depth MD
[m]
Next 24 hrs: Drill to Section TD (130m) / Run 13 3/8” casing
Next hole section (12 ¼” hole): Mud weight increased (shallow gas
and fault zone)
100
Quarternery
Flysch
Top depth
[mMD]
0
20
200
300
400
500
Imbricated
Puchkirchen Fm.
400
600
Wellscheme
Casing and Cementation
Directional
Mud and drilling problems
20" Conductor 4 m
13 3/8" 54.5# K55 BTC
130 m
Gel 1.20
K2CO3 Polymer mud
1.25 kg/l
•
•
Stratigraphy and Mud system
Formation
0
Shallow
gas 150200 m
12 1/4" Hole
Class G 1.9 kg/l
Fault
zone
350..390
m
KOP @ 450 m
Az. 97.29°
DLS 3°/30 m
EOB @ 650 m
9 5/8" 40# L80-1 BTC
730 m
700
Incl. 20.02°
800
900
IMB PK Gas Sands
874
Class G 1.7 kg/l Lead
1000
1100
1200
K2CO3 Polymer mud 1.30 kg/l
1300
1400
1500
1600
1700
1800
1900
2000
2100 Zupfing Fm.
2073
2200 Eggerding Fm.
2153
2246
2278
2318
Dynow marl
2300 Schoeneck Fm.
Upper Eocene
8 1/2" Hole
KOP 2 @ 1871 m
Az. 104.2°
DLS max. 4°/30m
Class G 1.9 kg/l Tail
EOB 2 @ 2315 m
2400
Incl. 79.10°
2500
2600
Upper Cretaceous
2700 TD (TVD 2132 m)
2800
Investor Briefing – 16 November 2023
2598
2650
7", 26 lbs/ft, L80, BTC-TXP
TD 2650 m
EOT @ 2650 m
TVD 2132 m
13
Anshof production to date
Anshof-3 Results – Independent
review (RISC Advisory Pty Ltd, Oct
Aveage daily production by month
140
2022):
1P reserves (proven): 0.5 MMBOE
5.2 MMBOE
Average Production of 115 BOPD 2P reserves:
3P + 3C reserves:
26 MMBOE
120
100
80
Ref. ASX release dated 31 October 2022
60
40
No pressure decline
No water
20
Anshof-3 Long-term Testing
2022
Anshof-3 exploration drilling
Investor Briefing – 16 November 2023
2023
Sep
Aug
Jul
Jun
May
Apr
Mar
Feb
Jan
Dec
Nov
0
Oct
Monthly Production (BOPD)
Anshof-3 (BOPD)
• Oct 2022 until Sep 2023
• High quality crude oil (Brent
equivalent)
• Well was shut in after reaching the
regulatory limit of 5,000 Tonnes
(36,000 Barrels) of test production
• Stable
water
free
rate
of
approximately 140 barrels per day
• No pressure decline was observed
• Anshof-3
production
will
recommence after the drilling of the
Anshof-2 well and the installation of
a permanent production facility in
February 2024
Anshof-3 long term test production
14
Anshof reserves
development potential
ANS-3 producer
ANS-2 drilling now!
Current 2P reserves area: 6.5 km2 –
5.2 mmboe 1
ODT : - 1720 m TVDSS
Post ANS-002 Success Case:
New 2P reserves area:
5.2 – 26 mmboe
ODT shown: -1780 m
280 m Eocene sst.
reservoir section
HGN-001
(1975)
Current 3P+3C area:
25 km2 – 26 mmboe 1
ANSHOF structure map
Anshof-2 will target thicker Eocene sandstones on the Anshof structure (ca. 1.8 km SE of Anshof-3) with a high angle
well (providing a large reservoir intersection). Expected production rates: 300 bbl/d.
• The well will test the currently prognosed oil water contact which corresponds to a 2P reserves base of 5.2 MMBOE 1
• In the success case this would result in a significant increase of proven and probable reserves:
1P reserves (ANS-2 success case): 5.2 MMBOE 1
2P reserves (ANS-2 success case): 5.2 – 26 MMBOE
Investor Briefing – 16 November 2023
1
Ref ASX release dated 31 October 2022
15
Anshof permanent production
facilities (PPF)
Anshof-3 production well and Early Production Unit,
Anshof-2 and -1 drilling locations (April 2023)
• Anshof site has three drilling slots - Anshof-3 production well, shut in since 15
Sep 2023; Anshof-2 spud on 13 Nov 2023 and Anshof-1 which is anticipated to
be drilled in Q2 2024
• Anshof field permanent production facilities (PPF):
• procurement, planning and design work has been undertaken
• currently shipped to Anshof location
• installation in January 2024 and commission in February 2024
• replaces early production unit used for ANS-003
• simultaneous production of the Anshof-2, Anshof-3 wells then Anshof-1
• Facility capacity is approx. 3000 barrels of oil per day enables use as
central processing facility for further Anshof development wells
• Production will initially be trucked to a nearby train loading facility as per
Anshof-3 well. Longer term plan to construct pipelines to nearby export
facilities less than 4 km from the Anshof-3 location
Investor Briefing – 16 November 2023
Permanent production facility (currently being
transported to Anshof location)
16
Anshof 2P project timeline &
expected production build up
Near Term Project Activities
Existing
Anshof-3
Production
To Sept 23
Drill
Anshof-2
Well
Nov 2023
Install
permanent
production
facility
Jan & Feb
24
Commence
Production
Anshof-3&2
Feb 24
Drill
Anshof-1
well
Q2 24
ADX 2P production profile and reserves case
Based on five development wells
Investor Briefing – 16 November 2023
17
Anshof near field Eocene
oil exploration
NNW
Well (projected)
SSE
ANS-3
Wells (projected)
Anshof
SGB
structure
thrust anticline
GRB footwall
structure
ANSHOF
follow up
prosects
& leads
The new depositional and tectonic model opens several follow-up opportunities on the adjacent Eocene blocks:
•
•
•
GRB is a low-risk, high-reward oil appraisal project: Historic ASCH-1 well on structure proved oil flow to surface. GRB has 9.5
MMBOE 1 best technical prospective resources
SGB is located 1 km to the North of ANSHOF on the next Eocene block with 2.8 MMBOE 1 best technical prospective resources.
The prospect is significantly de-risked by Anshof discovery.
LIND and WIND target shallower Eocene blocks to the N with 1.4 MMBOE 1 best technical prospective resources
Refer to Cautionary Statement in relation to Prospective Resources on Page 3 of this presentation
Investor Briefing – 16 November 2023
1 Best technical prospective resources for Upper Austria only. Prospective resources reporting date update 22.06.2023
18
Anshof field discovery
New thinking proven by Anshof-3 discovery
OLD: NORMAL FAULT MODEL
Eggd.
Eocene.
The new depositional concept explains the
primary distribution of Eocene reservoir
sandstones, with depocenters located
between Cretaceous thrust anticlines.
THE SMOKING GUN
A new structural concept, which consists
mainly of basement-involved thrusting, was
key to the exploration success at Anshof-3:
Cretaceous.
Basement.
NEW: THRUST FAULT MODEL
• based on thorough core and log analysis
and its incorporation (abundant beddingparallel slickensides in almost all core
samples; obvious duplications in logs)
• gives a better explanation of the seismic
image which shows crests and troughs of
top EO and other strata typical for
shallow angle thrusting
• is able to explain the observed
production behavior limited by faults on
seismic scale whereas the old model
(based on normal faults) could not.
Investor Briefing – 16 November 2023
Eocene sst. oil reservoir
Bedding-parallel slickensides in cores
Eocene
Eocene
reservoir
reservoir
Basement
Eocene
reservoir
Basement thrusting on top of Eocene
in nearby oilfield
1 19
9
ANSHOF & follow-ups
2021
ADX drills ANS-3
Anshof
Oil Field
ANS-1
Planned
Now
ADX drilling ANS-2
Current 2P reserves area:
6.5 km2 – 5.2 mmboe
ODT : - 1720 m TVDSS
Post ANS-002 Success
New 2P reserves area:
5.2 – 26 mmboe
ODT shown: -1780 m
GRB
Exploration
Prospect
1975:
Strong oil shows
Anshof area exploration history
Upside appraisal and exploration potential defined by historic wells
Investor Briefing – 16 November 2023
1965:
oil to surface
Upper Austria Exploration
Portfolio origination by experienced team,
port-folio growth and drilling activity funded by
farmouts
20
Upper Austria Exploration
High impact, drill ready portfolio in the heart of Europe
1
2
3
4
1020 km2
807 bcfe1 World-class Welchau
acreage
gas prospect to be drilled in 2023.
20
Adjacent to tested gas discovery at Molln
2
Anshof near field, low risk follow
up oil prospect at GRB 9.5 mmbbl1
provides rapid pathway to further reserves
and cash flow
Multiple High Impact Gas
Prospects
3
3500 km2
4
3D Seismic
Infrastructure
Access
Prospects and new High Value
Shallow gas play identified with state of
the art AI seismic processing
ANSHOF
18 MW Geothermal low risk, long
1
term potential with shallow oil and gas
targets provides new opportunity
191 mmboe 1
Refer to Cautionary Statement in relation to Prospective Resources on Page 3 of this presentation.
Investor Presentation – 16 November 2023
¹ Best Technical Prospective Resources Prospective resources reporting date update 22.06.2023
.
213
1
22
Upper Austria Exploration Value Offering
Proven basin with exceptional growth potential
ADX approaching the top of the value
pyramid for oil and gas in Upper Austria
Value realization at Anshof
✓
✓
2 new high productivity development wells to develop 5.2 1 mmbbls 2P gross reserves
Installation of permanent processing facility with 4000 bopd capacity
Value creation
Multi well exploration drilling program
✓
✓
At least 2 gas exploration wells will be drilled in the next 12 months funded by farmins
Follow up oil targets to Anshof and new shallow gas play identified with AI techniques
Value proposition
Large drill ready portfolio of oil and gas exploration prospects
✓
✓
Risk Reduction
Increasing value
Development drilling, increasing production and Reserves
213 2 MMBOE best estimate prospective resources
Funding and risk reduction via industry farmouts enabled by development of partnership structure
Identified Upper Austria as a Core Area
High exploration success rate, large 3D data set & infrastructure, high value hydrocarbons
✓
✓
Portfolio of exploration prospects proximal to strong markets for oil and gas
Knowledgeable, experienced local exploration team
Refer to Cautionary Statement in relation to Prospective Resources on Page 3 of this presentation.
Investor Presentation – 16 November 2023 1 ASX release dated 31 October 2022, 2 Best technical prospective resources for Upper Austria only. Prospective resources reporting date update 22.06.2023
23
Welchau-1 Giant Gas Prospect
Preparation for drilling and multiple follow ups if successful
•
Drilling permit for Welchau-1 well has been secured with
commencement of drilling expected in Q4 2023
•
Research funding provided to University of Vienna for
collaborative assessment of Welchau area potential
•
Four Welchau follow up prospects generated in same
structural
setting
Welchau
Gas Prospect Anticline
Showing Mapping based on Surface Geology
World-class Welchau gas prospect
Adjacent to the Molln-1 gas discovery that tested condensate
rich gas in 1989. Shallow drill depth & 19 km from national
pipelines
The Welchau
Prospect
has 23 km lateral
extension, 2023
100 km² area and vertical relief of 2140 m (max.)
Investor
Presentation
– 16 November
Welchau Gas Prospect
Prospective Recoverable Resources Estimates
Gas
Oil equivalent
Condensate
Total Oil Equivalent
Total Gas Equivalent
Mcf per BBl conversion used
Minimum
171
29
6.8
35
212
BCF
BOE
BBls
BOE
BCFE
6
Best Technical
651
108
26
134
807
Maximum
1315
219
52.6
272
1631
ASX Prospective Resources reporting date 22.06.2023
Refer to Cautionary Statement in relation to Prospective
Resources on Page 3 of this presentation.
Follow Up
1
Follow Up 24
WELCHAU-1
400 m gas column proven, 900m from
RFT, that flowed 3.8 mmscf/d for 16
days
Gas presence (proven or expected)
24
IRR–1 Gas Prospect
New work results in (+110%) resources increase
New technical interpretation using seismic responses indicative of
gas and nearby well data
IRR Prospect
Min
(P90)
Best Technical
Max
(P10)
Mmboe
1.6
6.3
13.1
Analysis of analogous gas reservoirs in nearby gas field has led to a
significant upward revision of expected possible gas net pay thickness
Bscf
10
38
79
3D seismic response similar to adjacent gas field which has produced
~155 bscf of gas
Expected Miocene deep water turbidite reservoirs have a proven flow
capacity of up to 45 mmscf/day
•
•
E
155 Bscf
gas field
E’
155 Bscf existing field
IRR-1
IRR Prospect
IRR-1
Refer to Cautionary Statement in relation to Prospective Resources on Page 3 of
this presentation.
Investor Presentation – 16 November 2023
25
New Trend of Low Risk, Shallow Gas Prospects
Portfolio addition from new ideas and state of the art techniques
New gas prospects have been matured
Combination of AI Software, an international team of
stratigraphic trap experts and local knowledge leading to deep
understanding of unexplored gas potential
• Large stratigraphic upside potential
• Proven high permeability reservoirs (10 mmscf/day per well)
• Multiple additional prospects being generated
Prospect
Fluid
(Expected)
Best Technical
Recoverable
(MMboe)
Best Technical
Recoverable
(BScf if gas)
SCHOE
GAS
1.1
6.6
HOCH
GAS
0.8
4.8
GAST
GAS
0.6
3.6
ADX AT-I license
A.I. software on 3D seismic detects channels
and rivers as they flowed 22 Mio years ago
Investor Presentation – 16 November 2023
Refer to Cautionary Statement in relation to Prospective Resources on Page 3 of this presentation.
26
Geothermal Prospect with Oil and Gas Targets
The GMU prospect combines geothermal opportunity with multiple
overlying oil and gas targets defined on 3D seismic
Jurassic fractured
Geothermal opportunity (fractured Jurassic limestone) is a proven play in
proven limestone
the Molasse basin. 3D seismic attributes analysis indicating oil and gas
geothermal reservoir @
potential in stacked targets which can be accessed by a single well
110 deg C
• High productivity reservoirs with best technical resource 3.9 mmboe
•
Geothermal potential of 18 MW thermal power
•
Market opportunity for district heating and power generation
Top Malmian
depth structure
Map showing many large geothermal projects (blue
symbols) in Bavaria in same reservoir as GMU Project
GMU project
Source: Bavarian Ministry for Environment
3D Seism